NBS Source
I'm a manufacturer

"concrete blocks"

2,262 results found

Sort by:

Showing 721-752 of 752

Sponsored
Sandtex Trade High Build Textured Decorative Coating – a uniform finish for uneven surfaces

Sandtex Trade High Build Textured Decorative Coating – a uniform finish for uneven surfaces

Sandtex Trade, product of Crown Paints Ltd

The outstanding qualities of Sandtex Trade High Build Textured Decorative Coating deliver a long-term solution for the protection of buildings, capable of ironing out surface level imperfections at a stroke. Ideal for covering fine cracks and regulating repaired and uneven surfaces, this advanced masonry product offers exceptional coverage and flexibility, providing both a decorative and protective textured coating with the reassurance of 15 years’ durability, independently certified by the British Board of Agrément. Along with a long-lasting finish, the paint is formulated to maintain its good looks with anti-carbonation properties which protect concrete and metal from atmospheric erosion.
Sponsored
4 Kingdom Street, London

4 Kingdom Street, London

Washroom Washroom Ltd

Washroom's off-site service allowed the design to be carefully fine-tuned prior to installation on site for this prestigious office refurbishment project. Washroom's full height Alto toilet cubicle doors were specified with a real wood veneer finish, stained to match the solid Douglas fir timber panelling in the reception area. The bespoke polished cast concrete vanity units feature integral waste bins and Tego hinged mirror units above. For the new staff shower and changing room area Washroom's full height Alto FENIX shower cubicles were installed along with Z style Forza SGL lockers.
Sponsored
Swindon Station is back on track with Ultrascape's Mortar Paving System

Swindon Station is back on track with Ultrascape's Mortar Paving System

Instarmac Group plc

Ultrascape's BS 7533 compliant mortar paving system has been used to deliver a modern and stylish forecourt outside Swindon railway station. The redevelopment has transformed what was previously a heavy traffic dominated area, into a prestigious pedestrian focused arrival space which features seating, planting, lighting and a millennium clock. Work was carried out by specialist civil engineering contractor, Britannia Construction and included the installation of 500 tonnes of high quality natural granite and Pennant Sandstone using Ultrascape's Pro-Bed HS fine bedding concrete, Flowpoint rapid setting grout and Pro-Prime slurry primer.
Sponsored
Gatwick Station Platforms 5-7 Upgrades

Gatwick Station Platforms 5-7 Upgrades

Sika Limited

The UK’s second busiest airport, Gatwick Airport, is also home to a rail station which handles in excess of 20 million passengers annually – making it one of the 10 busiest stations in the UK outside of London.Network Rail are currently managing a redevelopment project at Gatwick station, which is being delivered by Costain. Part of this project is a new concourse for the station.The redevelopment of the station includes improvement works to create a larger, more accessible interchange between the station and airport. As part of the upgrades to platforms 5-7, Costain worked with Sika waterproofing products and Hanson for the concrete mix to ensure the rebuild was robust and would offer significant longevity.
Sponsored
The University of Manchester Library

The University of Manchester Library

TK-Team Limited

"You can hear it and feel the difference as soon as you walk in and start to talk"Due to new hybrid working we installed VC kit that better enabled remote calls and meetings for staff. When in-person colleagues around the meeting table would be in conversation with each other, audio would often cut out for those joining remotely, no matter how many speakers and microphones we had in the room. Generally, this was a poor meeting experience for those joining online and we had received feedback about this from our staff. Ceilings in the room are high with concrete beams and so this was probably contributing to the issues. 
Sponsored
GAIA Group Offices, Cape Town

GAIA Group Offices, Cape Town

Folienwerk Wolfen GmbH

Beautiful, spectacular curved glass designs made with evguard®. One of absolutely gorgeous designs accomplished by Inhouse Brand Architects for GAIA Group Offices. It is made up of concrete and exposed brickwork and has got curved walls and timber beams. Curved glass windows and intricate timber-clad ceilings enhanced the beauty of the building. Glass Benders have been manufacturing and supplying quality curved glass since 1998. They make unique glass products for a wide range of applications. More under www.glassbenders.co.za or please contact our distributor: Fraser Global Trading (Pty) Ltd Johannesburg, South Africa Web: www.fgtrading.co.za
Sponsored
The Sainsbury Exhibition Gallery at the World Conservation and Exhibitions Centre (WCEC)

The Sainsbury Exhibition Gallery at the World Conservation and Exhibitions Centre (WCEC)

Howe Green

Architect Rogers Stirk Harbour + Partners specified Howe Green when they required a unique, reliable access solution for the WCEC. Howe Green designed and manufactured a circular access cover in 316-grade stainless steel. The bespoke cover offered a stylish and discreet solution, capable of withstanding 40kn load and meeting the specification for aesthetics and performance. Each box section of the cover had built-in cable access and voice/data plug-in points. Slotted steel lids were made for when services were in use. The access covers also accept coloured polished concrete inserts made to match the surrounding Ed Lazenby floor.
Sponsored
Bow River Village, London

Bow River Village, London

Leviat

This mixed use development on the southern fringes of the Olympic Park utilised the Nexus® system to achieve flawless brick-faced soffits to the hundreds of door and window heads. Nexus is a two-part brick soffit system that combine a high integrity stainless steel brickwork support system with custom-designed prefabricated brick faced soffit units. Being 70% lighter than traditional cast concrete solutions, the Nexus soffit system is simply lifted and bolted into position by hand and, as the brick slip facing is manufactured from the same batch as the main brickwork, presents a perfect colour and texture match for flawless transitions.
Sponsored
Northern Accommodation Hub

Northern Accommodation Hub

Marshalls plc

The new site comprises a 20-cell custody suite and a three-storey office building, which accommodates more than 300 officers and staff and provides both Northamptonshire Police and Northamptonshire Fire and Rescue Service, which shares the office building, with modern, 21st century facilities. Marshalls provided a range of products from the Landscape Protection portfolio for the exterior space, including Geo bollards, Geo seating, a Pluto cycle shelter and bespoke concrete planters. Due to the security required around this sensitive building it was important that the items of furniture specified had the required protection against potential accidental or criminal damage ...
Sponsored
It’s a ‘race to the finish,’ as ARDEX UK complete Commonwealth Games Pool refurbishment in 8 weeks

It’s a ‘race to the finish,’ as ARDEX UK complete Commonwealth Games Pool refurbishment in 8 weeks

Ardex UK Ltd – High Performance Flooring, Tiling, Screeding and Building Products

The 2014 Commonwealth Games’ swimming competition was played out at Tollcross International Swimming Centre. In anticipation of the games, the centre’s facilities underwent a complete refurbishment. Some of the screed below the tiles on the main competition pool floor had separated from the concrete pool tank. The entire floor needed to be re-laid. Glasgow City Council Scott hired, Tilecraft, a specialist tiling works company that delivers high quality tiles, to lay the tiles and specified products from ARDEX UK. A fast track solution which would produce high quality results was needed, and ARDEX UK seemed the logical choice.
Sponsored
Harbour Central, Lighterman’s Road

Harbour Central, Lighterman’s Road

Cellecta Ltd

Harbour Central is a condominium complex in London’s Docklands, costing £17.6 million and comprising 642 private one, two, and three bedroom apartments divided across five residential buildings. This 30,000m² development also provides eight penthouse apartments with a leisure complex, all only minutes from Canary Wharf.Cellecta YELOfon HD10+ was specified by Rolfe Judd Architecture in this development for is unrivalled acoustic performance when used to isolate a floating screed from a structural concrete floor. This product also works in conjunction with underfloor heating.Galliard Homes UKS was awarded the contract to construct these luxury private apartments.
Sponsored
Premium Plus roller blinds and Vertical Blinds in Cornes Residential

Premium Plus roller blinds and Vertical Blinds in Cornes Residential

Bandalux Industrial SA

Cornes buildings are an ambitious residential in Santiago de Compostela, which is next to the first train station of Galicia . This is one of the reasons to promote this space for a new lifestyle . Carbajo Barrios architects use concrete elements for the façade to minimize the impact of sunlight on buildings as well as give a strong architectural character . Bandalux vertical blinds were chosen as a solar control system, creating visual harmony as well as efficient sunlight management . Polyscreen ® fabric perfectly complements the clean style of interior designs, allowing visual contact outside when desired by the owners . Our roller blinds are chosen with blackout fabrics for maximum privacy and intimacy .
Sponsored
Reflections, Bournemouth

Reflections, Bournemouth

Cellecta Ltd

Reflections is a complex of luxury waterside apartments, built in a contemporary style, most living areas look over Bournemouth Bay and Southbourne Overcliff Drive. The complex features four 3 bed and five 2 bed apartments.Cellecta’s YELOfon HD10+ was specified by Harlequin Homes due to the system being lightweight, easy to install, and delivers unrivalled acoustic performance when used to isolate a floating screed from a structural concrete floor. YELOfon HD10+ is an acclaimed resilient layer system that carries 3 proprietary Robust Details: E-FC-5, 17 & 18.Glossbrook was awarded this 400m² contract to construct this development in Bournemouth.
Sponsored
Ebury Square, Belgravia

Ebury Square, Belgravia

Cellecta Ltd

Ebury Square is a development consisting of 71 one to five bedroom private apartments and a penthouse featuring opulent design and impeccable finishes. It has easy access to the Victoria Mainline, underground and Gatwick Express.Cellecta’s YELOfon HD10+ was specified by Squire & Partners due to the system being lightweight, easy to install, and delivers unrivalled acoustic performance when used to isolate a floating screed from a structural concrete floor. YELOfon HD10+ is an acclaimed resilient layer system that carries 3 proprietary Robust Details: E-FC-5, 17 & 18.Berkeley Group was awarded this 10,000m² contract to construct this development in the London borough of Belgravia.
Sponsored
UltraCrete and Telent join forces to tackle failed ironwork

UltraCrete and Telent join forces to tackle failed ironwork

Instarmac Group plc

Leading UK utility contractor, Telent, have used UltraCrete’s superb ironwork installation materials to repair and install a CW1 access cover in Sutton Coldfield.BackgroundAs part of their ongoing commitment to maintaining the UK’s national utility infrastructure, Telent have used UltraCrete’s latest product innovation Mortar Buoy® to repair a chamber and install a CW1 ironwork access cover in the West Midlands.The ChallengeLocated on a busy junction, it was crucial that the repair and installation of the CW1 cover was carried out quickly to minimise disruption to motorists. With a reputation drawing on decades of experience in the design, build, support and management of the UK’s critical infrastructure, it was imperative that Telent used reputable installation materials that had been tried, tested and proven to work in the road network.The SolutionUltraCrete’s independently tested and approved ironwork installation system was specified by BT Openreach to complete the project.The new CW1 cover was installed using the Install Plus method. To begin, Mortar Buoy® was inflated in the existing chamber to prevent debris falling into the cavity and causing potential damage to the network. Once inflated, the team were able to use Mortar Buoy® as internal shuttering and repair the damaged chamber using QC10 F rapid strength flowable concrete.QC10 F, part of UltraCrete’s range of high specification concretes, is rapid setting fibre modified concrete for backfilling around manhole frames and gullies and for surface repairs.To complete the installation, Mortar Buoy® was used as a dam and Envirobed® CD534 Flowable was poured around the edges of a chamber for a permanent installation.Specially formulated for utility reinstatements, Envirobed® CD534 Flowable high performance bedding mortar is BT LN550 and LN320 compliant and offers superior compressive, tensile and flexural strengths in just 3 hours.Mortar Buoy® is a ground-breaking, innovative, inflatable access frame that acts as a dam, allowing for a flowable mortar ironwork installation in seconds – revolutionising traditional methods.Enhance your specification and upgrade your reinstatement with UltraCrete Mortar Buoy®.ResultsThe project took place on a mild winter day in December 2021. The work was completed without delay and with minimal disruption. Using Mortar Buoy® instead of a traditional damming mortar increased the speed of the installation, reduced costs and made the install less labour intensive for the team.On the performance of Mortar Buoy®, John Doherty, Area Supervisor for Telent commented: “Mortar Buoy® makes life much easier versus traditional shuttering for both chamber repair and bedding the ironwork. It is also much faster.”
Sponsored
Third Space Islington Gym

Third Space Islington Gym

Total Vibration Solutions Limited t/a TVS Group

Third Space has opened its sixth and most luxurious health club in London with spacious training areas, state-of-the-art facilities, tranquil yoga studio, 20m adult pool, cycle amphitheatre and special facilities for youngsters.Free Weights AreaTVS Group’s heavy-duty, interlocking SPORTEC® Style Tiles, custom-produced black and grey-flecked finish perfectly completemented the gym’s colour scheme. Installing a layer of SPORTEC® Team Cup-X flooring beneath the tiles provided extra protection for the concrete subfloor and will further reduce noise and vibrations, while TVS proprietary rubber ramped edges created a neat transition with adjacent gym areas.Stetching AreaTo offer comfort and durability for the club’s large stretching area, TVS Group installed its SPORTEC® MotionFlex product, a fine-grained polyurethane puzzle-mat. It is ideal for fitness applications involving floor-based movements and wellness activities. The interconnecting tiles are simple to install and neatly shaped to suit most flooring schemes while their elegant dark grey colour set the calming mood for this part of the gym.Athletics-Based Track AreaTVS Sports Carpet was selected for the track as it offers excellent grip underfoot, especially relevant for speed, agility and quickness drills. The durability of the surface also allows athletes to push or drag a sled, helping to further develop their muscular strength and endurance. The track was supplied in a cool, oceanic navy blue and white colour scheme.Main Gym AreaThe expected high usage of the main gym area meant the flooring had to be sufficiently resilient. To achieve this and to ensure a perfectly level flooring finish across the gym, TVS Group first laid a dense rubber shock pad over the concrete substrate. It was overlaid with a covering from the highly wear resistant SPORTEC® Purcolor range. A light grey finish was chosen to reflect the sophisticated look and feel of the club.The StudioIn the studio, where high intensity training will take place, TVS Group opted for a highly elastic shock-absorbing underlay overlaid with a wear-resistant performance layer called SPORTEC® Color. The combination will protect the concrete substrate below while offering a comfortable and safe surface above for those involved in a diverse range of training activities.Other Fitness AreasIn other areas of the gym TVS Group supplied and installed a variety of high performing acoustic underlays, helping reduce noise and vibrations caused by treadmill running and other high impact activities in the studios.
Sponsored
Riverside Housing, Flat Refurbishment, Middleton

Riverside Housing, Flat Refurbishment, Middleton

Metrotile UK Ltd

Riverside Housing Association has been a social landlord for over 80 years and has won the Social Landlord of the Year award twice in a row. With such experience and expertise behind them, they know a good roofing product when they see one.So when four 6-storey purpose built blocks of flats required rooftop refurbishments, Riverside decided to use Metrotile’s classic Bond profile, in Charcoal. Prior to the refurbishment, the buildings had a competitor’s Lightweight Steel Roofing System that had reached the end of its life. By replacing the profiles with a Metrotile System, Riverside know that the rooftops are guaranteed weatherproof for 40 years, beating our nearest competitor’s guarantee by a significant ten-year margin.
Sponsored
Smart fire prevention system installed in Rochdale town centre apartments

Smart fire prevention system installed in Rochdale town centre apartments

Firechief Global

The Riverside development in Rochdale includes two nine storey apartment blocks comprising a mix of 240 one- and two-bedroom properties for private rent. The Rochdale town centre Riverside regeneration project also includes a 147-bedroom hotel and 43,000 square feet of office space. The Fire regulations which apply to high-rise living accommodation meant that the kitchens in the apartments would require a fire suppression unit complete with sprinklers to be fitted. These units need to be installed and maintained by a specialist engineer and can also cause damage within a property should they be activated due to a fire.  Therefore, the Firechief Kitchen Stove Guard was chosen as an alternative, unobtrusive design-led fire prevention solution. 
Sponsored
New Garden Square, Birmingham

New Garden Square, Birmingham

OBEX Protection Ltd

Location: Edgbaston, BirminghamMain Contractor: Winvic ConstructionNew Garden Square commenced in October 2021 and is scheduled to reach completion in June 2024. The project comprises three towers which reach to 9, 10 and 13 storeys.Public spaces in the New Garden Square neighbourhood include a new one-acre central park, along with a striking arrival pavilion building at the site’s gateway, and new shops, cafes and restaurants throughout the siteOBEX Score’N’Snap Cement Sheathing Board System was specified for this prestigious project, eliminating the need for dust control and drastically reducing the cost and time of installation.State-of-the-art Homes: 398Apartment Blocks: 3Storeys: 9,10 and 13
Sponsored
Seamus Heaney Homeplace, Bellaghy

Seamus Heaney Homeplace, Bellaghy

Tobermore

When W & M Given Architects was assigned the prestigious task of designing a new arts and literary centre in Bellaghy that celebrates the life and literature of the late Nobel laureate Seamus Heaney, the architect was determined to create a striking tribute that would do the memory of Seamus Heaney justice.The external works were just as important as the interior design and having worked with Tobermore on numerous projects over the years, W & M Given was confident that Tobermore would have an appropriate hard landscaping solution that would achieve the desired result. Tobermore did not disappoint and provided the architect with a combination of fabulous Fusion and sparkling Sienna Setts block paving with modern Mayfair Flags to create a striking, contemporary landscape design
Sponsored
Waterproofing Crossrail Deep Underground with Preprufe®

Waterproofing Crossrail Deep Underground with Preprufe®

GCP Applied Technologies

Reaching depths of more than 30 metres beneath the streets of London, Crossrail Stations required unique solutions to ensure water tightness. GCP Applied Technologies, a leading supplier on some of the major stations including Canary Wharf, Whitechapel, Liverpool Street, Moorgate, Farringdon, Tottenham Court Road and Bond Street, reached into an extensive portfolio of high performing and easy to install Preprufe® waterproofing products to solve challenges presented by each station. Composed of durable HDPE, the Preprufe® waterproofing membrane adheres directly to concrete with Advanced Bond Technology™ to form an impermeable seal. Find out more from gcpat.com.
Sponsored
Schneider Electronics Factory - Koster Flooring Systems

Schneider Electronics Factory - Koster Flooring Systems

Koster Aquatecnic Ltd

The range of Koster flooring systems were specified for use on this large warehouse project in Plymouth. The existing concrete slab and coatings were being effected badly from vapour drive and osmotic blistering so following full investigations by the Koster Technical team, the Koster VAP I 2000 was chosen as the primary form of protection thus preventing further vapour drive and outgassing. A fast application and setting material, this meant a short factory down time and a guaranteed solution.Please read the full case study. For more information or if you would like assistance on a similar project, please contact the Koster technical team at technical@kosteruk.com.
Sponsored
Glasgow University Library - F. Ball Products Used to Install First Class Floor

Glasgow University Library - F. Ball Products Used to Install First Class Floor

Ball, F and Co Ltd

A floor preparation system from F. Ball has been used to install 2,700m2 of floorcoverings at Glasgow University Library. First, old linoleum floorcoverings were removed. Over this area, Stopgap F77 waterproof surface membrane was applied due to excessive relative humidity levels. Stopgap 1200 Pro smoothing underlayment was applied on concrete sections of the subfloor. An F. Ball primer was applied to a ramp constructed from plywood before Stopgap 700 smoothing underlayment was used to receive floorcoverings. In the entranceway, Styccobond F46 adhesive was selected to install vinyl sheets, with Styccobond F41 carpet tile tackifier used to install carpet tiles.
Sponsored
Amtico Training Academy - Amtico chooses F. Ball for new training academy installation

Amtico Training Academy - Amtico chooses F. Ball for new training academy installation

Ball, F and Co Ltd

Stopgap 300 HD smoothing underlayment and Stopgap P131 primer have been used to create a ‘textbook perfect’ flooring finish at Amtico’s training academy. Firstly, ceramic tiles were removed from the existing concrete subfloor along with remaining adhesive. Next, Stopgap P131 primer was used to help promote adhesion. Stopgap 300 HD fast-drying, heavy-duty levelling compound was applied to create a smooth, durable base for the new floorcovering. Luxury vinyl tiles were installed using a vinyl adhesive. Finally, entryway matting was installed on one half of the prepared subfloor and carpet tiles were installed on the other half.
Sponsored
Crystal Palace Football Ground Fan Zone

Crystal Palace Football Ground Fan Zone

Buzon UK Ltd

Crystal Palace Football Club play at the legendary Selhurst Park Stadium, based in London. Crystal Palace Football Club has created a brand new 900m² `Fan Zone` which is divided into various settings, including stages, a huge LCD screen, dining areas, shops and a football skills exhibition space. Buzon UK were specified to supply the components to achieve the high live load requirements, which included voids of up to 500mm. The DPH Pedestal system was used, along with the Alfresco Floors Ebema range of high impact concrete pavers. Other areas on pedestals include artificial turf lawns, stages, walkways and ramps.
Sponsored
Cambridge Central Mosque, Mill Road

Cambridge Central Mosque, Mill Road

Cellecta Ltd

Cambridge Central Mosque is Europe's first eco-friendly mosque and the first purpose-built mosque within the city of Cambridge. The mosque is well insulated and naturally ventilated, using efficient heat lights in the roof and solar panels on the top to help generate renewable energy.Cellecta XFLO Micro was specified by Marks Barfield Architects as its underfloor heating insulation boards were used to help create an efficient and environmentally friendly heating system. Cellecta ScreedBoard 20 was also specified for the overlay floorboard. It is suitable for all types of steel, concrete and timber floors.Warmafloor were awarded this 250m² contract to develop this eco-friendly structure.
Sponsored
Olympus House, Swindon

Olympus House, Swindon

Cellecta Ltd

Olympus House is a collection of one and two bedroom apartments, part of the award winning Old Railway Quarter that was a redevelopment on the site of the former Great Western Railway works. This location has multiple amenities on the doorstep such as shopping at the nearby outlet centre, restaurants, and landscaped gardens.Cellecta’s YELOfon HD10+ was specified due to the system being lightweight, easy to install, and delivers unrivalled acoustic performance when used to isolate a floating screed from a structural concrete floor. YELOfon HD10+ is an acclaimed resilient layer system that carries 3 proprietary Robust Details: E-FC-5, 17 & 18.Thomas Homes was awarded this 5,000m² contract for this development in West Swindon.
Sponsored
Victoria Square, Braintree

Victoria Square, Braintree

Cellecta Ltd

Victoria Square is a regeneration scheme that includes 35 new apartment homes, a “Livewell” health hub, pharmacy, Travelodge, bus interchange, café and restaurant overlooking a new public open space, and a twin-level car park. The 70 bed Travelodge will bring visitors and generate new jobs, while the bigger bus interchange will be able to provide services to meet the future needs of Braintree’s growing population.Cellecta’s YELOfon HD10+ was specified by AHR for this development as the system is lightweight, easy to install, and delivers unrivalled acoustic performance when used to isolate a floating screed from a structural concrete floor.Kier Group was awarded this 400m² contract to construct this regeneration scheme.
Sponsored
Berwick Green, Bristol

Berwick Green, Bristol

Cellecta Ltd

Berwick Green is a new planned development of 102, 2 bedroom flats and 156, 2, 3, and 4 bedroom houses seven miles north of the historic city of Bristol in Cribbs Causeway. This community provides the perfect blend of urban and coastal living with a wealth of amenities, including shops, restaurants, and schools.Cellecta’s YELOfon HD10+ was specified by Focus on Design due to its unrivalled acoustic performance in isolating a floating screed from a structural concrete floor. This product is lightweight, making it easy to install. YELOfon HD10+ is also delivered in rolls to ensure it’s easy to handle.Bellway Homes was awarded this 3,500m² contract for this Robust Detail Registered Site in South Gloucestershire.
Sponsored
Auditorium Hall - MG100 4-12 mtr High Top Hung Movable Acoustic Wall

Auditorium Hall - MG100 4-12 mtr High Top Hung Movable Acoustic Wall

ModernGlide Ltd

The ModernGlide MG100 Top Hung Acoustic Wall is ideal for large auditorium spaces and halls where room heights can be up to 12 mtrs high.Movable Walls Key Facts & Specifications:Acoustic reduction from 37dB to 58dBTop-hung with no floor trackFixing to beam on concrete soffitPanel widths of 650mm to 1250mmHeight up to 12000mmInset pass door optionsSemi-electric top and bottom seal optionsStacking via single and double point suspensionFinishes include melamine, laminate, veneer, magnetic wipe boardIntegral glazing options30 minute and 1 hour fire rating options
Sponsored
MG100 Art & Heritage Training Space - Single Point Movable Acoustic Wall

MG100 Art & Heritage Training Space - Single Point Movable Acoustic Wall

ModernGlide Ltd

The ModernGlide MG100 Top Hung Movable Acoustic Wall provides seamless room dividing options and is ideal for dividing your interior space.Movable Walls Key Facts & Specifications:Acoustic reduction from 37dB to 58dBTop-hung with no floor trackFixing to beam or concrete soffitPanel widths of 650mm to 1250mmHeight up to 12000mmFull height or inset pass door optionsSemi-electric top and bottom seal optionsStacking via single and double point suspensionFinishes include melamine, laminate, veneer, magnetic wipe boardIntegral glazing options30 minute and 1 hour fire rating options
Sponsored
Rockfon does digital for DocuSign Dublin HQ

Rockfon does digital for DocuSign Dublin HQ

Rockfon

To help meet the client’s architectural ambitions and acoustic challenges, Rockfon acoustic ceilings were specified. In designing its new HQ DocuSign wanted to break down barriers and find new ways of working to empower employees. Open plenum ceilings, polished concrete floors and warm timber express the space’s raw, contemporary architecture. Crina Toderic – Henry J Lyons, “…a number of meeting rooms had one solid wall with the remaining three being glazed. It was agreed Rockfon® Mono® Acoustic be installed for its high sound absorption. Being completely seamless, the system allowed us to easily integrate with the rest of the interior aesthetic.”

Showing 721-752 of 752

Feedback