OVERVIEW
Built in 1900, London’s Bank Station provides access to the Central, Northern, DLR, Waterloo and City lines and is one of the world’s most complicated subterranean stations.
The expansive Bank Station Capacity Upgrade (BSCU) programme, commissioned by London Underground, will increase capacity by 40 per cent. In addition, it will improve access, decrease crowding and generally deliver a modern public transport facility with better ambience.
Whilst the BSCU scheme as a whole incorporated a wide range of elements – new entrance, three ticket halls, six lifts, 10 platforms, two 94m travelators and a 570m tunnel & platform for Northern Line – Sika’s involvement was on the whole block site.
SikaFuko® - Injection hose
Sika® WT-200 P
Sika® Watertight Concrete Powder - Water Resisting Concrete Admixture
SikaProof® A
Sikalastic®-8800 - Liquid applied polyurea membrane
Sika® Drain-850 Geo - Protection Board
Twickenham Stadium Resin Flooring
THE CUNARD BUILDING
Merry Hill Retail Complex Car Parks
Christ Church URC, Chelmsford
Drumhierny Woodland Holiday Lodges
The Moorings, Wales
Whitethorn Village Apartments
Wood Wharf B2, Canary Wharf
One City Park
Waterproofing Retaining Basements on a Sloping Site
The Schwarzman Centre
Fulwith Mill
UltraFloor makes country park renovation a walk in the park
UltraFloor is just what the doctor ordered at Warrington Emergency Department
Basement Extension to a Grade 2 Listed Building, London