NBS Source
I'm a manufacturer

"lifts"

1,227 results found

Sort by:

Showing 181-216 of 283

Sponsored
Bow River Village, London

Bow River Village, London

Leviat

This mixed use development on the southern fringes of the Olympic Park utilised the Nexus® system to achieve flawless brick-faced soffits to the hundreds of door and window heads. Nexus is a two-part brick soffit system that combine a high integrity stainless steel brickwork support system with custom-designed prefabricated brick faced soffit units. Being 70% lighter than traditional cast concrete solutions, the Nexus soffit system is simply lifted and bolted into position by hand and, as the brick slip facing is manufactured from the same batch as the main brickwork, presents a perfect colour and texture match for flawless transitions.
Sponsored
Ampersand, London

Ampersand, London

Planet

Darling Associates and McLaren Group approached Planet Partitioning to undertake the internal atrium glazing and fire-rated glass doors for their fit-out of Ampersand, London. Planet was specified to design, manufacture and install all the glass partitioning for an internal atrium, balustrades and fire-rated and non–fire rated lift lobby doors. For the atrium, Planet Partitioning used full-height frameless 15.5mm low-iron toughened laminated glass. This highly curved atrium needed glass rising from the door plate to create a fluid feel, complementing the central spiral staircase. Planet then installed steel framework to support the atrium glazing.
Sponsored
Secondary Glazing receives a warm reception in top London PR office

Secondary Glazing receives a warm reception in top London PR office

Selectaglaze Ltd

Premier PR, located in a 19th Century former warehouse had had thermal and acoustic secondary glazing installed by Selectaglaze to help produce a more amenable working environment for office staff. Selectaglaze installed 115 windows across the ground, first, second and third floors. A wide range of products were combined for the specification, the majority of which were two and three pane horizontal sliders. The Series 30 lift-out unit was specified for one particular opening to allow easy access for cleaning. Another primary window was fitted with a single side hung casement, designed to suit the existing fenestration.
Sponsored
Arts University, Bournemouth

Arts University, Bournemouth

Senior Architectural Systems Ltd

Sustainability and design were the major focus for this new £24 student accommodation project which achieved a ‘Very Good’ BREEAM rating. Senior’s highly thermally efficient glazing package was chosen to meet the scheme’s sustainability criteria and budget. This included thermally enhanced SPW600 windows fitted with a Louvre Guard System in bedrooms and kitchens and with smoke vents in corridors for additional safety and security. With their innovative thermal break offering exceptional thermal efficiency, PURe® Commercial Doors were installed at the security office whist PURe® SLIDE Lift & Slide doors were specified for the large communal area.
Sponsored
Powder coating replaces Corten to achieve a harmonious finish in an iconic location

Powder coating replaces Corten to achieve a harmonious finish in an iconic location

Powdertech (Corby) Ltd

Iona Abbey on the Hebridean island of Iona has undergone a significant refurbishment including installation of galvanized steel canopies over the entrance to the refectory based on the symbol of wild geese. Mild steel perforated panels were used for the internal mezzanine balcony frontage in the refectory and the lift surround. The finish chosen for all metalwork was Evolution™- Diamond Mine, reflecting the natural rusting of steel. A high-performance duplex corrosion protection system for external metalwork with an authentic aged, weathered look without any staining of external stonework, together with less exposed internal metalwork, it achieved a harmonious finish throughout.
Sponsored
Thermally Broken, Glazed, Sliding Hatch

Thermally Broken, Glazed, Sliding Hatch

Surespan

The new thermally broken sliding roof hatch opens horizontally on fixed or telescopic rails. The hatch features the following key points: Thermally Broken Lid & Upstand Fixed or Telescopic Rails ‘Lift-Off’ Unseated Opening, ensures the hatch is sealed and secure when closed. Self Sealing Double Seals 0.43 W/m²K U-value Perfect for manual operation, the sliding cover easily and smoothly opens. Brush seals around the front and side ensure that no roof debris can interfere with the mechanism and the external fixed rail provides enhanced support for larger sliding covers.
Sponsored
Commercial | London Gatwick Airport

Commercial | London Gatwick Airport

Venesta Washroom Systems Ltd

London Gatwick is the second largest airport in the UK.System M was recommended for its stylish design and durability to withstand the heavy footfall. It also has an emergency feature to access the toilet cubicles in less than 30 seconds. This patented system enables normally inward opening doors to be opened outwards, without having to break components or lift off the pilasters or doors.Integrated hand basin modules were specified for easy access for maintenance staff and a streamlined experience for users. The finish was completed with Clipclad wall panelling, pre-plumbed services and stylish mounted glass cladding.Read the full case study for more details.
Sponsored
How to move a floor access cover safely and easily

How to move a floor access cover safely and easily

Howe Green

By using a pair of Howe Green Access Cover Skates you will make light work of moving heavy access covers! Health and safety is a major consideration for all building owners, facilities managers and contractors. The Howe Green Access Cover Skate removes the need for operatives to manually move heavy manhole covers and access covers when accessing concealed services. By reducing the requirement to handle heavy objects the risk of injury is greatly diminished. With up to a 300-kilo lift from each Howe Green Access Cover Skate you will benefit from a powerful floor access cover lifter.
Sponsored
Crossrail, Tottenham Court Road

Crossrail, Tottenham Court Road

Howe Green

Over 400 of Howe Green’s Access Covers have been supplied to Tier 1 contractors working on Europe’s largest construction project – Crossrail. Over 60 of Howe Green’s 7500 Series Multipart Floor Access Covers were supplied specifically for Tottenham Court Road Station. The large 4 part units were precision made to order to ensure they would be a perfect fit, avoiding slips and trips in such a highly trafficked and challenging environment. The covers have been infilled with granite to match the surrounding area and supplied with barrel lifting points, with just the securing bolt and barrel edge visible.
Sponsored
Fire Curtains to EW120 for 125 Deansgate Manchester UK

Fire Curtains to EW120 for 125 Deansgate Manchester UK

A1 Shutters Ltd

Whilst certainly not the most iconic or largest project the A1S Group has ever been involved with, 125 Deansgate in Manchester in many ways represents for us "a bread and butter project", the like of which we are involved with throughout the UK on an almost monthly basis. Despite the doom and gloom of office rationalisation during the pandemic, high end office new build and cat A and B refurbishment continues to be one of our strongest sectors. We have completed literally hundreds of office projects over the last decade including We Work premises throughout London and the UK, Goldmann Sachs, Barclays at Canary Wharf and Norfolk House in St James Square, London. Fire and smoke curtains continue to be integral to modern office design, allowing for more open spaces within the building's wider fire strategy framework. The A1S Group manufactured, installed 54 Flameshield fire curtains, all with smoke seals and multi function panels. For us, the 125 Deansgate building was noteworthy as it was the first time that we installed our high performance Flameshield EW120 fire curtain to provide a minimum of EW90 compartmentation. We also manufactured and installed our a Flameshield fire and smoke curtain system to provide 120 minutes integrity and 15 kw/m2 to protect the lift and lift shaft. This striking building is clad in a rich red terracotta with 12 storeys of flexible office and retail space all achieving BREEAM 'excellent' and is now considered one of Manchester's premier offices. The A1S Group have a long term planned preventative maintenance in schedule in place to comply with the 2005 Regulatory Reform Order.
Sponsored
Southmead Hospital Gustafs Acoustic Panels

Southmead Hospital Gustafs Acoustic Panels

LSA Projects Ltd

Architect: BDPInstaller: Houston Cox Ltd Product: Gustafs Panel SystemLSA are very proud to have supplied over 2 000 m2 of GUSTAFS Panel System® to the stunning Southmead Hospital which opened in Bristol in 2014.Oak veneer was chosen by the architect to contrast it’s tactility and visual warmth with the cool glazed and coloured elements elsewhere, SM8 mini slot perforations were used to add class B acoustic control to the 6 storey atrium space.Panels for the stair-cores were custom made and delivered fully assembled by Gustafs to achieve the gentle curve to the outside of the central tower. Chris Green, Architect Director at BDP had this to say: “The stair and lift cores centred in each of the colour themed atria spaces are key wayfinding points on a visitors’ journey to the wards and we wanted these elements to have the feeling of bespoke pieces of high-quality crafted furniture, bringing the tactility and visual warmth of a timber against the contrasting glazed and coloured elements elsewhere.The acoustic requirements and characteristics of the atria spaces are complex and the timber shroud surrounding to the stair and lift cores formed an ideal centralised location to act as a primary absorber.The extensive range of GUSTAFS panel perforation patterns, veneer finishes and jointing options enabled us to develop a precise and calming aesthetic to the high-performance absorbing and panelised skin, enhanced by the bespoke curved corner elements.We are extremely pleased with the final appearance of the GUSTAFS Panel System® which has helped deliver a stunning focal point to each of these primary public spaces within the new hospital.”
Sponsored
Delivering accessibility to the New Carlsberg Foundation

Delivering accessibility to the New Carlsberg Foundation

Guldmann Limited

The New Carlsberg Foundation is housed in the old brewery yard on Brolæggerstræde, where both J. C. Jacobsen and his son Carl were born, and which was home to the original Carlsberg brewery.In autumn 2016, Stepless was approached by ELGAARD Architecture, which had been contracted to renovate and modernise the New Carlsberg Foundation’s headquarters, located on Brolæggerstræde in Copenhagen.The architecture firm asked Stepless to design an elegant and discreet solution consisting of a lifting platform that would fit with the historic building and the surrounding courtyard. In addition to providing accessibility for visitors with reduced mobility, the purpose of the solution was primarily to facilitate the process of moving sculptures from street level and into the building.
Sponsored
Metal pipe boxing protects sprinkler pipework

Metal pipe boxing protects sprinkler pipework

Pendock

Metal pipe boxing from the Pendock Profiles range is being used at a London tower block to conceal and protect fire sprinkler pipework, cabling and other services as part of a fire safety upgrade and refurbishment programme.Bespoke manufactured to the exact dimensions and project requirements, the metal boxing is non-combustible, which makes it suitable for use in public areas, such as lift lobbies, landings and corridors, where no sprinkler heads are present.Finished in white PPC, the metal pipe boxing not only improves the overall aesthetics, but also provides durable protection for pipework and services, while the integrated hinged inspection panels allow easy access for routine checks and maintenance.
Sponsored
50-60 Station Road  Cambridge

50-60 Station Road Cambridge

Ibstock Telling

Working in collaboration with façade specialist Dane Architectural enabled the design to be developed towards a light weight facade solution that combines GRC fin shaped columns and feature beams fixed directly over areas of the curtain wall grid system at locations where insulated panels were present.This strategy had several advantages, in the first instance a weather tight structure was provided early on in the programme, whilst the GRC facade option provided a much lighter solution that provided significant savings in both cost and time. The access strategy, based on mast climber platforms adapted to include lifting beams, enabled glazing and GRC panels to be hoisted swiftly into position.
Sponsored
Old Granada Studios

Old Granada Studios

MOY

Part of the prestigious St. Johns development in Central Manchester, was formerly the location of Granada TV Studios and overlooks the cobbles of the former Coronation Street set where the facade of the legendary Rovers Return can still be seen by the turnstile at the entrance to the site. The Old Granada Studios project has been delivered by B&K with the roofing installation carried out by approved contractors S1 Roofing. The project features a full MOY Specification comprising Paromelt Hot Melt Liquids on the main roof at level ten and the level eleven stair core, and on the level 9 balcony along with a RBM warm roof on the level 12 lift over run.
Sponsored
Wakefield Westgate ‘‘Gateway’’ Station

Wakefield Westgate ‘‘Gateway’’ Station

Naylor Concrete Products Ltd

Naylor Lintels have been supplied to another prestigious project. Network Rail awarded the Wakefield Westgate “Gateway” Station project to Buckingham Group Contracting Ltd. The overall scope of the project • The construction of a BREEAM 2011 Excellent rated Station Building including DfT Code of Practice compliant lifts providing step free access to Platform 1 & Platform 2 and an enclosed footbridge • The Station embraces a modern open plan foyer including a travel centre, retail outlets, coffee shops and First Class Lounge • Integrated transport interchange providing a functional forecourt with Taxi/car drop-off, short stay parking and bus replacement facilities
Sponsored
Cambridge North Train Station

Cambridge North Train Station

Spanwall Facades Ltd

A key design feature of the new station was a perforated pattern in its rainscreen cladding. Contractors engaged Spanwall to create this complex design brief of perforated rainscreen cladding. The perforations within the cladding were intended to provide passive security and ventilation to glazed areas around the concourse as well as views across the site. Spanwall worked closely with the contractor to engineer its RF50-FR rainscreen system. Spanwall manufactured the perforated aluminium cladding system in a polyester powder coated metallic silver. This was installed in two sections and lifted into position during a short window throughout the night. This was a complex project with exacting design requirements and is a true example of the manufacturing ingenuity at Spanwall.
Sponsored
Bank Station Capacity Upgrade, London - Watertight Concrete

Bank Station Capacity Upgrade, London - Watertight Concrete

Sika Limited

Built in 1900, London’s Bank Station provides access to the Central, Northern, DLR, Waterloo and City lines and is one of the world’s most complicated subterranean stations.The expansive Bank Station Capacity Upgrade (BSCU) programme, commissioned by London Underground, will increase capacity by 40 per cent. In addition, it will improve access, decrease crowding and generally deliver a modern public transport facility with better ambience.Whilst the BSCU scheme as a whole incorporated a wide range of elements – new entrance, three ticket halls, six lifts, 10 platforms, two 94m travelators and a 570m tunnel & platform for Northern Line – Sika’s involvement was on the whole block site.
Sponsored
Doncaster Carr IEP Depot

Doncaster Carr IEP Depot

Lionweld Kennedy Group

Lionweld Kennedy supplied and installed both open mesh flooring and GRP light out removeable handrails to 4 twin level access gantries at the 'Doncaster Carr IEP Depot' for Hitachi Rail Group.We supplied and fixed demarcation fencing with integral gates to form the stores area within the facility.Also, we supplied and fixed internal depot protection to fork lift routes, including column protection, bollards and spring steel barrier systems.Using both steel open mesh flooring and GRP handrails was a great cost solution for the client, as we were able to utalise our products to create a safe working environment which is fully compliant with British and European standards.
Sponsored
Tesco Express Store - Shaw, (near Rochdale).

Tesco Express Store - Shaw, (near Rochdale).

Flexi Support Systems at DiversiTech International Ltd

Products: Flexi Access – Bespoke access platforms. Services: Existing condensers. Roof build-up: Existing warm roof design (bituminous felt) – Overlaid with a liquid applied plastic waterproofing layer. An operational Tesco Express store, in the heart of the Shaw community, that had existing high level rooftop condensers requiring annual maintenance. Pump House supplied a safe access solution around two existing high level condensers. Pump House carried out a site survey and provided full working AutoCAD drawings for approval. The access solution was manufactured in smaller modules which facilitated easier lifting and fitting. Pump House attended site on the day of installation.
Sponsored
Middlewood Locks, Manchester

Middlewood Locks, Manchester

Kawneer UK Ltd

The first phase of the Middlewood Locks project in Manchester by developer Scarborough International Properties features Kawneer’s AA®100 zone-drained curtain walling, AA®130 brise soleil and AA®720 external doors on the ground floors of six blocks of apartments around three large basins of the Manchester, Bolton and Bury canals.The AA®130 brise soleil has also been used between external balconies as privacy screens and was complemented by Kawneer’s AA®3572 lift/slide doors and AA®720 thermally-superior side-hung casement windows which feature on the first floor upwards of the seven-storey blocks.
Sponsored
SYNTHA PULVIN CASE STUDY
SPINNAKER TOWER – PORTSMOUTH, UK

SYNTHA PULVIN CASE STUDY SPINNAKER TOWER – PORTSMOUTH, UK

Sherwin-Williams General Industrial

Portsmouth’s iconic Spinnaker Tower in the UnitedKingdom is described as one of the most spectaculardesign projects. With a leading powder coating fromSherwin-Williams, the tower is guaranteed to stayshipshape for years to come.Soaring 170 meters above Portsmouth’s historiccoastline, the Spinnaker Tower marks the completionof a massive £84M redevelopment scheme: TheRenaissance of Portsmouth Harbour. As a majorlandmark on the South Coast, the sail-shapedproject demanded the ultimate aesthetic anddurability from a powder coating finish.Sherwin-Williams approved-applicator MetalionLtd applied Syntha Pulvin coating products to thetower’s lift areas and observation deck. The finisheswere specially mixed to replicate the color of theexternal render for the project.
Sponsored
Green Park Tube Station

Green Park Tube Station

Albion Stone plc

This £48M project provided a new copper and Portland Stone cladding canopy fronting Piccadilly provides shelter for the lift entrance and a new staircase that runs from Piccadilly.The planning approval process involved collaboration with artist John Maine RA whose work is featured in relief on the Portland Stone cladding and granite paving to the Piccadilly area of the project. The work focuses on the geology of the Portland Stone cladding and setting of the station in the natural environment of Green Park.Art on the Underground commissioned artist John Maine RA to create a new artwork which forms part of the station structure for passengers to enjoy.Albion Stone provided stones from the full range of Portland Stone beds available creating a stunning contrast between the stones
Sponsored
Kindred House, Croydon

Kindred House, Croydon

Cellecta Ltd

Kindred House is a 25-storey block made up of 128 one to three bedroom residential apartments overlooking the Croydon Flyover. Of these homes, 60 are affordable, and includes above flexible office and retail space, and 1000m² of flexible commercial space adjacent to the road. These all act as a buffer for the affordable apartments on the opposite side of the plan. The building has been stabilised with RC lift cores and RC shear walls and supported on reinforced concrete piled foundations.Cellecta’s YELOfon HD5 was specified by Pitman Tozer Architects on this project for its excellent high impact sound deadening properties ideal for a block of flats. It is a lightweight, easy to install non-crosslinked polyethylene foam.Henry Construction was awarded the 10,000m² contract to construct these modern apartments.
Sponsored
Junckers Oak Boulevard for award-winning Kresen Kernow archive and research facility

Junckers Oak Boulevard for award-winning Kresen Kernow archive and research facility

Junckers Ltd

A large expanse of Junckers’ Nordic Oak flooring forms part of a new archive and research facility in Cornwall. Designed by Purcell, the landmark development comprises public search, exhibition, education and workshop spaces. Based on historic records, many of the original buildings’ remaining structures were restored. For the floor, the original granite flagstones were lifted and re-laid, installed alongside Junckers’ solid 185mm wide Oak Boulevard flooring in a white-pigmented Nordic finish. Junckers 20.5mm thick solid wood floor can be sanded and refinished up to ten times. A long lifespan, PEFC + FSC certified and produced in a CO2 positive facility, means specifying a Junckers floor is an environmentally sound option. The flooring contractor was Tre Concepts. 
Sponsored
Harrow One, Harrow

Harrow One, Harrow

RYNO

Harrow One is a new apartment complex which includes 119 apartments across two buildings, with shared community space for residents. Each of these new homes boasts a private paved balcony with views out over local woodland and the London skyline.System UsedTerraSmart® Pedestal was used across each of the balconies.Comprised of Quadro porcelain paving tiles in the shade ‘Crema’ and RP-FR adjustable steel paving support pedestals, the complete system achieves a European Classification (Euroclass) A1 and A1fl fire rating.VersatilityThe system is quick and simple to install: RP-FR pedestals are height adjustable to easily accommodate any slight variances in the build-up and porcelain which is simply lifted into place thereafter.  
Sponsored
Aris House, Lymington Road

Aris House, Lymington Road

Cellecta Ltd

Aris House is a brand-new four-story building accommodating 15 one and two bedroom apartments, a passenger lift to all floors, and allocated parking spaces. A specification of 163m² was authorised to this development located in a landmark position on the bustling Highcliffe High Street.Cellecta’s insuBEAM was specified by ARC Architecture Ltd due to its weight saving and quick installation benefits. The system low emissivity foil faced insulation blocks are manufactured to the highest possible specification helping achieve the required U-Value. insuBEAM systems are fully supplied in plot specific quantities reducing waste and transport to site. The system is 42% less CO2 compared to a traditional beam and block system without the transport emissions being included.CBS BUILD was awarded the contract to erect this new development.
Sponsored
Schwimmbad Berlin

Schwimmbad Berlin

Wedi Systems (UK) Ltd

Projects Information: Type: Public Swimming Pool Room: Shower area for women/men, shower Location: Berlin Kaulsdorf Construction company: Heidrich Fliesen, Zernitz-Lohm Project Description: 50m pool Non-swimmer pool with slide 2 sauna cubicles 95°C, steam bath, samarium 4 water wheelchairs, no lift, but flat, rounded Disabled parking spaces Products/Systems used: wedi Building Boards in different thicknesses wedi 610 Adhesive and Sealing Material wedi Tools Reinforcement Tape Special production (8 units each) with Fundo Requirements: Very short assembly times on site Support from AD + AWT in setup/instruction Very short drying times Water-tight material Quick processing
Sponsored
CPS Homes - Corner House, Cardiff

CPS Homes - Corner House, Cardiff

The Safety Letterbox Company

THE PROJECTWe love working with innovative and progressive developers and architects on projects that think outside the box, and Corner House, Cardiff is no exception.Developers Quin & Co Ltd have produced yet another exciting development. Situated on the corner of Woodville Road and Crwys Road is Corner House – a brand-new block of student apartments managed by agents CPS Homes. The building boasts a designer finish, offering stylish and open-plan living.Situated within close proximity to all of Cardiff`s universities, the building comes with a secure video entry system to each flat, lift access to each of the six floors, 24-hour CCTV, a communal garden area, storage for bicycles and of course a multi coloured bank of Safety Letterbox COM 2 mailboxes powder coated in a choice of RAL colours to suit the décor!
Sponsored
Perry Barr Railway Station, Birmingham

Perry Barr Railway Station, Birmingham

Genesis Global Systems Limited

Perry Barr Train Station has been refurbished for theupcoming Commonwealth Games, which are beingheld in Birmingham.The Pathway Guidance System has been specifiedto help blind and partially sighted people aroundthe train station.The traditional 6mm diameter shank method or 3Madhered versions offer an incredibly versatile systemthat can provide an instant DDA and Equality Act 2010compliant tactile surface to any platform edge, stairwayor ramp due to their unique installation methods.This allows full utilisation of all facilities, with guidesdirecting to important points i.e., ticket offices andlifts to platforms.The once small, plain and dated site is now anexpanded rust coloured building with a modern finish.Installed by Luke Boorer, Richard Howells, RossNiedzielski, Oli Wilkins, Mark Lawrence, and Will Dollingfrom the Genesis Global Systems team.
Sponsored
Hale Wharf, London

Hale Wharf, London

Kawneer UK Ltd

Kawneer played its part in the impressive Hale Wharf regeneration project by supplying our AA®100 Curtain Wall System, known for its excellent thermal performance and flexibility of design choice. The system features on both the ground floor retail and communal entrances of the 21-Storey (Block A) and 15-Storey (Block B) Buildings. It also features our AA®190 TB Doors on Block B that excel in high-traffic environments due to its robust and welded construction. The one and two-bedroom apartments are also fitted with Kawneer’s AA®720 Casement and AA®720 Tilturn Windows and AA®3572 Lift/Slide Doors, giving residents access to their balconies and the far-reaching city views which help set this exceptional development apart.
Sponsored
The Lincoln, Manchester

The Lincoln, Manchester

Meesons A I Ltd

The Lincoln, in Manchester, sits in the heart of Manchester’s Central Business District. With six storeys consisting of 102,000 sq ft of office space, the new building aimed for Grade A status.Achieving an excellent BREEAM rating, The Lincoln opened its doors to tenants in the summer of 2021.ChallengeThe client had a specific requirement to create a secure line connecting the lift lobby to the main building. The purpose of this line was to allow the staff at the reception to have remote control over it. The client was very particular about the design of the speed gates, as they needed to complement the luxurious look of The Lincoln. The gates had to be aesthetically pleasing and blend in seamlessly with the overall design of the building. The client wanted to ensure that the gates would provide security and enhance the guests’ overall experience.To find out more please follow the linkThe Lincoln Manchester - Case Studies - Meesons
Sponsored
Grymes Dyke Court

Grymes Dyke Court

JELD WEN UK LTD

Grymes Dyke Court is located in Rogation Close, Stanway. There are 20 one-bedroom and 14 two-bedroom self-contained modern apartments located in a two storey building with two lifts. Set in attractive gardens with a courtyard patio and seating area, a drying area, mobility scooter storage and a small number of parking spaces nearby for residents and visitors.Project Address - Grymes Dyke Court, Rogation Close, Stanway.Client - Colchester Borough HomesCustomer (Subcontractor) - Harmony FireStatus - CompleteJELD-WEN was pleased to work with Harmony Fire to supply the Flat Entrance Doorsets for this scheme: Made to measure SecureFIT Flat Entrance Doorsets in a contemporary, moulded 2-panel smooth Cambridge design. All the doorsets suppliers are fire-rated and security compliant for added tenant peace of mind. The doors were supplied in a range of colours with suited cylinders.
Sponsored
The Gresham Aparthotel, Leicester

The Gresham Aparthotel, Leicester

Cellecta Ltd

The Gresham Aparthotel is a luxurious refurbishment of the old Fenwicks Store into 121 one and two bed apartments and studios, spread over four floors. There is also a rooftop bar and a gym featured in the hotel. Rooms can be accessed via a lift or via the staircase - which is the original staircase and includes all the original handrails and balustrades. The iconic building was created in the 1800s by local architect Isaac Barradale for Joseph Johnsons, a local draper. In 1962, it was taken over by retailer Fenwick, which occupied the site until its closure in March 2017.Cellecta’s ScreedBoard 28 was specified by RG+P Architects due to its unrivalled acoustic performance and its installation convenience due to interlocking edges. ScreedBoard 28 is frequently viewed as the solution of choice for new build and refurbishment developments.Cube Construction was awarded this 2,000m² contract to construct this refurbishment in Leicester.
Sponsored
The Smith, Kingston Upon-Thame

The Smith, Kingston Upon-Thame

Meesons A I Ltd

In 2021, The Smith, a real estate development located in Kingston-Upon-Thames, was completed. With 40,000sq ft of Grade A office space, the development offers a mixture of lease types including co-working spaces, serviced offices, and managed space. The building promotes wellbeing with private and communal outdoor spaces to encourage you to get fresh air alongside an indoor break-out space to wind down in.ChallengeThe client had concerns about access into The Smith’s reception area before staff and visitors reach the lift lobby. However, with limited space, the solution had to fit into restricted area without compromising on the modern interior within the reception. In addition to this, it was also important to the client that the solution provided would help the building to maintain it’s enhanced energy conservation provisions.To find out more please follow the link. The Smith - Case Studies - Meesons
Sponsored
Office complex in the heart of Windsor

Office complex in the heart of Windsor

Schueco UK Ltd

The extension and refurbishment of these offices needed high-quality systems befitting their prestigious location adjacent to Windsor Castle and the listed Eton Central Station.The Windsor Dials complex comprises two buildings, Windsor One and Two. Building one had a double-height entrance installed and a two-storey glazed extension added to the roof. A double-height entrance was also created in building two with a single-storey extension to the roof. The glazed extensions provide the offices with views of Windsor Castle and the surrounding area.Hale Architects designed the project with Corley Woolley as the main contractor. Anglian Architectural fabricated and installed the building envelope. It features Schüco FSW 60 and FWS 50 S curtain walling, providing the contemporary aesthetic the client requested. The project also used Schüco door systems, including the ADS 65 HD and ASE 60 lift-and-slide doors.

Showing 181-216 of 283

Feedback