NBS Source
I'm a manufacturer

"commerce protective services"

8,209 results found

Sort by:

Showing 181-216 of 1621

Sponsored
Central Station Berlin
Completed Works:
- Metal Ceiling
- FLOOR and more
- NORTEC
- Plasterboard partition systems
- Fire protection doors

Central Station Berlin Completed Works: - Metal Ceiling - FLOOR and more - NORTEC - Plasterboard partition systems - Fire protection doors

Lindner Group

Completed Works:- Metal Ceiling- FLOOR and more- NORTEC- Plasterboard partition systems- Fire protection doors
Sponsored
The leafy solution to safe socialising in Wandsworth High Street: Green Screens

The leafy solution to safe socialising in Wandsworth High Street: Green Screens

Mobilane

Wandsworth Council have been working closely with urban greening specialists Meristem Design to provide the healthiest, most natural solution as the commerce and community returns. Combining safety and social distancing with nature and foliage for cleaner air and a healthier environment, wooden planters with ivy Green Screens in Wandsworth now form a natural avenue along the way.
Sponsored
Versatile Entrance Matting Protects Interior Floor Surface at Popular Amusement Centre

Versatile Entrance Matting Protects Interior Floor Surface at Popular Amusement Centre

Construction Specialties (UK) Ltd

Featuring the UK’s longest indoor real-snow ski slope, Soar at Intu Braehead is Scotland’s largest retail and leisure complex, attracting up to 17 million people every year. Construction Specialties were asked to provide an expansive entrance mat for the centre’s main entrance. The chosen product was CS’ Pediluxe entrance mat with Platinum covered exterior grade carpet inserts. They have stronger bristle than interior grade carpet inserts, assuring dirt and moisture is effectively removed from the soles of shoes. This enormous entrance mat strongly protects interior floor surfaces and maintenance budgets from foot and wheeled traffic.
Sponsored
Protect your building against wind driven rain, a common source of moisture affecting buildings in the UK

Protect your building against wind driven rain, a common source of moisture affecting buildings in the UK

SureCav Ltd

Damage from the build up of moisture results in mould, mildew and condensation on windows and in the loft space. Additionally, where there is a moisture problem in the wall cavity, damage readily occurs to the insulation and wall ties, affecting wall plates, the timber frame itself and installed joinery. Preventing this from occuring is obviously a priority in the minds of all designers and builders interested in quality construction. SureCav Provides the Solution. By building with the SureCav panels instead of a using a block leaf you are providing a barrier to protect from wind driven rain.
Sponsored
New Public Services Hub to open its doors in Ellesmere Port

New Public Services Hub to open its doors in Ellesmere Port

Metal Technology Ltd

'The Portal' is a new £16 million public services hub in Ellesmere Port, delivered by Vinci Construction UK for Cheshire West and Chester Council. The new facility will be home to more than 500 council and public sector staff, a Job Centre Plus and a Citizen’s Advice Bureau.The building has been constructed with many environmentally friendly elements including solar panels, air source heat pump and electric vehicle charging points. The Portal’s envelope is wrapped at the top and bottom with an attractive, copper coloured metal cladding and a newly formed public realm area will surround the exterior, with bench seating and green landscaped sections.Internally, 'The Portal' consists of large open plan working areas with smaller subsection meeting rooms, break out and kitchen spaces which are present on each level and a main central staircase for circulation.Metal Technology Ltd supplied its 10-35Hi+ commercial entrance doors and System 17 capped curtain walling for the large, glazed sections of the build to approved fabricator and installer RED Systems Limited.Due to open its doors in Spring, it’s fantastic to have been involved in this state-of-the-art, commercial project, which is a catalyst for the wider Ellesmere Port Town Centre regeneration master plan.
Sponsored
Protecting a primary school from water damage by providing a leak detection system

Protecting a primary school from water damage by providing a leak detection system

Andel Ltd

After a prestigious school near Birmingham suffered extensive damage when a leak went unchecked, we installed our award-winning leak detection system to prevent future devastationA tiny leak left to escalate at St George’s in Edgbaston ruined thousands of pounds of property and equipment and left the school without a properly functioning IT department. Leaks within buildings are very common and if not monitored can cause extensive damage, disruption and loss. So, once the school was back on its feet, we were delighted to work with their insurer, Hettle Andrews, to make sure the property was protected against future flooding. St George’s School, EdgbastonSt George’s School is a fully co-educational independent day school for children from ages three to 18 in Edgbaston, near Birmingham. Established as a charitable trust, the school opened in September 1999 as Birmingham’s first independent school to offer a complete education for boys and girls from kindergarten through to the sixth form.We worked with their insurance broker, Hettle Andrews, who facilitated the project. Hettle Andrews works primarily with schools, universities, colleges and charities. In the winter of 2021, the boiler in the room above the IT department of the school began to leak. The school was closed for the holiday period so no one went on-site and the leak went undetected. On return to the school in the New Year, staff discovered the leak which by that point had caused extensive damage.  The leak had not only destroyed the ceiling and light fittings but the whole IT department below including computers, carpets, plug points and furniture. The challengeNo warning: this was the first time anything like this had happened. There were no warning systems in place, nor were there any preventative measures. Extensive damage: the full ceiling had to be replaced, along with expensive light fittings, computers and IT equipment.Inconvenience: it resulted in substantial inconvenience and downtime for the department which in turn affected its daily function within the school.Disruption: the IT department had to be relocated elsewhere in the building, along with any remaining functioning equipment. Time-consuming process: while the damages were being claimed on insurance, the room was cleared and de-humidifiers installed to try and remove any remaining moisture.The solution;Andel Floodline®Andel's unique, award-winning water, oil and gas leak detection and monitoring solution. We are one of the global market leaders in leak detection systems and we knew our Floodline® solution would be a perfect fit. It is a true hybrid that can report to a single integrated control panel – unlike some other systems that require different alarm panels for different types of leak detection.Floodline® covers all possible leak detection requirements, from single-zone to multi-zone and distance measuring systems, with the capability to protect the largest of buildings, both old and new. Floodline® systems allow additional zones, sensors and upgrades to be added easily and cost-effectively so it is future-proof. So, we installed Floodline® SVCP – 2-Valve Control and Floodline® 1-Zone Leak Detection System. This means the school is now able to: Easily monitor all the Floodline® leak detection sensors installedEasily monitor the display LEDs which provide clear alarm information and system status for both leak detection and system faultHave peace of mind knowing the solenoid valve control panel will immediately close two solenoid valves in the event of a leak, ensuring the water source is stopped, preventing any damageBe alerted quickly as there is an audible alarm with a mute functionBe alerted when away from the property as output relays connect to a GSM communicator which sends out an SMS.The result;Bespoke solution: we were delighted to be able to come up with a tailored solution for St George’s School. Early warning: the boiler room at St George’s Edgbaston is now equipped with a bespoke leak detection system that will give early warning should there be any escaping water detected.Confidence: the client feels relieved and more confident now that our leak detection systems have been installed. Peace of mind: knowing they will no longer have to worry about leaks especially when there is no one on-site. Futureproofed: the school knows their chances of this occurring again and their building and equipment being unprotected have now drastically dropped. Community: as schools are the hubs of most communities, the last thing we want is for their day to day operations disrupted by escaping water, something which can be detected early and solutions provided easily. We are proud to have been involved in this project alongside Hettle Andrews and hope to work with more of their clients in future to provide proactive solutions.What the customer said;“We are relieved and more confident now that our leak detection systems have been installed. It has given us peace of mind, knowing we no longer have to worry about any leaks going undetected and resulting in catastrophic damage. The chances of this occurring again, meaning our building and equipment is unprotected, have now drastically dropped. We are really happy with the services and products provided by Andel and would happily recommend them.”Patrick Ryan, Maintenance Manager, St George’s School
Sponsored
Portavadie Marina Resort: Steel louvred fencing and compounds to screen service plant and wheelie bins

Portavadie Marina Resort: Steel louvred fencing and compounds to screen service plant and wheelie bins

Lang+Fulton

Lang+Fulton were asked to supply louvred screening to provide shelter and a visual barrier for the café and outdoor pool areas at the Portavadie Marina Resort. A 2.5m high screen of Italia-100 panels was installed to provide 100% visual screening. The louvres have a free area of 29%, which helps to reduce wind loading, but, in order to cope with potential storm force conditions, the RHS posts were specially designed in accordance with BS EN 1991-1-4. A store area for bins and a secure compound for service plant fored an additional part of the contract. The steel louvres were polyester powder coated in a muted grey (RAL 7015) to a marine grade standard of finish to blend with the surroundings and withstand the harsh coastal climate.
Sponsored
West End Gate, London

West End Gate, London

OBEX Protection Ltd

Location: LondonMain Contractor: Berkeley Homes LtdWest End Gate is a mixed-use development by Berkeley Homes Ltd on Edgware Road in London W2, near the prestigious neighbourhoods of Marylebone and Little Venice.The development comprises 844 apartments (including 175 affordable), 8 shops and a restaurant, along with a new public plaza and improvements to Edgeware Road Junction.The full OBEX CORTEX Class A Through-Wall System has been specified on this project, including fire-classified Breather Membrane, Vapour Control Layer, Interface Sealing Membrane system, and the Score'N'Snap Cement Board system.With each OBEX product carrying a Class A fire-classification, it puts this façade installation by OCL Facades Ltd at the pinnacle of full compliance and highest performance.Residential Apartments: 844Buildings: 8Storeys: 29
Sponsored
Paintworks Bristol

Paintworks Bristol

Marshalls Landscape Protection & Street Furniture

Bristol Paintworks is a hugely successful brownfield renovation project, transforming a decaying, disused industrial site into a thriving place to live and work.The scheme’s concept was founded on nature, with a desire to create a subtle Mediterranean look and feel using appropriate planting, landscaping and paving. Marshalls Modal Paving and Natural Elements benches were chosen to help complete the vision.
Sponsored
The Perfume Factory, North London

The Perfume Factory, North London

OBEX Protection Ltd

Location: LondonMain Contractor: Telford HomesThe Perfume Factory is a new mixed-use development in North Acton, London. The development will deliver 374 new homes and 1,403 sqm of commercial floor space across three residential towers comprising 12, 16 and 25 storeys, as well as public realm improvement.This development is over 18m tall, so required the OBEX CORTEX 0500FR Class B Membrane to comply with the regulations. This membrane is tested to EN13984, so also meets the required water-penetration performance standard.Towers: 3New Homes: 374Commercial Floor Space: 1403 sqm
Sponsored
New Garden Square, Birmingham

New Garden Square, Birmingham

OBEX Protection Ltd

Location: Edgbaston, BirminghamMain Contractor: Winvic ConstructionNew Garden Square commenced in October 2021 and is scheduled to reach completion in June 2024. The project comprises three towers which reach to 9, 10 and 13 storeys.Public spaces in the New Garden Square neighbourhood include a new one-acre central park, along with a striking arrival pavilion building at the site’s gateway, and new shops, cafes and restaurants throughout the siteOBEX Score’N’Snap Cement Sheathing Board System was specified for this prestigious project, eliminating the need for dust control and drastically reducing the cost and time of installation.State-of-the-art Homes: 398Apartment Blocks: 3Storeys: 9,10 and 13
Sponsored
Sainsbury’s Store, Cheltenham - Effective pavement protection

Sainsbury’s Store, Cheltenham - Effective pavement protection

Tobermore

The strong interlocking capabilities of Tobermore’s Toberloc block paving proved to be the ideal solution for Daniel Hurd Associates who required a product that could handle regular pedestrian and vehicular use at this Sainsbury’s branch in Cheltenham.
Sponsored
The Portman Estate, New Quebec Street, London W1 - 
heritage shopfront ventilation grilles

The Portman Estate, New Quebec Street, London W1 - heritage shopfront ventilation grilles

Britannia Metalwork Services Ltd

A lovely example of our CGA01 cast iron grilles, these classic heritage designs are in keeping with the shop fronts in this beautiful Georgian street in central London. Britannia Metalwork grilles can be powder coated in any RAL paint, or a bespoke colour as seen here to match the setting. They can be used to disperse heat or set into steps or walls on the outside of houses to act as air vents for ventilation in cellars and basements covers, or set into the flooring of external or internal balconies.Providing an elegant and decorative solution to a practical application, please see the full range of designs on our website or contact us to discuss our bespoke service.
Sponsored
Door closer range helps a Belgian wholesaler provide a one-stop-shop service

Door closer range helps a Belgian wholesaler provide a one-stop-shop service

ASSA ABLOY Opening Solutions UK & Ireland

For nearly 90 years, Santens has helped building contractors buy the right hardware and tools for the job. Their success is built on supplying comprehensive solutions to the building and joinery sector across Belgium. As well as store-based operations, Santens supports loyal customers with sales representatives; offers a project management service; and runs a web shop. Click the link to read more.
Sponsored
STI protect vital life safety equipment with donation to local care farm

STI protect vital life safety equipment with donation to local care farm

Safety Technology International Ltd

Safety Technology International have donated protective covers to help a local community charity with false alarms at a time when they need it most.Wildgoose Rural Training is a charitable care farm in Hallow, just outside of Worcester, that supports adults and young people with a variety of learning disabilities.Starting in 2000 with just a handful of students, Wildgoose has grown into a 42-acre site with a thriving 6-acre farm where students from all backgrounds can learn horticulture, animal care, woodworking, arts and crafts, and carry out conservation work.Wildgoose supports students in a ‘happy and inclusive family atmosphere’ and focuses on teaching practical and meaningful land-based skills.One student had recently taken a liking to setting off the fire alarms in the main building at Wildgoose, resulting in frequent unnecessary evacuations.Not only did this cause a great deal of upheaval in having to evacuate the students from their buildings to the fire assemble points, but in students with sensory sensitivity and hearing issues these fire alarms caused a great deal of distress, panic and shock.On contact with STI, Wildgoose were recommended the Euro Stopper® call point covers with a sounder alarm to discourage the student from setting off the fire alarm. The protective covers were duly installed over the call points in their main building to prevent accidental or malicious tampering with the fire alarm without restricting legitimate operation in an emergency.Managing director of Wildgoose Rural Training Centre, Jim Hidderley said: “The call point covers provided by STI have reduced our regular false fire alarms from a weekly occurrence down to 0, the covers with sounders prove to be a sufficient deterrent from any mischievous hands.”“More importantly, the cover has ensured that our students are not put under any stress that is unwarranted due to false fire alarm triggering”The Euro Stopper® is a tough polycarbonate cover that can withstand the toughest of knocks and has an optional 96dB integral sounder that draws immediate attention to the area to dissuade unwanted activation of call points, therefore reducing false fire alarms.
Sponsored
Protecting the Fabric of the Building: New Avenue Case Study

Protecting the Fabric of the Building: New Avenue Case Study

illbruck – a brand of Tremco CPG UK Ltd

In the construction industry, contractors move at lightning speed to source the best products at the right price for their projects, all with the goal of ensuring client satisfaction and meeting tight deadlines. Renowned for our leading sealing, bonding, and insulation solutions, a selection of illbruck products were chosen through our extensive distribution network for the New Avenue project in Oakwood, London.The ProjectErected in an affluent neighbourhood within the London Borough of Enfield, New Avenue is an idyllic development boasting the peace and tranquillity of suburban life, whilst being only a stone’s throw from the hustle and bustle of Central London.Due to consist of over 400 mixed-type homes, ranging from apartments, maisonettes, as well as houses, this eight-year development will also include a community and energy centre, in addition to a new nursery. The SolutionDuring phase two of the new housing scheme, illbruck’s expertise were called upon to provide a vapour control layer for the Reinforced Concrete (RC) frame element of the project. This was to restrict warm, moist air from the interior of the finished structure from entering the fabric of the building. For the 11-storey block of flats, Central Essex Interiors required a solution at a competitive rate from a manufacturer with a good supply chain, due to the extensive size of the project.As a brand of CPG UK, illbruck has been recognised for over 70 years across the UK, Europe, and around the globe for supplying high performing solutions that meet the stringent requirements of the construction industry. Catering to a wide range of installation environments for both interiors and exteriors, from major building schemes to home improvements, our solutions can be tailormade to you or your client’s specification.The ApplicationProcured through one of our distribution partners, AC Fixings Ltd, illbruck ME003 Vapour Barrier was stapled into the party walls of the construction to achieve adequate vapour control. 500 rolls of this innovative 3-ply solution were required to protect the fabric of the building and its insulation, by providing a vapour and airtight seal. This in effect will help to improve the overall energy efficiency of the New Avenue apartment block, due to the product’s high-grade granules, which means that the SD value (resistance to vapour diffusion) is not lowered. The flexible and tear-resistant nature of this product boasts ease of application due to its lightweight properties, and is compatible with a number of illbruck’s intelligent window membranes and adhesives.Following the installation of ME003, illbruck’s ME315 Total Protection Tape was used to provide a high performance air and weather tight seal. This special tape is suitable for a wide variety of applications, and achieves a permanent bond to all illbruck indoor and outdoor building protection membranes. This fully compatible solution is highly UV and moisture resistant, quick and easy to install, and can be used within partially open facades. ME315 is also certified to EMICODE EC1 due to its low emission production, contributing to the energy efficient properties of ME003 to provide a total green solution for New Avenue.Scott Hurry, Area Sales Manager for illbruck, commented: “It has been a pleasure to work with our valued customer, AC Fixings, who in turn have supplied Central Essex Interiors with two of our leading products from our sealing and vapour control range.“illbruck was chosen due to being a highly recognised name within the marketplace, and we have been able to work with the Client to supply the products at a competitive rate and turn the project around quickly. The installation is due to span over a course of seven months with completion scheduled for late 2023.“When working with illbruck, however, you will receive more than just products. Behind our brand is a team of experts beholding a wealth of knowledge and industry experience, all of whom are well versed in applying the technique of illbruck’s innovative, high-quality products into the complexities of today’s construction environments. “As a customer of illbruck, you will receive technical support as and when is required, in addition to our suite of training, which encompasses everything from CPD seminars for architects, application tutorials for contractors and installers, as well as trade mornings for distributors.”
Sponsored
20,000m2 Rapidur® B5 Binder | B Doherty Screeding Services | National Mental Health Hospital Portrane

20,000m2 Rapidur® B5 Binder | B Doherty Screeding Services | National Mental Health Hospital Portrane

SMET Building Products Ltd

SMET supplied 20,000m2 of superior-quality Sopro Rapidur® B5 Rapid Drying Screed Binder to Smet Supported Partner, Brendan Doherty Screeding Services, for the flooring solution in the new hospital complex, The National Forensic Mental Health Service (NFMHS) in Portrane.The NFMHS is a new state-of-the-art facility located 22 km from Dublin City in Portrane, North County Dublin. The project was awarded by Health Service Executive to the Joint Venture formed by OHL (50%) and OHL’s local delivery partner JJ Rhatigan (50%).German-made Rapidur® B5 Rapid Drying Screed Binder is a special polymer-modified binder for particularly economical ­production of high-strength, rapid-set cement screed – based on DIN 18560 – allowing early floor installation, and for laying to falls.  Rapidur® B5 is suitable for use on heated screeds, bonded screeds, unbonded screeds, and floating screeds. This flooring solution is particularly useful for fast-track or tightly scheduled screed laying. The newly laid Rapidur® B5 screed floor is ready to receive floor covering after approx. 3 days – after the achievement of moisture content ≤ 1.8 % CM. Sopro Rapidur® B5 is supplied in 25kg bags, with 40 bags per pallet.Key features of Rapidur® B5:• Ready for tiling after only approx. 3 days• Achieves grade CT-C45-F7 after 28 days*• Pumpable• For fast-track or tightly scheduled screed laying and laying to falls• Suitable for floor heating systems• Long working life: approx. 2–3 hours• May be applied in mixing ratios 1:4 and 1:5• High resistance to moisture migration from the substrate• Suitable for renovation and refurbishment schemes• EMICODE system of GEV (German Association for control of Emissions in Products for Flooring Installation): EC1PLUS R (‘very-low-emission-plus’) rating• For indoor and outdoor useSMET delivers another innovative, showcase flooring solution to their Smet Supported Partners. Click the link to see a showcase of jobs recently completed by expert screeder, Brendan Doherty Screeding Services.
Sponsored
Gousto: Recipe Box Subscription Service

Gousto: Recipe Box Subscription Service

Concept Cubicle Systems

With the opening of 2 new fulfilment centres, Gousto required multiple washroom facilities that could accommodate their growing workforce and can withstand constant daily use.
Sponsored
FIREFLY™ TITAN Lite™ Protecting Life and History at new British Museum Facility

FIREFLY™ TITAN Lite™ Protecting Life and History at new British Museum Facility

FIREFLY™ TBA

The decision by the British Museum to move a substantial part of its collection of historical artefacts from storage in London to a new state-of-the-art facility in Reading has led to a major fire-stopping contract for a specialist sub-contractor; featuring the use of the FIREFLY™ TITAN Lite™ 120:60 from the TBA FIREFLY™ range.The development at Cutbush Lane East, in the Shinfield district, has seen main contractor Graham Construction awarded a £30million contract for the erection and fit out of the new facility and while the original specification for the well proven and widely used FIREFLY product came from project architects, John McAslam + Partners, the installation and on site expertise was provided by St. Albans based Loftus Construction Solutions Ltd. in installing the 60 rolls of TITAN Lite™ in line with the manufacturer’s standard details and project specific guidance.The Project Manager for Graham Construction, Andrew Gardner, commented: “The British Museum is closing down its storage facility in central London and moving it here to the new research and storage building in Reading, which we expect to complete early next summer (2022). In terms of the fire barriers these have been designed with both life safety and asset protection prioritised: preventing break out of fire from places like plant rooms, and also the protection of dividing walls from both sides.“This has meant the use of in excess of 30 different details including bespoke ones which has led to TBA/Loftus assisting in further developing the initial specification by JMP to suit the unique site conditions. FIREFLY made several visits to site and offered a lot of useful technical guidance and assisted with alterations being made, while Loftus Construction Solutions Ltd has done very good work on the installation of these complex solutions.”Patrick Loftus, MD of Loftus Construction Solutions Ltd, added: “As an ASFP accredited contractor in conjunction with our FIRAS and LPCB Accreditation’s for Passive Fire Protection System we are familiar with the FIREFLY range and have, in fact been using another product from the range (PHOENIX) for three years in work at Whitechapel Station as part of the overall Crossrail Scheme. Again this has enabled us to be meet our Clients’ needs for multiple unique details on another complex project. TBA complements our on-site activities with their excellent technical support which ensures we can deliver on all aspects of projects to our Clients requirements.Combined with all the site reports, our operatives have undergone training from FIREFLY, including training delivered on-site. The work here in Reading is progressing very well in terms of all the compatibility of connection details and all stakeholders involved are pleased with the results and suitability of the products and installation work carried out.”As a flexible, woven material TITAN Lite™ is easy to cut and fix and is chemically treated to improve its cooling properties, meaning it will prevent temperatures rising in adjoining areas when used to create compartmentation. It is installed as a three-layer, staggered system to achieve 120 minutes integrity and 60 minutes insulation. The system has been fully tested to BS 476 Parts 20 & 22 and is third party certified by IFCC.
Sponsored
Maldron Hotel Swimming Pool Renovation Tiles and Tanking | Precision Building Services

Maldron Hotel Swimming Pool Renovation Tiles and Tanking | Precision Building Services

SMET Building Products Ltd

Job: Maldron Hotel Swimming Pool Renovation, Portlaoise, Co. Laois.Smet Supported Partner:Precision Building Services – Mark PembertonProducts: Sopro Rapidur® B5 Rapid Drying Screed BinderMerlin Barrier CoatSopro RAM 3 (454) Renovation and Levelling MortarSopro GD 749 Universal Floor and Wall PrimerSopro DSF® 523 Tanking MembraneSopro PUK 503 PU AdhesiveSopro VF HF 420 – VarioFlex® High Strength Flexible Tile AdhesiveSopro’s No. 1 Flexible Tile AdhesiveSopro FKM® XL 444 – Extra Light Weight Tile AdhesiveSopro Sanitary SiliconeSopro DE 014/015 Sealing CornersSopro FEP 508Sopro DBF-638Racofix 818Description:SMET supplied Smet Supported Partner, Precision Building Services (Mark Pemberton), for the renovation of the Maldron Hotel Swimming Pool, Portlaoise, Co. Laois. A total area of Floor screed @ 140m² | Wall tiling @125m² | Floor tiling @ 140 m² was completed.New floor installation with fast-track – rapid drying floor screed solution, using Sopro Rapidur® B5 Rapid Drying Screed Binder, a fast-setting screed which was laid to falls prior to waterproofing and tiling providing an early completion. German-made Rapidur® B5 Rapid Drying Screed Binder is a special polymer-modified binder for particularly economical ­production of high-strength, rapid-set cement screed – based on DIN 18560.Rapidur® B5 is suitable for use on heated screeds, bonded screeds, unbonded screeds and floating screeds. This flooring solution is particularly useful for fast-track or tightly scheduled screed laying. The newly laid Rapidur® B5 screed floor is ready to receive floor covering after approx. 3 days – after achievement of moisture content ≤ 1.8 % CM. Sopro Rapidur® B5 is supplied in 25kg bags, with 40 bags per pallet.Sopro Rapidur® B5 was installed directly on top of Merlin Barrier Coat wet on wet. The screed was ready for waterproofing/tiling after 3 days. This system was also used to repair the Jacuzzi’s surrounding walls prior to waterproofing, tiling, and grouting.Sopro RAM 3 levelled the deck area (3-60mm) between the drainage channel edge and pool perimeter movement joint. Sopro RAM 3 was bonded with Sopro GD 749.
Sponsored
Perimeter protection and access control for storage facility

Perimeter protection and access control for storage facility

Jacksons Fencing

Access Self Storage is one of the largest self storage companies in the UK with over 20 years experience and 50 stores nationwide. Access Self Storage Twickenham is situated on Rugby Road and serves the storage needs of Twickenham, Richmond upon Thames, West London and Surrey. The site offers 24 hour access, large vehicle access and customer parking; as such it is important that site has a secure perimeter with controlled gated access. Jacksons were specified to install Barbican Imperial® fencing and gates combined with EuroGuard® Regular Mesh in order to improve access control and perimeter security at the site.
Sponsored
College Road, Croydon, Modular Construction

College Road, Croydon, Modular Construction

OBEX Protection Ltd

Location: CroydonMain Contractor: Tide ConstructionThe College Road project in Croydon, south London, comprises two towers. The tallest of these stands 50 storeys high, housing 817 co-living homes, and will be the tallest modular building in the world.The CORTEX 0500FR Class B Membrane and 0771FR Class B Paste Adhesive were both required for their compliance with the correct EN standard for performance and for their Class B fire-classification.Co-Living Homes: 817Affordable Residential Units: 120Two Towers: 50 & 35 StoreysHeight: 158m (World's Tallest Modular Building)
Sponsored
London Dock Block F, London

London Dock Block F, London

OBEX Protection Ltd

Location: LondonMain Contractor: Berkeley GroupLondon Dock Block F is situated in the heart of Wapping, London, with a magnificent choreographed central water feature and the finest selection of high-quality new homes.The building, which will provide a total of 360 new apartments, is split into blocks at different heights to a maximum of 16 storeys, including communal roof gardens, courtyards and green roofs.The OBEX Class B Interface Sealing System and the Class A1 Breather Membrane System were specified in order to achieve full regulatory compliance and meet the correct performance standards.Quality Apartments: 360
Sponsored
Protecting and restoring listed buildings - Thermal bridging

Protecting and restoring listed buildings - Thermal bridging

FOAMGLAS®

Thermal bridging solutions contributing to a conscientious and heritage-led approach on listed building projects.A PERINSUL case study
Sponsored
Rhepanol fk protects Garnet Chapel by Mario Botta

Rhepanol fk protects Garnet Chapel by Mario Botta

AccuRoof

Above the Ziller Valley in the heart of the Austrian Tyrol, the Penkenjoch rises 2,095m above the Ziller Valley. In spite of the special logistic and climatic challenges this location provides, an architectural gem has been built in just three months: the Garnet Chapel designed by Mario Botta.
Sponsored
FIREFLY™ APOLLO Lite™ 30:30 Fire Barriers Upgrade Protection for West Lothian Commercial Property

FIREFLY™ APOLLO Lite™ 30:30 Fire Barriers Upgrade Protection for West Lothian Commercial Property

FIREFLY™ TBA

Scotland’s biggest building services contractor has just completed upgrading the fire compartmentation within an existing West Lothian warehouse building which is being converted to serve as high bay storage facility to support the organisation’s existing distribution facility elsewhere in West Lothian and is, for the first time, making use of products from the range of TBA FIREFLY™, including APOLLO Lite™ 30:30 to create new fire barriers together with TBA’s expert advice and installer training.
Sponsored
Stylefold Hinged sliding folding acoustic moveable wall - Crown Commercial Services (CCS) offices, Norwich

Stylefold Hinged sliding folding acoustic moveable wall - Crown Commercial Services (CCS) offices, Norwich

Style - Moveable Partition Specialists

Crown Commercial Service (CCS) is the biggest public procurement organisation the UK. At its busy offices in Norwich, Style worked with contractor, Sol Services Ltd, to create flexible space in one of the meeting rooms, enabling staff to configure the area into two smaller rooms or to completely open-up the area into one single space.The partitioning experts at Style designed a system that combines two glass folding partitions with impressive 42dB Rw acoustic ratings, alongside a Stylefold 120 solid folding wall with a 50 dB Rw rating, successfully delivering the level of adaptability demanded by CCS.With over 900 employees spread across four UK offices, CCS uses its commercial expertise to help buyers in central government and across the public and third sectors to purchase everything from locum doctors and laptops to police cars and electricity. The new partitioning moveable walls help ensure there is always the required room space available to accommodate the myriad of meetings that happen each week. “This is a great example of how a combination of solid and glass acoustic folding walls can create flexible meeting room space which offers light and visibility but is also very private,” said Steve Williams, sales director for Style Midlands.“These walls are so effortless and light to manoeuvre that the space can be reconfigured in minutes, which means different room options can be created for different meetings throughout the day.“The glass moveable walls also retain that feeling of having open plan space, whilst the impressive acoustic integrity of these folding walls means that meetings can take place completely undisturbed.”Further adding to the interior design of the room, graphics were added to the solid moveable wall with matching manifestations on the glass.
Sponsored
SIKA PROVIDES IDEAL SERVICE FOR UNIVERSITY CHAPLAINCY

SIKA PROVIDES IDEAL SERVICE FOR UNIVERSITY CHAPLAINCY

Sika Liquid Plastics

Constructed in 1969, Lancaster University’s iconic chaplaincy centre is one of the first buildings that come into view when arriving on campus and amongst the university’s most architecturally distinctive. It features three circular roofs which rise in the centre of the building to create a three-pronged spire. The building has become an instantly recognisable visual symbol since being used as the basis for the university’s logo in 1989. The recent roof refurbishment project, delivered using Sika Liquid Plastics’ Decothane Ultra system, received the Liquid Roofing Project of the Year under 1000m2 at the LRWA Awards 2017.
Sponsored
G Park Northampton - Promat has played an instrumental part in the fire protection of the latest unit of GLP’s warehouse and logistics facility, G-Park, Northampton

G Park Northampton - Promat has played an instrumental part in the fire protection of the latest unit of GLP’s warehouse and logistics facility, G-Park, Northampton

Promat UK

Promat has played an instrumental part in the fire protection of the latest unit of GLP’s warehouse and logistics facility, G-Park, Northampton - providing a tailored 240-minutes fire resistance solution for Unit 4, a132,000 sq. ft speculative warehouse/distribution unit.  Situated within the popular Moulton Park industrial estate just north of the town and within 10 miles of J15 of the M1, G-Park has exceptional transport links, access to national markets, a locally skilled workforce and is home to a wide range of regional and national companies.   At short notice, the latest and final unit within the park required a solution that provided 4-hour fire resistance for the steel frame construction. Sub-contractor FAA Installation Ltd traditionally uses intumescent paints in its projects, but as this method was unable to meet the 4-hour fire protection required for the steelwork structure it was decided that boarding would be a more suitable alternative.  Promat VERMICULUX®-S and TD Boards® were specified for the project by Encon, a leading Promat distributor, as they knew that these were two of a limited number of products on the market that could meet the project’s requirements.   Promat worked closely with Encon and FAA on the final specification to provide a solution that could not only achieve the 240-minute requirement, but could also overcome the design complexities of the project, including fixing to both the structural steel and cladding rails, which most traditional boards were unable to accommodate. The completed installation demonstrates how VERMICULUX®-S and TD Boards® can interface together to create robust fire protection for warehouse and industrial applications. 
Sponsored
First class fire protection for the underground airport car park. 300 fire-proof doors and 52 sliding and sectional fire-resistant doors provide maximum safety on four car park levels.

First class fire protection for the underground airport car park. 300 fire-proof doors and 52 sliding and sectional fire-resistant doors provide maximum safety on four car park levels.

Teckentrup UK Ltd

A four-storey underground car park needs to meet enormous fire protection requirements. Preventive fire and smoke protection and fully functional escape routes and emergency exits were top of the list when planning the doors and barriers. T90 fire and smoke protection doorsets were used for highly frequented areas with a higher risk of fire and the gallery and escape routes between the individual fire compartments were fitted with single and double-leaf T30 doorsets with round glazing. Access points to the individual levels were equipped with T30 sliding doors and T30 sectional doors.
Sponsored
Sustainable Transport Charity, Moray Carshare, Extends New e-Bike Service Utilising FalcoCrea Cycle Lockers

Sustainable Transport Charity, Moray Carshare, Extends New e-Bike Service Utilising FalcoCrea Cycle Lockers

Falco UK Ltd

Sustainable transport charity, Moray Carshare, continues with the rollout of its new e-Bike rental service, with the latest addition at Tulloch Park car park in Forres, North of Scotland.Featuring a new installation of the FalcoCrea cycle locker, complete with vibrant, eye-catching branding graphics provided by the charity, the cycle locker is now equipped with two e-Bikes for members of the public to rent, with a further two more coming in the spring.The latest e-Bike service shown here at Tulloch Park now joins existing e-Bike rental stations at Fiddich Park car park and Speyside Way Visitor Centre, creating a network of e-Bike cycle rental hubs operated by the charity.The image attached shows a festive elf cutting the ribbon to the latest FalcoCrea cycle locker and announcing it open with members of the public now able to rent eBikes for as little as 99p per hour!The FalcoCrea has proven to be a highly popular cycle locker since its launch last year providing local authorities, with a cycle parking solution which answers three common problems; security, spacing footprint and branding. The FalcoCrea is designed to provide maximum security, within a compact space saving design and fully capable to incorporate branding to promote cycling as a principal mode of transport.  The ingenious cycle locker has already been commissioned for a number of schemes across the UK including recent installations at; Queens Cross Housing Association for Glasgow City Council, The Social Bite Village in Edinburgh, Rouken Glen Park in Glasgow, Barra Airport and Oban Airport.With the use of an electric cycle charging point (FalcoCrea+), the cycle locker can be transformed into a convenient charging hub for electric bikes whilst retaining all of the benefits from the standard model.Image: Daniel ForsythFor more information about the innovative FalcoCrea cycle locker, please contact our helpful sales team on 01538 380080.
Sponsored
The Temperate House, Kew Gardens, London - Cast Iron Ventilation Floor Grilles

The Temperate House, Kew Gardens, London - Cast Iron Ventilation Floor Grilles

Britannia Metalwork Services Ltd

Originally opened in 1863 and voted 'Best UK National Treasure' at National Geographic Traveller Magazine Reader Awards, the Grade 1 listed, iconic British landmark, The Temperate House at Kew, reopened in 2018 after a major five-year, £41 million restoration. Comprising five pavilions and showcasing over 10,000 new plants from all over the globe, this glass cathedral is the world’s largest Victorian glasshouse, protecting the often rare and tender plants throughout the UK’s cold winters. Commissioned in 2017 by renowned architects Donald Insall Associates - heritage and historic building specialists - and working with ISG, the global construction and engineering company, Britannia designed and manufactured 146 bespoke cast iron floor grilles - a total of 73 linear meters - to house part of the vast new sunken trench heating system. The original inadequate and inefficient heating, ventilation, and irrigation systems were no longer in adequate condition or sufficient for the purpose, and a new biomass underfloor heating system was added to produce ambient temperatures for the plants without impacting the integrity of the building. The finished bare metal design CGA03, meticulously created by our highly experienced pattern makers, echoes the original traditional Victorian grilles found elsewhere within the glasshouse complex and has since become Britannia’s signature grille. We are exceptionally proud to have been chosen and trusted to complete this award-winning project and are equally proud of our teams to produce it – from design, to manufacture, to installation.Frequently referred to as Cathedral, Ecclesiastical, or Victorian decorative floor grilles and as seen here, often placed over channels holding heating pipes, they provide a practical and decorative heating vent. Originally designed for churches they are increasingly popular in private houses, greenhouses, and commercial building developments. Our grilles can be ordered in cast iron or cast aluminium and finished in a wide variety of options.We also work in association with Gunning Heating, making decorative cast iron grilles that fit seamlessly into their underfloor trench heater units.  See our website for a full list of our grille designs and finishes or contact us to discuss your bespoke requirements.
Sponsored
358 Securi-Mesh® protects adventure playzone

358 Securi-Mesh® protects adventure playzone

Jacksons Fencing

Set within the 450-acre Mote Park in Maidstone, a brand new adventure playground has opened as part of a £4.3 million investment by Maidstone Borough Council. As well as creating a safe perimeter for the children’s play area at Mote Park, Jacksons Fencing was specified to supply fencing for the new adventure play zone. We supplied 120 metres of 2.4m high Securi-Mesh® fencing to create a safe and secure perimeter for the adventure playground, with 1 matching single leaf gate, and a pair of matching double leaf gates that can allow emergency access.
Sponsored
Structural Waterproofing & Ground Gas Protection

Structural Waterproofing & Ground Gas Protection

Delta Membrane Systems Ltd

The project was to convert a former vehicle maintenance and repair workshop into a dwelling. Ground tests did not reveal any significant level of Volatile organic compounds (VOC’s) in the soil but the local authority required a gas membrane to be installed and independently verified.
Sponsored
Protection: top of the agenda in the great Auckland Castle rescue

Protection: top of the agenda in the great Auckland Castle rescue

Selectaglaze Ltd

Working closely with Meldrum Construction and architects Purcell to support The Auckland Project’s conservation scheme in Bishop Auckland; Selectaglaze provided the Grade I Listed Auckland Castle with a bespoke secondary glazing solution to compliment the restoration for the purpose of security. Overall, the newly renovated rooms are far better equipped to house exhibitions and museum collections. Selectaglaze is proud to have been involved in this project that will generate a legacy for Bishop Auckland; supporting an attraction that will breathe new life and opportunities into the local economy and overall visitor experience.
Sponsored
Vertical bar fencing protects Barnardo's special needs school

Vertical bar fencing protects Barnardo's special needs school

Jacksons Fencing

In order to keep the students safe at the new site and mitigate the risk of trespassing and vandalism, perimeter fencing and gates were required to secure the grounds, which next to a busy main road also presented the danger of oncoming traffic. We supplied and installed 61 metres of 2 metre high vertical bar Sentry® fencing around the perimeter of the school site. Plus four manual single leaf pedestrian gates to match the fencing, two with push pads to stop unauthorised access from the outside.

Showing 181-216 of 1621

Feedback