NBS Source
I'm a manufacturer

"construction plant equipment"

7,995 results found

Sort by:

Showing 1-36 of 1381

Sponsored
Hanson Brick Plant

Hanson Brick Plant

Eternit

Profile 6 was specified on the 'super' brick plant because it is a high strength fibre cement sheet that is unaffected by the humid and aggressive environments found in this type of plant.
Sponsored
Nitric Acid Plant

Nitric Acid Plant

Eternit

Installation of Eternit Profile 6 painted sheeting and ventilation systems was carried out in Gunmetal Grey on the top half of the nitric acid plant and Blue on the bottom half by FP Services UK Ltd and in Blue on the centrifuge building by Cape Industrial Services.
Sponsored
Fume extraction equipment

Fume extraction equipment

BROEN-LAB

Keep your lab safe and the air clean with quality fume extraction equipment Remove hazardous or just unpleasant vapours, gasses and dusts from the work environment with effective extraction arms. BROEN-LAB offers a full range of high quality products for the modern laboratory. Anodized aluminum with polypropylene (PP) joints Chemical resistant polypropylene (PP) Conductive, shatterproof, chemical resistant polypropylene (PP)
Sponsored
Guide to LOLER: Lifting Operations and Lifting Equipment Regulations

Guide to LOLER: Lifting Operations and Lifting Equipment Regulations

Penny Hydraulics Ltd

LOLER is an acronym, used to abbreviate Lifting Operations and Lifting Equipment Regulations. LOLER regulations cover the operation and control of lifting equipment, placing responsibility on both the company in ownership of and the employee operating lifting equipment. Lifting equipment, classed as work equipment, is also subject to PUWER, an abbreviation of Provision and Use of Work Equipment Regulations.
Sponsored
Basement waterproofing at Ardley Energy from Waste Plant

Basement waterproofing at Ardley Energy from Waste Plant

Fosroc International Limited

The new Ardley EfW Plant, including a 12m basement built over an Artesian Well, presented a host of construction challenges. Due to the extreme water pressure created by the Artesian Well, as well as ammonium salts in the ground, Fosroc worked closely with Tata Projects specifying a solution using Proofex Engage to provide a watertight, chemically resistant barrier, with Supercast SW20 in the construction joints to reinforce the floor to wall joint. Fosroc provided a ‘total solution’ package to ensure Tata Projects could feel confident with the proposed specification, from basement waterproofing, to grouting crane bases, flooring and sealants.
Sponsored
Restoration of the foundations at a wind energy plant

Restoration of the foundations at a wind energy plant

Koster Aquatecnic Ltd

Concrete foundations of a wind energy plant: Due to the influences of the weather over the years, the following damages were noticed: •Cracks due to movement •Moisture into the structure •Spalling of the concrete •Corrosion of the reinforcement •Flaking paint The first step in the restoration of the foundation was pressure injecting the cracks - through which an elastic closure of the cracks was realized. The total surface was strengthened with a unique sillicate liquid. A waterproof sloped layer was installed; finally, the moving joint between the foundations and the steel tower of the wind energy plant was sealed elastically.
Sponsored
Specialist equipment installed for private home

Specialist equipment installed for private home

CareSpaces by Wealden Rehab

Care Spaces played a crucial role in enhancing the living conditions of a private client, referred to as Mr B, who had experienced a spinal injury leading to a loss of physical independence. Collaborating with an architect to design a bespoke extension, we focused on the bedroom and bathroom to cater to his specific needs. The centrepiece of the design was an XY ceiling track hoist with a magnetic transition gate system, facilitating safe transfers between the bedroom and bathroom. Care Spaces also recommended bathroom equipment tailored to Mr B's needs, including a washer/dryer toilet, a static-height hand basin, and an Avero care bath with an air spa system for therapeutic benefits. With Mr B's approval, we oversaw the installation of the hoist system and bathroom equipment, provided necessary training, and ensure routine servicing for optimal functionality. Mr B is now delighted with his improved living space, and Care Spaces remains committed to maintaining the excellence of his care equipment.
Sponsored
Bobrick Washroom Equipment, Inc.

Bobrick Washroom Equipment, Inc.

Bobrick Washroom Equipment Ltd

In conceptualizing Bobrick’s new headquarters in North Hollywood, CA, the design team at Gensler Architects (Los Angeles) set out to create a work environment that celebrated Bobrick’s egalitarian culture and innovative work processes, while facilitating connection and collaboration throughout.
Sponsored
Living space as a power plant: Solar house

Living space as a power plant: Solar house

Hawa Sliding Solutions AG

The «Plus-Energie-Haus» constructed by the Technische Universität Darmstadt is a Solar Decathlon winner. The competition has been held each year since 2002 by the US Ministry for Energy. The task is to design and build a residential house to suit life that is self-sufficient with regard to energy. The houses must cover their entire energy requirements through self-produced solar power. Between two layers is a protected external area with sliding windows and folding slat shutters that can be opened and closed as needed. The folding sliding shutters are equipped with HAWA Variofold 80 H.
Sponsored
Plant Trellis – Green Park Station

Plant Trellis – Green Park Station

Lang+Fulton

Green Park Station provides access to the Jubilee, Piccadilly and Victoria Lines. The £60 million refurbishment to achieve step-free access included a copper canopy, a Portland stone entrance and a ramp from the ticket hall into the Park featuring green wall screening. Lang+Fulton designed and supplied 300sqm of panels to clad the raked inner facade of both retaining walls and the tapered wall-heads, which would support the green wall planting. The panels were made to custom sizes from Terra-34 grating and fixed with varying lengths of bracket to accommodate the stepped areas in the walls.
Sponsored
VDG Warehouse Schiphol II opts for nature-inclusive building with MobiPanel green facades

VDG Warehouse Schiphol II opts for nature-inclusive building with MobiPanel green facades

Mobilane

VDG Property Development has recently joined forces with their own construction company Unibouw to develop the new VDG Warehouse Schiphol II. The new building is equipped with a total of 636.5 square meters of vertical greenery divided into two green walls with the MobiPanel system.In addition to the sustainability requirements, BREEAM-NL certification ‘Excellent’, this also enables the building to meet the high-quality requirements in the areas of nature inclusiveness, biodiversity, ecology and living environment. The green appearance of the buildings is the ‘new normal’ at the business park. Schiphol Trade Park aims to be the most sustainable and innovative business park in Europe.‘The area developer and the ambitions of the Schiphol Trade Park area set high requirements in the area of nature inclusiveness. For example, 95% of the end walls of the building had to be green upon completion. The green facades give the building a fantastic appearance. Nature inclusiveness is becoming increasingly important in project development and this is also the future. It will make the Netherlands look all the better,’ says Richard van Campen – project manager at Unibouw B.V.Nature-inclusive buildingFor the development of VDG Warehouse Schiphol II, design choices were made that enhance the ecological value for the surrounding area. For example, the warehouse not only facilitates an efficient logistic process but also creates space for more greenery and biodiversity.Diversity in plant speciesFor each façade, the climatic conditions have been examined and the choice of plants has been adjusted accordingly. The green façade oriented to the North-West contains the plant species; Campanula Stella, Alchemilla Molis, Vinca Minor, Lonicera Maigrun, Geranium Rozanne, Carex Oshimensis ‘Evergreen’, and Bergenia Bressingham White. In the green façade oriented to the southeast are the plant species; Alchemilla mollis, Dryopteris Erythrosora, Bergnia Bressingham White, Lonicera Maigrun, Riarella cordifolia, Carex Oshimensis ‘Evergreen’, Asplenium scolopendrium and Geranium Spessart. In total, there are approximately 23,400 plants in both green walls.VDG Warehouse Schiphol IIVDG Warehouse Schiphol II comprises 9,636 m2 of modern logistics space and consists of two units. With green facades and panels on both sides, VDG Warehouse Schiphol II presents itself as an extremely sustainable distribution centre. With its ecological elements, the development is not only connected to the surrounding nature, but also to the adjacent distribution centre where a MobiPanel green facade has also been installed.Client: UnibouwArchitect: VDG Real EstateConstruction period: 2022Installation: Mobicare
Sponsored
Automotive - Nissan Car Plant - Speedor Cleanroom

Automotive - Nissan Car Plant - Speedor Cleanroom

Hart Door Systems Ltd

Nissan Sunderland is one of the largest, most efficient car plants in Europe. On average, the plant has built a Nissan car every two minutes since production started.Project/doors:10 Speedor Cleanrooms (Over 200 doors supplied to the plant)The challengeFollowing the manufacture of a new paint plant where Hart have a number of doors including several ATEX, Nissan identified a requirement for new repair lines to enable them to carry out both light and heavy repairs and not have to completely repaint the vehicles. This is fast moving environment with the need for a reliable and dust reducing solution.The solutionUsing a tried and tested solution, Hart installed these “hybrid” Speedor Cleanrooms with ATEX operators within the repair zone. We worked closely with site engineers to give them the solution they require, rather than a door to fit an opening. The Speedor Cleanroom maintains strict air leakage requirements over specified pressure differentials and a non-touch safety light curtain which ensures maximum protection to personnel. The successHart is a trusted supplier to Nissan and its subcontractors. Having worked on the site since it’s inception, Nissan approached Hart to supply the doors. Following this Hart were approached by an OEM who provided a full spray booth, after Nissan insisted Hart Doors were specified due to the success of the earlier installations.The review“Speedor is a tried and tested product that is why we keep using them.” Nissan Motor Manufacturing UK Ltd
Sponsored
Chase Farm Hospital

Chase Farm Hospital

Danosa UK Ltd

Some of our most important public sector assets are held within the healthcare system so choosing the correct specification is critical. Often these buildings host patients or the latest medical equipment, and this centrally funded NHS project at Chase Farm Hospital was no different. This particular project hosted an array of plant and equipment for the NHS and our lightweight DANOPOL HS 1.5mm mechanically fastened membrane was chosen as the waterproofing system to be installed onto the structural metal deck. The scheme also featured a tapered insulation scheme in partnership with Kingspan Insulation designed to 1:60 falls and 0.30 w/m2 K u-value. When installed to structural metal decks, all the mechanically fastened components are mechanically fastened to the crowns only, so careful consideration must be made to ensure that any mechanical fasteners coincide appropriately. A project-specific wind uplift calculation was completed by our technical team which provided detailed instructions and fastening patterns for the mechanical attachment of both the waterproofing membrane and tapered insulation scheme. In addition to ensuring that the system will resist any applicable windload, our calculations can reduce overall frequency of fasteners, ensuring that the project is not over-engineered and ensure that the installation progresses as quickly as possible.Waterproofing Systems:DANOPOL HS 1.5mm - Light GreyConstruction Type:New BuildWarm RoofSector: Public Sector Approx. Size:2,200m2 Warranty Period: 20 Years
Sponsored
Durable, high strength, low permeability concrete for green energy plant

Durable, high strength, low permeability concrete for green energy plant

Tarmac

The Margam Green Energy Plant is a long-term, multi-million pound investment into the Welsh economy to help meet the country’s renewable energy targets whilst also strengthening the country’s energy security. A durable concrete was required for the storage silo that housed wood chip to feed the plant.For this project Tarmac suggested their TOPROC SY be used as an overlay on the finished concrete slab as a protective high strength screed. TOPROC SY comprises a micro-silica mix with steel and macro fibres designed to give high levels of abrasive and impact resistance. This product is highly suited to heavy industrial areas such as container handling, metal recycling, waste, loading bays and any other aggressive environments. The main benefit is extended length of time the product will perform compared with traditional concrete therefore saving cost on continual replacement.
Sponsored
VINCI Construction UK, Widnes

VINCI Construction UK, Widnes

Vebro Polymers

A global construction, energy and infrastructure organisation required a durable, chemical resistant floor coating solution with an anti-slip profile that would withstand the daily wear and tear of its internal vehicle repair and maintenance facility. VINCI Construction is part of VINCI Group, a multinational enterprise with operations in the energy, infrastructure and construction industries. Founded in 1899, the company now has a presence in over 120 countries with a global team of around 220,000 people. The Widnes facility is one of ten VINCI Construction UK locations and houses, among other facilities, a vehicle maintenance workshop where the company ensures their fleet of general and specialist vehicles. The industrial unit that houses the workshop previously had a concrete paving slab floor that proved to be uneven, unsafe, and difficult to maintain.  Not only did the new flooring solution need to address these concerns, it also needed to be both slip and chemical resistant as well as feature clearly marked automotive bays and provide enough durability to withstand frequent wheeled traffic as well as the impact of dropped tools and the weight of heavy equipment. Installed in a combination of RAL 7037 Dusty Grey and RAL 6024 Traffic Green, vebrores EP HBC was installed across the 332 m2 vehicle workshop, with the Traffic Green used to mark out the facility’s six automotive bays, before being outlined using vebrodeck PU Linemarker in Yellow. Prior to the installation of vebrores EP HBC SR – a system comprising an initial layer of vebro EP Primer followed two coats of vebro EP Universal with a broadcast of 52 mesh silica sand after the first coat for an anti-slip profile – the pre-existing concrete paving slabs were first coated with an epoxy DPM and a 20.0 mm screed to level the surface. vebrores EP HBC SR is a pigmented, solvent-free, slip-resistant high build epoxy floor coating system that is best suited to floors in medium duty processing areas where a textured, hard-wearing, chemical resistant finish is required. Available in a wide range of BS 4008 or RAL matched shades, the system is ideally suited to areas where there is a need for navigational demarcation and zoning. 
Sponsored
APL Case Study -  StrongBak™ - Ball Corporation – New Bottling Plant

APL Case Study - StrongBak™ - Ball Corporation – New Bottling Plant

Architectural Profiles Ltd

Project: Ball Corporation – New Bottling Plant Year: 2020 Project Architect: CastleOwen Assembly:Roof – APL 65ZS aluminium standing seam twin-skin built-up system Walls – APL StrongBak™ with external vertical APL profiled cladding Size: • Approx 10,000 m² of roof & wall systems over 2 phases Special Features: • Building 14m high with limited site space • FM (Factory Mutual) approved non-combustible construction • 60/240 fire rating required plus special acoustic requirements Building Location: • Wakefield, Yorkshire
Sponsored
Premier Loft Ladders provide a safe, convenient and discrete solution for access to a premium car dealership plant room

Premier Loft Ladders provide a safe, convenient and discrete solution for access to a premium car dealership plant room

Premier Loft Ladders Ltd

Premier Loft Ladders has helped Horizon Construction provide a safe and convenient access solution to a 1st floor plant room within a premium car showroom. What made this project particularly challenging was the 1.8m deep ceiling void. In addition, the access point was also in a prominent location outside the showroom offices. The solution was a bespoke Supreme heavy duty loft ladder. It offered a safe, discrete and easy-to-use solution for access to the car dealership plant room.Read the full case study...
Sponsored
Compounds, screening and perimeter security at Jaguar Land Rover' new plant

Compounds, screening and perimeter security at Jaguar Land Rover' new plant

Lang+Fulton

Jaguar Land Rover’s new £500 million engine manufacturing facility at the i54 business park is situated close to the M54 motorway outside Wolverhampton.The new plant, which is the size of 14 football pitches, is JLR’s largest investment for in-house engine design and manufacturing in a generation. As it was impractical to install a perimeter fence to provide adequate screening from the motorway, Lang+Fulton supplied 5 separate compounds with double and single leaf gates made from 400 linear metres of Italia-100 louvres:Waste Compound (2.4m high)Chiller Plant Compound (4m high)Data Centre Compound (3m high)Filter Mist Compound (4m high)Smoking Shelter (2m high)Finish: hot-dip galvanized & ppc RAL7016
Sponsored
92 Construction

92 Construction

Aeromix Flowing Insulation

PROJECT NAME: NORTHENDEN CUSTOMER 92 CONSTRUCTION LTD PRODUCT SUPPLIED AEROMIX SUPPLIED BY WOTMIX MANCHESTER INSTALLER CONCEPT CONSTRUCTION RIBBLE VALLEY LTD AEROMIX was chosen for this renovation project thanks to its many benefits allowing all UFH to be more cost effective and energy efficient, smoothness of finish and speed of install. Significant savings were had on this project by using AEROMIX. The customer 92 Construction Ltd complimented better U-values, a much cleaner process, no excess waste and allowed the project to complete the whole process within 1 week thus saving time and money 92 CONSTRUCTION LTD said “great progress recently over at Northenden project, with the internal sub flooring now complete, we up’d our game with this one and went for the new innovative AEROMIX liquid insulation base ground bearing slab 
Sponsored
FIREFLY Phoenix Picked To Protect Pharma Giant’s New Macclesfield Plant

FIREFLY Phoenix Picked To Protect Pharma Giant’s New Macclesfield Plant

FIREFLY™ TBA

A Manchester based passive fire protection specialist has utilised products from the range of FIREFLY – including the versatile Phoenix Smoke & Flame barriers – to achieve the compartmentation of concealed spaces within the new Macclesfield manufacturing facility of a world-leading pharmaceutical giant.Firetech UK Ltd. is a key sub-contractor to DES for the construction of the extensive new laboratories and production plant for AstraZeneca, part of the FTSE 100 company’s continuing investment at its East Cheshire site for the distribution of drugs to markets around the world. Firetech was established more than 25 years ago and makes extensive use of FIREFLY  flexible fire barriers for its work on both commercial and domestic contracts. In the case of the Macclesfield project, Firetech purchased the FIREFLY  products via national distributor, Encon.  The Contracts Manager for Firetech UK on the Macclesfield Project, Josh Dodds comments: “We work nationwide though predominantly in the North-West of the country and have been using FIREFLY  products for the past five years, including here on this very large new plant.  Early on in the contract we installed a large quantity of Titan Lite™ 120:60 fire barriers in the ‘Amenities Area’ of the building and then when we were tasked with installing a series of smoke and flame barriers in the ceiling voids over the laboratories, we proposed the Phoenix product as being the most cost-effective solution. The work consumed approximately 540 square metres of the Phoenix to create a series of vertical barriers valued at some £50K.  Although we were able to employ standard details for the installation of the Phoenix barriers  and the Collaroll which wraps some of the beams and other features, FIREFLY has been involved from the earliest stages, providing general guidance and carrying out inspections.  The project has gone very well.”FIREFLY Phoenix is a lightweight smoke and flame barrier which facilitates compartmentation within buildings to provide up to 120 minutes’ integrity under BS476 Parts 20 & 22.  Certified by IFCC, the flexible and straightforward to install material is suitable for both new-build and retrofit situations.  Manufactured from woven and non-woven glass, the FIREFLY range is designed to optimise resistance to flame and smoke as well as offer heat protection in a wide range of scenarios. The flexible barriers are easy to install horizontally or vertically using a full selection of ancillary products.  Used mainly in the construction industry across the UK and Europe, FIREFLY fire barriers help to contain fire, giving building occupants extra time to evacuate and the fire service to enter safely.Images shown are taken during installation and some sections of the installation might be incomplete.
Sponsored
LivePicture living plants artistry brings fresh air and well-being to Bristol office

LivePicture living plants artistry brings fresh air and well-being to Bristol office

Mobilane

A contemporary office environment demands a number of important considerations; functionality, aesthetics, space, accessibility and wellbeing.  Ticking all of these boxes are the multiple LivePicture installations at the headquarters of Ultraleap, a technology company in Bristol. A framed piece of artwork with living plants, LivePicture has brought foliage, freshness and visual impact to the offices, thanks to installers Inleaf.
Sponsored
Events Hire: The Goods Lift Guide to Lifting and Handling Equipment

Events Hire: The Goods Lift Guide to Lifting and Handling Equipment

Penny Hydraulics Ltd

The events industry is worth around £11bn to the UK economy*. With just over half a million employees, success in the industry relies almost entirely on the shoulders of its people. Effects of the pandemic are still being felt in a sector undergoing dramatic transformation. The events industry now faces a choice of embrace change or face decline.A large part of the industry’s response is a shift in culture, realising and accepting that the events industry is nothing without people. Never before has it been more important to protect and nurture employees. In this guide to lifting and handling equipment, we focus on how events hire companies can provide a safe working environment for employees.
Sponsored
Kier Construction HQ

Kier Construction HQ

ROCKWOOL Ltd

Kier Group is a leading property, residential, construction and services group, which invests in, builds, maintains and renews buildings operating across many sectors, including housing, defence, education, power, transport and utilities.Kier handled both the design and delivery process and worked directly with Cottenham-based roofing contractor, Voland Roofing, on this project.Kier wanted the roof to not only insulate against airborne sound, but also to reduce noise from the impact of raindrops on the roof.
Sponsored
FasTop RS69 polyurethane cement used for Bangladesh food production plant

FasTop RS69 polyurethane cement used for Bangladesh food production plant

Sherwin-Williams

  ​​​​​​​The FasTop RS69 polyurethane cement system was used for this ongoing Bangladesh food production plant project to deliver a heavy duty hygienic floor. Sherwin-Williams FasTop Multi RS69 product used in this system delivered a thickness of 6 mm overall and 9 mm in selected areas under machines where the floor would be subjected to boiling water. The initial area totalled 3500 sqm, and then further areas were done as the applicator worked through the factory. The project was the first time Quality Floors Bangladesh Ltd. team had taken advantage of the FasTop technology which featured extreme application conditions, including temperatures of 34-36oC, day and night, and also air humidity up to 100%.
Sponsored
Top Construction Myths

Top Construction Myths

Trade Access Panels

Trade Access Panels are often contacted by customers who have been wrongly informed or have themselves ‘Googled’ certain construction or DIY problems and received totally incorrect information and advice.
Sponsored
National Trust Visitor Centre

National Trust Visitor Centre

Carlisle Construction Materials Limited

The National Trust visitor centre at Tarn Hows in the Lake District is set in a protected Site of Special Scientific Interest (SSSI). EPDM was specified for the roof because of its environmentally friendly credentials which have the backing of Greenpeace. Hertalan roofing products were chosen because of ISO9001/14001 and BBA certification. The membranes were a combination of factory vulcanised sheets and easy weld rolls which were installed in accordance with strict FLL/GRO guidelines. The specification for the green roof insisted on local species of sedum and had over 2000 plug plants installed into 150mm deep recycled growing substrate.
Sponsored
Manchester Construction Site

Manchester Construction Site

CLD Physical Security Systems

Eric Wright Construction are an organisation based in the North West of England, providing high quality construction services to customers for over 40 years.Back in 2017, work started on one of their new residential redevelopment projects in Manchester. Due to services and potential contaminates running directly underneath the construction site, they were in need of a zero ground strike fencing system that still held high security properties.The BriefThe brief was outlined by Eric Wright Construction through their specific requirements on the compound that CLD Fencing Systems and Wallbank Fencing needed to follow. Due to their inability to break ground, a permanent fencing system was not going to work.Zero ground strike fencing due to potential contaminates and servicesCompetitively pricedOperation and installation flexibility
Sponsored
Philips Plaza

Philips Plaza

Bobrick Washroom Equipment Ltd

Facility management is confident that patron health and hygiene needs are being met, thanks to Bobrick products.
Sponsored
Tou-Towers

Tou-Towers

Bobrick Washroom Equipment Ltd

At two almost-identical, state-of-the-art office buildings in Tel Aviv, an array of Bobrick washroom accessories provide hygienic, economical handwashing and drying solutions.
Sponsored
F5 Tower

F5 Tower

Bobrick Washroom Equipment Ltd

In a bustling office tower, our B-635 Klutch Mobile Device Holders satisfy unique demands.
Sponsored
Assima Tower

Assima Tower

Bobrick Washroom Equipment Ltd

At a time when hygiene and budgets are top of mind, the B-824 SureFlo® Automatic Soap Dispenser revealed itself to be the economical hygiene solution the design teams could get behind.
Sponsored
77 Coleman

77 Coleman

Bobrick Washroom Equipment Ltd

Occupants of 77 Coleman benefit from environmentally centred design both inside and outside. In the building’s washrooms, recessed Bobrick accessories deliver low-profile design and minimise consumable use.
Sponsored
Water bottling plant - anti slip floor coating/ line marking paint

Water bottling plant - anti slip floor coating/ line marking paint

Watco UK Ltd

Our client, the world’s second largest producer of bottled water, was looking for industrial floor paints to renovate and maintain indoor walkways and create seamless traffic flows in its factories. And that’s no mean feat as the area to paint was over 2500 m2!"The objective of the refurbishment was to improve the visibility of the walkways in the production area to enhance employees’ safety."As the factory hadn’t been renovated for some years, floor markings were no longer visible and cracks were appearing throughout thus increasing the risk of trips and falls.In a food processing plant, there are strict environmental and safety regulations to comply with. It was therefore important that the paints and coatings used in the refurbishment conform to those regulations, but also have a rapid curing times to minimise downtime.Our client’s organisation relies heavily upon the dynamism of its teams. It was therefore only natural that employees themselves – from the accounting department to the technical teams - rolled up their sleeves and got on with the refurbishment project. The idea was to raise awareness of safety issues in the factory. For us, it meant we needed to supply user-friendly paints and coatings that could be applied easily by staff. Our solutionOur client researched various solutions and suppliers for their refurbishment project. Watco products, which are long lasting and user-friendly, stood out from the competition. Three products were applied: Safety Grip: A heavy duty anti slip, two pack epoxy resin coating designed for dangerous areas. Epoxyline: A heavy duty, fast drying, line marking paint. Epoxy Gloss Coat: An extremely tough floor coating that is virtually solvent free, and therefore ideal for a food processing plant.
Sponsored
One Bank Street

One Bank Street

Bobrick Washroom Equipment Ltd

At One Bank Street, on London’s Canary Wharf, partnering architecture firms Kohn Pedersen Fox (KPF) and Adamson Associates Architects turned to Bobrick: a total of 127 B-320501 TrimLineSeries™ recessed 3-in-1 combination units with concealed locks.
Sponsored
42 Berners Street

42 Berners Street

Bobrick Washroom Equipment Ltd

At 42 Berners Street, a new contemporary office building in the heart of London’s Fitzrovia district, Bobrick’s QuietDry Series and Recessed Hand Dryers provide stylish, hygienic, sustainable hand-drying solutions in all its washrooms.
Sponsored
Tocumen International Airport

Tocumen International Airport

Bobrick Washroom Equipment Ltd

As Panama’s largest airport plans to increase its capacity to 18 million by 2022, Bobrick accessories help navigate immediate design needs and future operation.

Showing 1-36 of 1381

Feedback