NBS Source
I'm a manufacturer

"bauder"

274 results found

Sort by:

Showing 1-36 of 57

Sponsored
Bitumen Case Study: Whitburn Partnership Centre

Bitumen Case Study: Whitburn Partnership Centre

Bauder Ltd

Whitburn Partnership Centre was designed by Project Architects, Matthew Fair, Neil Forrester and Jamie Bateman at Smith Scott Mullan Associates for West Lothian Council. The design of the contemporary £4M building restores the historic Whitburn Burgh Hall original façade as it is one of the towns most renowned buildings and incorporates a new-build two-storey extension.Located in the centre of Whitburn, this building is a community hub that embraces the West Lothian Council’s model of bringing together services that benefit local communities whilst delivering financial efficiencies through the decrease of council buildings. This building facilitates a library, community halls, museum and customer information service office, making it an important community resource. Project:Whitburn Partnership CentreProject type:New buildLocation:West Lothian, Scotland,Waterproofing:Bauder Total Roof System (BTRS)Roof size: 525m2Energy generated from PV array: 10.35kWp Specifier: Smith Scott Mullan AssociatesMain Contractor: Maxi ConstructionApproved contractor: ProCladd (Scotland) LimitedSolar PV installer: Intelligent Electrical SolutionsThe specificationTo support the West Lothian Council's sustainability objectives of achieving high energy efficiency, it was our responsibility to specify a waterproofing system and provide a solution for natural energy generation. The bituminous Bauder Total Roof System (BTRS) was chosen for this project as it features membranes that can withstand impact and tearing, as well as thermal insulation that met the required U-value of 0.15 W/m²K. This waterproofing system is verified by the BBA and offers a service life in excess of 35 years.The BauderSOLAR system was also specified, as it incorporates photovoltaic arrays for natural energy generation. The photovoltaic mounting system is attached to the roof without penetration of waterproofing or the deck, safeguarding the integrity of the waterproofing to fulfil its full-service life.Project challengesThe Architect’s design incorporated unusually high parapet upstands, which posed a challenge for installers. Area technical manager for Bauder, Christopher Langton, attended design meetings with the Architects and Main Contractor to discuss the best solution for installation. A mutual agreement was made for the underlayer to be mechanically fixed to prevent any slippage of the capping sheet membrane. Due to the height of the upstand, non-combustible insulation BauderROCK was incorporated into the design at these details.The installation of BauderSOLAR F uses prefabricated bituminous BauderK5K membrane sleeves to slip over the mounting plates and welded into position, anchoring the plates to the surface of the Bauder waterproofing system. Approved BauderSOLAR installers, Intelligent Electrical Solutions, installed the BauderSOLAR system, collaborating with ProCladd, approved contractor for the waterproofing installation, and other trades during the roof installation.There is a junction where the flat roof meets the original slate roof of the adjacent building, this detail fell under the torch free zone that hot air welding techniques are used to install the membranes within these areas.The resultInstallation of the Bauder waterproofing system may only be carried out by trained and certified operatives approved by Bauder. A project pre-start meeting was held by Bauder site technician, Duncan Hastings, and area technical manager, Christopher Langton inviting the Site Manager from Procladd and their Bauder badged operatives. During this meeting, they discussed the installation of the project, and identified the areas that required torch-free and torch-safe detailing. They also discussed how the project was going to be delivered in co-ordination with other trades working on the site at the same time, for example cladding and lead that was installed atop the waterproofing upstand details.Weekly site-inspections were carried out by Bauder site technician, Duncan Hastings during the project. Visiting the site frequently meant that Duncan could provide consistent support to the installers and answer any questions they may have had directly. It also meant that the quality of the roof installation was being monitored regularly to ensure it would be to a high standard, achieving the comprehensive guarantee.The approach taken to deliver this project on time and to budget was through meticulous planning and working to tight time frames. The organisation of the delivery of Bauder products to site had to be in line with the schedule to ensure that the site was ready to receive a delivery. With the project located in the busy centre of Whitburn next to a cross junction with traffic lights. This meant that timed delivery of products to site was required in addition to prebooked off-loading by pump truck and tail lift or by telehandler.Health, safety and environment was managed during the planning, design and installation of this project by advising that all installers follow the advice shown in the “Responsible Specification Checklist” produced by the National Federation of Roofing Contractors.In accordance with the Workplace (Health, Safety and Welfare) Regulations 1992, roof edge protection in the form of scaffolding was installed during installation. The project’s perimeters were surrounded by Heras fencing to isolate the construction site from the public. All scaffolds that were on the elevation next to the public had toe boarding and safety mesh where required.As standard, there was a one-hour Firewatch after the Bauder membranes have been installed using a gas torch. This was carried out by Procladd operatives each day when they were working on the project to ensure the welfare of the workforce, and the safety of other trades and that of the building. The 19kg gas cylinders were used on this project as they are easily transportable on the roof area. At the end of each working day, the cylinders were stored in a locked and designated gas storage unit on site.System installedBauder Total Roof System (BTRS)1 BauderK5KElastomeric bitumen torch-on capping sheet in charcoal grey. This product features a spunbond polyester reinforcement to allow the finished product to cope with structural movement without fracture, and a mineral finish to provide protection against UV degradation.2 BauderTEC KSA DUOA self-adhesive, elastomer bitumen underlayer. This product features distinctive technology for lap sealing.3 BauderPIR FA-TE flatboard insulationA rigid polyurethane foam board faced on both sides with aluminium foil.4 BauderTHERM DS 1 DUOA self-adhesive, elastomer bitumen air & vapour control layer.
Sponsored
Blue roof case study: Cambridge University, Department of Civil Engineering

Blue roof case study: Cambridge University, Department of Civil Engineering

Bauder Ltd

This new build project in the centre of Cambridge combines a Sustainable urban Drainage Solution (SuDS) with vegetation and renewable energy in a warm roof construction.The client for the Department of Civil Engineering at Cambridge University, R H Partnership, identified sustainability as being a key driver in the design of the roof, but also sought a single source supplier that could provide a guarantee for both workmanship and products. Bauder’s systems range encompasses products to meet all the sustainability objectives, and with our network of approved contractors carrying out the installation, we could offer the comprehensive guarantee that was required.Bauder Building BoardProject:Cambridge University Department of Engineering​Location:CambridgeRoof Area:1610m²Client:University of CambridgeSpecifier:RH Partnership ArchitectsMain Contractor:SDC LimitedApproved Contractor:Voland LimitedThe specificationTo meet the sustainability criteria set out by the client, the Bauder technical team designed a roof system combining an extensive blue roof, a green roof and a solar PV array. The first and most fundamental element of the roof system though is the waterproofing. Bauder Total Green Roof System (BTGRS) was selected as it provides robust and durable waterproofing with a life span in excess of 35 years, as validated by BBA Certificate 10/4744. The Plant E cap sheet has also been tested by the FLL to ensure long term root-resistance, making it ideal for use in conjunction with the BauderSOLAR G LIGHT system. The BauderSOLAR G LIGHT system is a unique way to combine rooftop vegetation with renewable solar energy. The PV panel mounting boards are held in position using the growing medium as ballast, meaning the waterproofing is not penetrated and therefore compromised. The mounting boards incorporate a water retention feature which allows a small amount of excess rainwater to be stored for short periods of time for the various plant species to feed from. The BauderSOLAR G LIGHT system’s unique mounting system lifts the panels above the vegetation allowing the plant life to grow freely and therefore qualify a greater area of the roof as biodiverse.In addition to the BauderSOLAR G LIGHT system, a blue roof was added to the build-up. Blue roofs are sustainable drainage solutions designed to manage stormwater on a flat roof to reduce water runoff rates and ease flash flooding and standing water in built up areas. The BauderBLUE Roof System attenuates water from a flat roof over a 24-hour period via a restrictive flow outlet. Calculations are carried out to determine the rate at which the water should egress the rooftop. This is determined by the local planning authority and is often set as low as 5-8 litres per second per hectare. With these calculations, Bauder can design each flow restrictorto meet the necessary runoff rate. For the Department of Civil Engineering, the main roof area of 1455.5m² required two flow restrictors, each with flow control holes to ensure the specified discharge rate of 0.77 litres per second was achieved. The maximum depth of water the roof is designed for is the H-max. When the water level reaches H-max, it will drain via the emergency overflow pipe. These overflow pipes are set at the same height as the H-max level. On this project the H-max was calculated to be 99mm. Although an unlikely scenario, this provision for a ‘once-in-a-hundred-years’ storm event will ensure that the structural integrity of the building is always preserved.Project challengesThe roof deck was constructed using a pretensioned concrete plank roof structure. Due to the large span of these planks, the dead load weight to the roof would be restricted. This being a blue roof with green landscaping and PV (a reasonably heavy build up), presented the issue of balancing the need of the roof design and the weight restriction of the supporting structure. To add to this challenging scenario, the pretensioned deck did not provide a completely flat finish. When installing a blue roof, a flat deck with no positive or negative falls is essential, as detailed in the 2018 update of BS 6229 – Flat roofs with continuously supported flexible waterproof coverings. To overcome this onsite challenge,the final deflection of the fully loaded roof was calculated and the concrete deck was screeded to give a flat finish.The resultBauder believes this project to be one of the first of its type in the UK to bring together so many rooftop systems in one space. Project management and clear communication was paramount in order to ensure a smooth installation. The Bauder project team consisted of green roof and solar PV product managers, area technical manager, technical design team, site technicians and approved installers for the waterproofing.With all the different elements being installed, green roof and solar PV product managers worked with our technical team to design the best possible PV array configuration for optimum energy generation whilst also qualifying for the maximum biodiverse area.Bauder site technicians worked closely with Bauder approved contractors, Voland Asphalte Ltd, to ensure works were kept to schedule and that a high quality of workmanship was maintained throughout.To ensure the landscaping is maintained, irrigation was installed by Access Irrigation Ltd. The system, Permadrip Pro, is a drip line irrigation system with anti-syphon design to resist clogging and pressure regulation. Due to the specialist nature of the irrigation system, Access Irrigation Ltd provided a bespoke design service.The result of this network of expertise was a multi-faceted support service for the client, specifier, main contractor and roofing and PV installers. System installed1 BauderPLANT E 42Green, 5mm torch-on root-resistant capping sheet.2 BauderTEC KSA DUOA self-adhesive, elastomeric, bitumen underlayer. This underlayer was used to ensure thorough sealing of lap joints in low temperatures when the roof was installed.3 BauderPIR FA-TETissue-faced flatboard insulation faced on both sides with aluminium foil to provide efficient thermal output.4 Bauder Super AL-ETorch-on air & vapour control layer. Once installed on the concrete pretensioned plank deck, it can act as a temporary waterproofing layer, allowing internal works to be carried out immediately which was a huge advantage on this new build project.
Sponsored
Single Ply Case Study: Gloucester Transport Hub

Single Ply Case Study: Gloucester Transport Hub

Bauder Ltd

Gloucester Transport Hub Bauder Thermofol PVC single ply waterproofing system SynopsisThe replacement bus station and regeneration of the surrounding area has created a unique and distinctive city centre building for the town. The design connects with Gloucester’s Roman heritage and association with aviation. The innovative roof design incorporated a canopy intended to reflect an aircraft wing that required a lightweight waterproofing and renewable energy photovoltaic (PV) solution.Bauder Building BoardProject:Gloucester Bus StationLocation:GloucesterProject Type:RefurbishmentRoof Size:1520m²Constructor: Kier Group PlcApproved Contractor:Kovara Projects LtdThe specificationThe Bauder Thermofol PVC single ply waterproofing system with the BauderSOLAR F PV solution met the brief precisely without compromising the aesthetics of the roof. This combination of Thermofol PVC single ply waterproofing system and BauderSOLAR F PV delivered a high quality, strong, energy efficient flat roof.This system was selected for the project because of its lightweight properties which complemented the deck and roof design. Light grey was chosen to reflect the colour of the cladding as the aesthetics was a key objective for the client.The OMG Rhinobond induction welding system was specified as the installation method which provided multiple advantages to the project, not only saving time and fasteners, but also optimising the field fix pattern of installation and ensuring that the load on the roof was spread between the induction welding plates. Products appliedBauder Thermofol U15 FR MembraneA high grade virgin polymer Thermofol PVC membrane ensures the optimum membrane characteristics to deliver high performance and a BBA stated life expectancy in excess of 35 years.BauderSOLAR F An aerodynamically optimised system for flat roofs using framed modules and mounting units, securing them to the roof using membrane-to-membrane welding techniques. This installation method means that the roof is not compromised by penetrations of fasteners or is it ballasted.Project challengesThe design of the Transport Hub and city centre location proved to be the key challenge to this project. The unusual roof configuration required a bespoke insulation scheme using BauderPIR M, an efficient rebated PIR insulation board, in order to achieve the required U-value of 0.18W/M²K.The deck configuration equally made the installation of the Bauder Thermofol PVC waterproofing system complex with the perimeter zone having to be carefully marked in compatability the wind calculation which included measuring factors such as wind speed, altitude, direction and exposure. Bauder and Kovara Projects were required to work closely together to ensure all criteria of the wind calculations were met. 40 modules of the lightweight BauderSOLAR PV solution were installed on the west side of the Transport Hub’s roof.The location of the project, Gloucester city centre, presented logistical challenges. Delivery of the roofing products had to be carefully scheduled and managed to avoid creating congestion in the area.The resultThe installation required constant co-operation and communication to embrace the live site operations within the restricted city centre location whilst allowing the bus station to remain fully functional. The roofing contractor delivered a superior standard solution and any complex issues that arose during the project were resolved promptly and collaboratively.System installedBauderThermofol PVC single ply waterproofing system  1 Bauder THERMOFOL U15 FR1.5mm polyvinyl chloride membrane (PVC) reinforced with a pre-coated polyester cross-weaved matting for mechanically fixed installations. 2 BauderPIR MThis efficient tissue-faced flatboard insulation has been specially developed for use within Bauder single ply systems. 3 BauderSYN DB-PE 100A blue, polyethylene air and vapour control layer. The product is installed by loose laying and suitable for Thermofol mechanically fastened and ballasted single ply systems.
Sponsored
Paxman Avenue Secondary School

Paxman Avenue Secondary School

Bauder Ltd

Paxman Avenue Secondary SchoolBauderflex bituminous waterproofing system with Euroglaze rooflightsSynopsisPaxman Avenue Secondary School is a new build project situated in Colchester, Essex. The school opened its doors for the first time in September 2019 welcoming 180 year 7 students. It is expected that the school will eventually hold 900 pupils by 2023.Bauder Building BoardProject: Paxman Avenue Secondary SchoolLocation: Colchester, EssexProject type: New buildRoof size: 2500m²Architect: Concertus Design & Property ConsultantsMain contractor: Barnes ConstructionApproved contractor: G.R.M Roofing Company LtdThe specificationThe main contractor, Barnes Construction, was looking for a durable, cost effective roof with longevity, and wanted a waterproofing system which included a comprehensive guarantee with great service and full support from the supplier, and so Bauder’s bituminous system, Bauderflex, was specified. Rooflights were also specified to increase natural light into the building.Bauder’s Rainwater Calculation Software was also used to perform calculations in accordance with BS EN 12056-3:2000 based upon provided data relating to the building’s dimensions, geographical location and the flow rate performance of the selected Bauder rainwater outlet product. This helped to determine the total number of outlets needed for the roof.Products appliedBauderflexA reinforced bituminous membrane system with a choice of self-adhesive and torch-applied membranes that are resistant to high levels of structural and thermal movement. Bauder Euroglaze rooflightsThese rooflights are made to order and the size can therefore be tailor made to fit any roof aperture, with many ventilation and glazing options are available to meet the demands of any type of project.The resultThe client was supported by the Bauder Area Technical Manager, Andy Leggett, from start to finish with help being provided on the design element of the project, and the Bauder approved contractors, G.R.M Roofing Company Ltd, were supported by Bauder site technicians throughout the installation.
Sponsored
Marischal Square

Marischal Square

Bauder Ltd

Marischal Square Bauder Bakor Hot Melt structural waterproofingSynopsisMarischal square is a mixed use complex in the centre of Aberdeen based on the site of the former council headquarters building, St. Nicholas House. In 2011 Muse Developments undertook a £107m redevelopment of the site creating space for two new office buildings, seven restaurants and café bars, a 126-room hotel, a modern civic space and a new public space area in between the new buildings.Bauder Building BoardProject:Marischal SquareLocation:AberdeenRoof Area:5,400m²Client:Muse Development & Morgan SindallApproved Contractor:Briggs AmascoThe specificationWith large parts of the new roofing areas being accessible terraces and areas which will experience a significant amount of foot traffic, the Bauder hot melt structural system was a natural choice. The system was combined with hard and soft landscaping to provide the different aspects of the various terraces, stairways, podium decks and rooftops.The Bauder Hot Melt structural waterproofing system is ideally suited as a waterproofing system beneath paved or ballasted surfacing, car parks, podiums, plazas, green roofs and substructures.Project challengesA key challenge for this project was the fact that Muse Developments and Morgan Sindall, who were working jointly on the development, were looking for a single source waterproofing. Bauder proved to be the perfect fit, covering and delivering all elements of the waterproofing systems.The resultApproved contractor Briggs Amasco carried out the works on the 5,400m² of the separate roof areas, whilst expert Bauder site technicians carried out a total of 26 site visits over the duration of the project to ensure the quality of the installations. Following a final inspection, Bauder was able to issue a 20 year product and workmanship guarantee on the project.System installed1 BauderPLANT E 42Green torch-on root-resistant capping sheet.2 790-11Hot melt rubberised bitumen asphalt with a percentage of post-consumer recycled materials that infills and fully bonds to all minor deviations in the deck.3 DeckPrimed concrete.
Sponsored
Coláiste an Chláirín

Coláiste an Chláirín

Bauder Ltd

Coláiste an Chláirín Bauder Thermofol single ply waterproofing system with BauderROCK insulationSynopsisThe new Coláiste an Chláirín building in Athenry, Co Galway is a post primary school consisting of classrooms, a special needs unit, sports hall, general-purpose hall, staff amenities and extensive external facilities designed by Smith Kennedy Architects & Healy Partners Architects. The project was managed by JJ Rhatigan and Company and the roofing element appointed to Priority Roofing and Cladding Ltd. The roof of the main building and the gymnasium required flat roof build-ups to meet the specifications as set out in in SDG 02-05-03 (Acoustic Performance in New Primary & Post Primary School Buildings), while meeting the general performance requirements specified within TGD 021-7 2018 (Minimum Performance Standards of Roof Materials and Finishes). The chosen system had to meet an acoustic performance of 35dB indoor ambient noise level (IANL). It was decided that, despite sports halls having a slightly higher IANL threshold, the 35dB performance criteria would be applied across all areas of the school, with control of reverberation being a key consideration in the gym.Bauder Building BoardProject:Coláiste an ChláirínLocation:County GalwayProject type:New BuildRoof size:8550m²Main contractor:JJ Rhatigan & CompanyApproved contractor:Priority Roofing & Cladding LtdThe specification:The Architect specified that the insulation used in the flat roof system should be non-combustible and achieve a U-value of 0.16Wm²k which actually exceeds the thermal requirements as described in the Irish Building Regulations Technical Guidance Document L for flat roofs in schools.BauderROCK was specified to achieve the thermal and acoustic requirements of the design. As a Euroclass A2-s1,d0 non-combustible material, BauderROCK also provided the specified fire performance. This insulation could be used across all roof areas, with some adaptations for the gym which required additional acoustic performance due to the inherent nature of the space. Acoustic infills were used in the troughs of the perforated metal deck, thus combatting the reverberation of the indoor environment.  Products appliedBauder Thermofol PVCAn integrated single ply waterproofing system, featuring a lightweight, cost effective membrane which offers a pleasing aesthetic finish on a flat roof. This system holds fire classification BROOF(t4) for compliance with building regulations under TS 1187 test method 4 for external fire exposure to roofs. BauderROCKHigh density mineral wool insulation.Project challengesOne of the challenges of this project was the ambitious schedule. The use of the self-adhesive air and vapour control layer (AVCL) enabled the trades working within the building to progress quickly without being delayed by weather conditions. BauderROCK is relatively quick to install, as was the lightweight single ply waterproofing.  The resultThe project was finished to time and specification with exceptional workmanship from the fixers at Priority Roofing and Cladding and superb collaboration from all parties throughout. The membrane was finished with standing seams to create a statement look. The roof achieved a U-value of 0.15 W/m2k, exceeding the thermal target, and met or exceeded the 35db IANL requirement across the main building and the sports hall.  The thermal performance, which will hold up for decades to come, will also impart energy efficiency benefits that reduce running costs at the school in the long term. Finally, the non-combustible nature of the mineral wool insulation ensured that the build-up met the fire safety specification.  Advocacy Niall Hanley, Contracts Manager at JJ Rhatigan, the project’s main contractor, said:"Coláiste an Chláirín Athnery was a great success and in particular the use of the self-adhesive AVCL in advance of the build-up allowed works to commence immediately internally, which was critical from a programme perspective.” Kevin Ryan, Director at Priority Roofing, explained:"We found the system both practical and efficient to install. The combination of the availability of the products and the technical backup received was superior to any other system that we have worked with.”  Eoin O’Grady, Associate Director at Healy Partners Architects commented:"We are delighted with the overall delivery of the roof build-up and the performance achieved. The PE hall solution to deal with reverberation noise as well as rainfall noise was very successfully managed. We look forward to working with Bauder on future projects.” 
Sponsored
River Street Tower

River Street Tower

Bauder Ltd

River Street Tower Bauder Bakor Hot Melt structural waterproofing system with mixed landscapingSynopsisRiver Street Tower is a 32 storey, luxury student accommodation situated in Manchester.Bauder Building BoardProject: River Street TowerProject type: New buildLocation: River Street, ManchesterWaterproofing: Hot MeltRoof size: 1774m²Specifier: Simpson Haugh and PartnersApproved contractor:LRL Roofing Solutions
Sponsored
Robert Bloomfield Academy

Robert Bloomfield Academy

Bauder Ltd

Robert Bloomfield Academy is a middle school situated in Shefford, Bedfordshire that has approximately 800 pupils aged from 9 to 13 years old. Having recently had a Bauder roof installed, the school was keen to add a photovoltaic (PV) system to the building to meet their high sustainability aspirations. As a result of discussions with Bauder and funding specialist Evogreen, the school identified this as a perfect opportunity to have a no capital outlay PV solution fitted that would not compromise the existing 20 year roof guarantee.
Sponsored
South Lodge

South Lodge

Bauder Ltd

South Lodge is an award-winning luxury hotel in Sussex with breath-taking views of the South Downs. The client intended for the new spa building to blend in with the surrounding parkland. Bauder achieved this by specifying a wildflower, biodiverse roof. This consisted of a substrate-based system with Bauder WB native wildflower blanket. The blanket is a mix of British native plants which mirror the surrounding meadows, providing valuable ecological habitats for a mixture of wildlife.
Sponsored
The Hold

The Hold

Bauder Ltd

The Hold Bauderflex bituminous waterproofing systemSynopsisThe Hold is the home of the Suffolk Archives; safely housing the bulk of Suffolk's nationally and internationally significant artefacts and archives which is open for the public to explore.Bauder Building BoardProject: The HoldProject type: New buildLocation: IpswichWaterproofing: BauderflexRoof size: 2307m²Specifier: Pringle Richards SharrattApproved contractor: Voland Asphalte Company Ltd
Sponsored
Primark Distribution Centre

Primark Distribution Centre

Bauder Ltd

Replacing the roof on Primark’s 640,000 sq ft distribution centre in Thrapston, was the largest refurbishment of a single-ply roof undertaken in Britain in 2012 and clearly demonstrated Bauder’s status as one of the largest and most respected companies in the roofing industry.
Sponsored
150 Cheapside

150 Cheapside

Bauder Ltd

This landmark office development in the City of London features Bauder's hot melt and extensive green roof systems and boasts an 'Excellent' BREEAM rating
Sponsored
Fort Dunlop

Fort Dunlop

Bauder Ltd

During the recent regeneration in and around Birmingham, innovation has been a key factor; a theme optimised by the redevelopment of the Dunlop Tyres warehouse which has been transformed into 45,000m² of office space and a 6,000m² hotel. Practical challenges such as the reduction of noise pollution and maximising the building’s lifespan were all met by the Bauder Total Green Roof System with an extensive landscaping of sedum. The planting scheme provided instant coverage as the sedum was laid as pre-cultivated vegetation mats.
Sponsored
Hexagon Tower

Hexagon Tower

Bauder Ltd

Hexagon Tower is a specialist science and technology facility located in North Manchester. The roofs of the laboratories were experiencing water ingress due to poor original detailing and aged interfaces. Whilst looking to replace the failing roof, the client also wanted to upgrade the insulation to increase the U-value and improve the appearance of the rooftop using a trusted system. Bauder was selected as the supplier due to its comprehensive service offering, which includes detailed report, bespoke specification, project advice and ongoing inspections to ensure a full system guarantee can be issued.
Sponsored
National Innovation Centre for Ageing and Data Science (NICAD)

National Innovation Centre for Ageing and Data Science (NICAD)

Bauder Ltd

National Innovation Centre for Ageing and Data Science (NICAD) is a flagship building in Newcastle upon Tyne on the high-tech, city centre Helix Science Site where a number of building are being constructed. The client wanted an integrated PV system that didn’t compromise the integrity of the green roof solution being installed. Bauder were asked to design and supply a 30.78kWp system, generating an estimated 26,140kWh per annum.
Sponsored
Key Theatre

Key Theatre

Bauder Ltd

The Key Theatre in Peterborough’s city centre combined Bauder’s reinforced bitumen membrane waterproofing system and sedum blanket green roof finish with a photovoltaic solution, which the council’s contract manager.
Sponsored
George Abbot School

George Abbot School

Bauder Ltd

Located in Guildford, George Abbot School is a secondary education school which provides education for 2000 people aged 11 to 18. The school had a history of leaks in the DT rooms above which a profiled sheet metal roof was installed. Following many attempted repairs, Bauder was commissioned to carry out a roof survey on the 228m² profiled sheet metal roof. The report identified issues with not only the gutter area, which was originally believed to be the problematic area, but also with the adjoining profiled roof and also with the large rooflight unit.
Sponsored
Borrisokane Community College

Borrisokane Community College

Bauder Ltd

This new college features over 3,500m2 of Bauder's Thermofol single ply system along with PVC roof profiles to replicate the appearance of a standing seam metal roof.
Sponsored
Waitrose Superstore

Waitrose Superstore

Bauder Ltd

This £14 million Waitrose superstore is built on a brownfield site located in Bagshot, Surrey. The client wanted the new development to replace the green space lost to the building’s footprint and minimise its overall impact on the surrounding landscape. This was achieved through the installation of 4,800m2 of Bauder’s high quality, low maintenance sedum blanket, which is highly visible even at ground level.
Sponsored
Chelmsley Wood Shopping Centre

Chelmsley Wood Shopping Centre

Bauder Ltd

Chelmsley Wood Shopping Centre, located in East Birmingham, was experiencing leaks with their current flat roof waterproofing system and so they needed a quick, high quality solution to remedy the situation. Although competitors had suggested the only option was to strip the roof, Bauder found a more cost-effective answer by using our in house Troxler Moisture Gauge to identify any areas of wet roof construction, removing the saturated areas and then overlaying the whole roof area.
Sponsored
Sharrow Primary School

Sharrow Primary School

Bauder Ltd

The Bauder green roof on Sharrow Primary School in Sheffield was the first in the country to be declared a nature reserve. A fitting accolade for a school that defies traditional ideas of what a school should be.
Sponsored
Carrow Quarter - Norwich

Carrow Quarter - Norwich

DCM Surfaces

DCM Surfaces were excited to work on the prestigious residential development at Carrow Quarter, Norwich.The housing development comprises over 300 units and includes a landscaped communal area.The project included the install of the sub-base, Artificial Grass and Bound Gravel onto a Bauder Drainage system.
Sponsored
Small Animal Hospital

Small Animal Hospital

Bauder Ltd

Set within the Garscbue Estate, Archial Group, the Architect, wanted a new build project with as minimal visual impact as possible, so the building was constructed within the side of a hill with a green roof. Towards the end of the roof’s construction a seeded grass finish was opted for.
Sponsored
Roundwood Park

Roundwood Park

Bauder Ltd

A number of the building’s roofs at Roundwood Park School needed refurbishing to prevent further water ingress entering the classrooms below. The client wanted the new waterproofing system to be of high quality and provide falls to the roof to help mitigate ponding water. A no capital outlay PV solution and new rooflights were also desired as part of the works to optimise the roofs functionality. The school remained open throughout the project creating logistical challenges.
Sponsored
Royal Opera House

Royal Opera House

Bauder Ltd

This £8.3m building is used by London’s Royal Opera House to build scenery for its elaborate ballet and operatic performances. Located at the £60m High House Production Park, in Purfleet, which opened at the end of 2010, the workshop boasts outstanding green credentials.
Sponsored
Oughterard National School

Oughterard National School

Bauder Ltd

The architectural vision for this new build was to create a modern learning environment that would add value to the local community. The building consists of eight roof areas on a variety of different pitches totalling 3,400m². Aesthetics were also important to the client as most of the roof areas are pitched at a 20° slope making them highly visible, particularly from the central courtyard area.
Sponsored
St.Michael's Maternity Hospital

St.Michael's Maternity Hospital

Bauder Ltd

The original waterproofing on the Maternity Hospital roof had exceeded its serviceable life and begun experiencing water ingress, requiring urgent remedial work. Bristol City Council wanted to optimise the roof area by installing a high quality, long lasting PV array that would contribute to its Solar City scheme that aims to provide one gigawatt of solar power to Bristol by 2020. The installation needed to cause minimal disruption to ongoing work at the hospital and insulation upgrades were necessary to ensure the roof achieved the required 0.25 U-Value.
Sponsored
Castlebar Government Offices

Castlebar Government Offices

Bauder Ltd

The roof area of this government office building was complex due to expansion joints, air conditioning units and intricate detailing requirements. Work hours had to be agreed with the client to keep disruption to other ongoing work at the site to a minimum.
Sponsored
11 Freebournes Road

11 Freebournes Road

Bauder Ltd

A large derelict warehouse located in Witham has undergone major renovation to transform it into a storage centre for Essex County Council that will assist its services and benefit the local community. The refurbishment works were designed and project managed by Lambert Smith Hampton on behalf of the client, who wanted the building to act as a benchmark for sustainability with the roof playing an integral part in achieving this through the addition of solar panels.
Sponsored
Sybil Andrews Academy

Sybil Andrews Academy

Bauder Ltd

A brand new school on the outskirts of Bury St. Edmunds in Suffolk was built to accommodate 1,600 students. The project was designed and managed by Concertus Design & Property Consultants on behalf of Suffolk County Council, who wanted the school to act as a benchmark for sustainability with the building’s roofs playing an integral part in achieving this through the inclusion of solar panels.
Sponsored
Den Court

Den Court

Bauder Ltd

Constructed in 1977, Den Court is a large retirement home made up of 24 flats in the small town of Lochgelly in Fife. The regeneration of the sheltered housing by Fife Council involved the demolition of part of the building as well as replacement windows and doors, landscaping and a new car park.
Sponsored
Linn Products

Linn Products

Bauder Ltd

The roof area was badly damaged by heavy storms, with all existing ballasted solar panels lifting off the single ply roof and destroyed beyond repair. The client needed the remedial work completed to fixed deadlines in order to comply with insurance requirements, and wanted to optimise the roof by replacing the pre-existing photovoltaic (PV) array with a solar solution that would deliver superior energy generation. The office also had to remain operational throughout the works, creating logistical challenges
Sponsored
ROM Ltd

ROM Ltd

Bauder Ltd

ROM Ltd is a specialist manufacturer of reinforcement solutions that has facilities located throughout the UK and Ireland. The waterproofing on the roof of their Sheffield manufacturing facility had exceeded its serviceable life and the main-substructure was extremely corroded leaving it unstable and requiring urgent remedial work.
Sponsored
Clapham Park

Clapham Park

Bauder Ltd

The regeneration at Clapham Park involved the demolition of old housing stock to make way for new affordable homes. The 5-storey building with 21 dwellings incorporating the latest rooftop technology which blends a biodiverse green roof and unified solar PV array. This approach met the planning requirements and maximised the limited roof space to generate energy for the residents. The development was certified BREEAM ‘Outstanding’ due to its environmental, economic and social sustainability attributes.
Sponsored
HMP Pentonville

HMP Pentonville

Bauder Ltd

Completed in 1842, HMP Pentonville has remained in use since opening, experiencing many stages of refurbishment throughout the decades. In 2003, the existing asphalt deck above the kitchens was in need of a complete refit with the building having to remain in use throughout the refurbishment of the roof.
Sponsored
The Centre for Agricultural and Biosciences International (CABI)

The Centre for Agricultural and Biosciences International (CABI)

Bauder Ltd

The Centre for Agricultural and Biosciences International (CABI) is an inter-governmental, not-for-profit organization that improves people’s lives worldwide by providing information and applying scientific expertise to solve problems in agriculture and the environment.His Royal Highness the Prince of Wales opened the old CABI headquarters in September 1987. Over time, the former school building had become outdated and was no longer fit for purpose, being uneconomical in terms of layout and energy efficiency, and required a high level of maintenance.

Showing 1-36 of 57

Feedback