NBS Source
I'm a manufacturer

"construction plant equipment"

8,107 results found

Sort by:

Showing 1369-1383 of 1383

Sponsored
Royal College of Pathologists

Royal College of Pathologists

Cordek Ltd

The Royal College of Pathologists have relocated their London Headquarters to the rapidly changing area of Aldgate, on the Eastern fringes of the city. The new seven storey structure replaces an existing office block, providing a flexible and environmentally efficient building to house their growing needs. The building design includes major conference facilities, meeting rooms, offices, a multi-function auditorium, exhibition space, restaurant facilities and accommodation. Cordek were asked by the specialist concrete frame contractor Oliver Connell & Son to devise a formwork system to allow the construction of ribbed concrete floors.
Sponsored
The Hub, Hattersley - Leaking Podium Deck

The Hub, Hattersley - Leaking Podium Deck

Delta Membrane Systems Ltd

Delta were employed to assist on this leaking podium deck project. Following a full assessment of The Hub and its underground parking facilities it was identified that rainwater was entering the basement car park through the ceiling deck at multiple points. These points included holes that were formed to allow drainage from the surface, movement joints and investigation holes that had been created through the steel rib and concrete deck. Based on “as built plans” a system was designed post construction that would offer the same quality of structural protection had it been incorporated during the build phase.
Sponsored
APL Case Study -  StrongBak™ - BMW Swindon Press Shop

APL Case Study - StrongBak™ - BMW Swindon Press Shop

Architectural Profiles Ltd

Year: 2019Architect: Maber Assembly:·        Walls – APL StrongBak™ with external vertical APL profiled cladding Size:·        Approx 23,000 m² of StrongBak™ & APL external wall profiles Special Features:·        StrongBak™ system requested direct from client·        A follow-on project from the new BMW Mini factory in Oxford, which APL supplied as the same construction assembly and area·        Building 23m high·        All materials delivered to site within a 6-7 week period Building Location:·        Swindon, Wiltshire
Sponsored
Tombola HQ, Sunderland (2018)

Tombola HQ, Sunderland (2018)

Artform Urban Furniture Limited

Gaming giants Tombola recently completed the construction of their flagship £7m headquarters at Wylam Wharf in Sunderland. It is situated within a conservation area on the banks of the River Wear. In line with the overall design brief, the high-quality natural materials used were to reflect the location of the site within the conservation area. Artform were specified to supply extremely durable tropical hardwood timbers, given the coastal location for the benches and picnic sets provided. The scheme has created an improved environment for staff whilst establishing a network of paths linking to the wider area.
Sponsored
Levita House, Window Replacement Scheme, London Borough of Camden

Levita House, Window Replacement Scheme, London Borough of Camden

Arden Windows Ltd

Arden Windows are proud to be involved in the £4.5 million refurbishment of Grade II listed building Levita House. Working with Mitre Construction and London Borough of Camden. Arden Windows will be commencing the first phase of window replacement works commencing October 2020 on a supply and installation basis. A further 2 phases are contracted and will follow in early 2021. The windows designed by Arden are bespoke solutions for both casement and sliding sash designed by Arden to meet both modern specification requirements and the design aesthetics needed for such an important listed project such as Levita House
Sponsored
Cast iron air bricks and mesh - a solution at last

Cast iron air bricks and mesh - a solution at last

Cast Iron Air Brick Company

Flymesh and cast iron air bricks, up till now, Installers have either pushed the mesh into the back of the air brick from inside - never to be cleaned again - or meshed over the air brick and held it in place with silicon - never to be removed again. Which is why we invented the cast iron flyscreen airbrick with removable copper mesh. It solved a problem faced by Galliford Try, constructing the athletes village for London 2012 Olympics when they needed feature vents for kitchen extraction to enhance their clay bricked homes. Discover how they work...
Sponsored
Orbis OS211 and OS200 Balustrades Create Impactful Stair at Pencoedtre High School

Orbis OS211 and OS200 Balustrades Create Impactful Stair at Pencoedtre High School

Delta Balustrades Ltd

As experts in supplying balustrades to the Education sector, Delta’s powder coated Orbis balustrades with glass infill created an impactful and eye-catching feature stair and communal space for pupils.Delta also installed powder coated Orbis balustrades with vertical bar infills on the stairs.The construction of Pencoedtre High School by Bouygues UK was part of the £34m investment by the Vale of Glamorgan Council and Welsh Government.The three-storey building with state-of-the-art facilities was built to accommodate 1250 pupils and as part of the 21st Century Schools programme to transform educational facilities.
Sponsored
Henlow Academy Sports Hall

Henlow Academy Sports Hall

DYNAMIK Sports Flooring

DYNAMIK work with architects at specification stage right through to completion. Henlow Academy, in Bedfordshire was led by PCMS Design to build a new four-court sports hall. Main contractor, Borras Construction, chose DYNAMIK to install the specialist low profile sprung sports floor finished in a solid sport linoleum. The client wanted a Sports Hall for multi-sport use including netball, badminton, basketball, hockey and five-a-side football and to hire the facility for public use. Solid sport linoleum, available in a range of colours, was chosen for this purpose as it is easy to clean and maintain.
Sponsored
GATEWAY 12 BUSINESS PARK, QUEDGELEY

GATEWAY 12 BUSINESS PARK, QUEDGELEY

Tata Steel

Gateway 12 is multi-million pound industrial development on a c.16-acre site located three miles to the South West of Gloucester, adjacent to the A38 dual carriageway and just one mile form Junction 12 of the M5.For the main structure of the buildings Trisobuild® R32 was used for the roof and Trisobuild® C32 was installed vertically on the walls; Trisobuild® HR50 was used horizontally at the higher level for the soffits in Merlin Grey. The offices area wall elevations were constructed using Trimapanel® insulated panel system.
Sponsored
Clement replace steel windows at landmark Grade II listed Old Marylebone Town Hall

Clement replace steel windows at landmark Grade II listed Old Marylebone Town Hall

Clement Windows Group

Clement Windows Group have replaced the original steel fenestration at the Old Marylebone Town Hall, recently leased by the London Business School from Westminster Council on a 35 year renewable contract. In order to increase teaching facilities by 70 percent, the building has undergone a major £60m refurbishment and Wates Construction were chosen as the Main Contractors to undertake the challenge of joining the two iconic buildings in an eclectic mix of the traditional and contemporary. The new building, designed by architects Sheppard Robson, is named the Sammy Ofer Centre in honour of the late Sammy Ofer KBE.
Sponsored
Slim EB24 steel windows light up this glorious Guildford proerty!

Slim EB24 steel windows light up this glorious Guildford proerty!

Clement Windows Group

Occupying an elevated position above the city of Guildford stands this wonderful house, which was built in the early 1900s. Individually designed and constructed to a very high specification, the numerous windows and doors (over three floors) allowed plenty of light to flood into the property and to take advantage of the fantastic surrounding views. Windows from Clement’s EB24 system with rectangular leaded lights were used to replicate the original fenestration. As well as the new windows being in keeping with the character of the property, the multi point locking system chosen by the client brought extra security.
Sponsored
A Window On Successful Collaboration.

A Window On Successful Collaboration.

Eurocell plc

Eurocell’s market leading PVC-U window profiles, technical expertise, and commitment to a sustainable future, is helping to underpin the success of a major ongoing property maintenance and refurbishment project in Birmingham. As a result of the work undertaken in tandem with project lead, construction company, Wates, and fabrication partner, Shelforce, many of Birmingham’s social housing tenants are now benefiting from improved property insulation, lower energy bills, and aesthetically pleasing building exteriors, thanks to the specification and installation of new attractive windows with a minimum design life expectancy of 35 years.  
Sponsored
City Quays II

City Quays II

Kingspan Data & Flooring

Belfast Harbour’s estate spans over 8,000,000 sq. m. The award-winning 'City Quays II' development was completed in 18 months with a construction value of €31 million.Kingspan RMG Simploc was installed on the ground floor Management Suite, with RMG and RMG Simploc fitted on floors three through to seven. RMG performs to PSA medium grade, featuring galvanised steel-encapsulated panels that come with a 25-year total system warranty. The system has also been designed so that the flooring can be easily removed or replaced.
Sponsored
Northampton School for Boys

Northampton School for Boys

A Proctor Group Ltd

The Wraptite external air barrier system from the A. Proctor Group has been chosen for its airtight benefits for a Department for Education (DfE) funded project of the offsite construction of Northampton School for Boys Multi-Academy Trust.The new project forms part of a full turnkey solution provided by Algeco, acting as Principal Design and Build Contractor alongside Watson Batty Architects. The project includes a total of 210 modules using Seismic technology, plus a hybrid structure for the halls, to create the 1200-place new secondary school, including sixth form.
Sponsored
Hurlford Avenue, Glasgow

Hurlford Avenue, Glasgow

K Systems Insulated Facades

The Hurlford Avenue new build project, situated on the former Garscadden Primary School site, truly harnesses innovation and design. This ‘Modern Methods of Construction’ project, completed in partnership with CCG, showcases technical prowess and constructional excellence.Garscadden Primary School closed back in 2017 but the 1930s school building remained standing. Spotting the potential for something impressive on the site, Glasgow Housing Association proposed a modern replacement – a portfolio of properties.The key requirement was to build modern, energy efficient homes which would provide much-needed affordable housing in the sought-after area of Dumbarton and make a significant difference to the local community.After extensive planning, focusing on matching an appropriate insulation system with a complementary finish, K Systems devised a comprehensive delivery plan using our unrivalled experience and expertise.CCG fabricated the building off-site with timber kits and incorporated elements from our Aricco system, with the final finish being completed on-site. This approach was advantageous for a few reasons, including the speed of construction and a reduction in required labour.Hurlford Avenue is a prime example of our experience with off-site modular builds and our project-specific approach to EWI solutions. We brought Glasgow Housing Association’s vision to life and delivered 28 houses and 42 flats for mid-market rent.Our ServiceThe build of the Hurlford Avenue development wasn’t without its challenges. Precision planning was required to ensure minimal disruption to the residents in surrounding estates. All traffic ways remained free for passage and noise pollution was kept to a minimum.During the build, our team encountered some detailing challenges. However, working directly with the contractor and main contractor, these challenges were quickly resolved by key colleagues within our Technical Team, and the build remained on schedule and of the highest quality.From specification and design to planning, delivery and evaluating, our team transformed a derelict site to a contemporary multi-dwelling development that rejuvenated the Dumbarton area.“I would like to thank everyone on the K Systems technical support team for their contribution in accomplishing the Aricco System project at Hurlford Avenue. The regular visits from senior technicians always go a long way to keeping any project in check and it makes the job of our management much easier by having honest, professional judgement to go back to our guys, with well earned praise on this occasion. Everyone was onboard from the outset in working around any potential difficulties and you will agree it shows in the final results.”Garry Barton, Contractor.Technical Project DetailsAs the client of this project, Scotland based construction company CCG, approached K Systems to provide a suitable façade solution that would complement their design. A build with timber kits and a drained ventilated cavity system was specified, along with a silkolitt thin coat render finish.CCG are renowned for off-site manufacturing (OSM) and manufactured the kits from their production site in near-by Cambuslang. They sourced the correct material according to our exact specification. CCG’s ‘iQ’ System was chosen, which is designed with a fabric-first approach where greater tolerances are determined by fewer junctions and thermal bridges to deliver enhanced U-values and significantly improve airtightness. By incorporating OSM and the iQ system into this project, it is just a small insight into our unrivalled knowledge and expert approach that we take to fulfil the requirements of our clients.For the supporting façade, the K Systems Aricco system was specified - a drained ventilated cavity system perfectly suited for use in low rise buildings, particularly new build projects and timber framed construction. The Aricco system is also the most compatible with offsite/modular construction techniques and boasts an A2-s1, d0 fire rating and therefore complies with the latest building regulations, ensuring the safety of all residents.The finish was just as important as the façade system, with the cost-effective, industry-leading Silkolitt thin coat render specified. Silkolitt renders provide a contemporary finish to new-build applications, something this project very much required to modernise the area. Silkolitt is simple to apply, and its hydrophobic properties makes the render low maintenance. It also has excellent vapour permeability, allowing the Hurlford Avenue properties to breathe and avoid interstitial condensation. It is the most flexible system on the market, making cracking over its lifetime less likely and therefore delivering a pleasing aesthetic with outstanding longevity.The combinations specified by the K Systems team resulted in the build of impressive dwellings boasting a U-value of 0.13W/m ² K – meaning homes were easier and cheaper to heat, a particularly attractive benefit given the current cost of living crisis.

Showing 1369-1383 of 1383

Feedback