NBS Source
I'm a manufacturer

Northampton School for Boys

OVERVIEW

The Wraptite external air barrier system from the A. Proctor Group has been chosen for its airtight benefits for a Department for Education (DfE) funded project of the offsite construction of Northampton School for Boys Multi-Academy Trust.

The new project forms part of a full turnkey solution provided by Algeco, acting as Principal Design and Build Contractor alongside Watson Batty Architects. The project includes a total of 210 modules using Seismic technology, plus a hybrid structure for the halls, to create the 1200-place new secondary school, including sixth form.

Products featured in this case study

View all products (10)
Wraptite - Vapour permeable air barrier

Wraptite - Vapour permeable air barrier

More inspiration from A Proctor Group Ltd

View inspiration
Procheck A2 - Meridian One

Procheck A2 - Meridian One

Procheck® 500 - BAS Signy Cummins Hut

Procheck® 500 - BAS Signy Cummins Hut

Procheck Adapt - Montrose

Procheck Adapt - Montrose

Fireshield® chosen for science centre of Kensington & Chelsea school

Fireshield® chosen for science centre of Kensington & Chelsea school

More inspiration from Vapour-permeable sheets

View inspiration
Drumhierny Woodland Holiday Lodges

Drumhierny Woodland Holiday Lodges

The Moorings, Wales

The Moorings, Wales

Whitethorn Village Apartments

Whitethorn Village Apartments

Wood Wharf B2, Canary Wharf

Wood Wharf B2, Canary Wharf