NBS Source
I'm a manufacturer

"flooring reinforcements toppings"

8,475 results found

Sort by:

Showing 865-900 of 955

Sponsored
Lush Store - Ottawa, Canada

Lush Store - Ottawa, Canada

Ardex UK Ltd – High Performance Flooring, Tiling, Screeding and Building Products

Lush sees PanDOMO® as the perfect option for feature walls in their retail locations. It offers rapid installation and provides a unique finish that can be colour matched to their different concepts.
Sponsored
Sydney Opera House - Australia

Sydney Opera House - Australia

Ardex UK Ltd – High Performance Flooring, Tiling, Screeding and Building Products

Australia’s busiest cultural precinct relied on 12,000m2 of ARDEX waterproofing products to offer protection against the enduring threat of moisture.
Sponsored
Royal Albert Hall - London

Royal Albert Hall - London

Ardex UK Ltd – High Performance Flooring, Tiling, Screeding and Building Products

400m2 of ARDITEX NA provided the perfect levelling and smoothing solution for one of the most treasured and distinctive buildings in the UK.
Sponsored
Victoria and Albert Museum - London

Victoria and Albert Museum - London

Ardex UK Ltd – High Performance Flooring, Tiling, Screeding and Building Products

Thousands of original English Heritage wooden blocks had to be removed, resurfaced and re-laid using a complete system of ARDEX Fast Track products under the strictest guidelines.
Sponsored
Savoy Hotel Restoration Project

Savoy Hotel Restoration Project

Ardex UK Ltd – High Performance Flooring, Tiling, Screeding and Building Products

“ARDEX have developed a range of tile fixing products that exceed expectations, and enabled us to maintain our reputation for excellence. We were delighted with the results at The Savoy”. Rafi Mimoni, MD Mega Marble
Sponsored
St.David's Shopping Centre - Cardiff

St.David's Shopping Centre - Cardiff

Ardex UK Ltd – High Performance Flooring, Tiling, Screeding and Building Products

8,000m2 of limestone tiling was fixed using ARDEX X 7001 W Tile Adhesive with Rapidry Formula  Technology. The luxury tiles were grouted in just two hours, providing the perfect finish to the £675m modernisation of the shopping centre.
Sponsored
King's Cross Railway Station

King's Cross Railway Station

Ardex UK Ltd – High Performance Flooring, Tiling, Screeding and Building Products

4,300m2 of screeding, tiling and grouting was installed in the new state-of-the-art ticket hall. Taking advantage of ARDEX’s unique RAPIDRY FORMULA Technology, ARDEX A 35 Screed Cement was laid to 85mm and was ready for tiling in just 24 hours.
Sponsored
Selfridges Food Hall - London

Selfridges Food Hall - London

Ardex UK Ltd – High Performance Flooring, Tiling, Screeding and Building Products

Over 200 million visitors visit Selfridges every year. So when the iconic food hall needed renovating, only ARDEX products could achieve the speed and reliability needed for this high footfall environment which had to be ready for the public every morning.
Sponsored
North Manchester General Hospital

North Manchester General Hospital

Ardex UK Ltd – High Performance Flooring, Tiling, Screeding and Building Products

Demanding environments require a proven system. This 1800m2 Accident and Emergency department was  refurbished with cost-effective, fast track products from ARDEX, to the total satisfaction of the client.
Sponsored
DAVID LLOYD LEISURE CLUB

DAVID LLOYD LEISURE CLUB

Ardex UK Ltd – High Performance Flooring, Tiling, Screeding and Building Products

As part of a £50million group investment, the prestigious Colchester club needed 3,500m2 of tiling to cover the swimming pools, changing rooms, walkways and reception areas. Products used: ARDEX A 38, ARDEX E 100, ARDEX S 7, ARDEX WPC, ARDEX X 77, ARDEX X 78, ARDEX X 7, ARDEX-FLEX FS, ARDEX-FLEX FL, ARDEX WA
Sponsored
HOTEL & LEISURE - THE HEXAGON - STAIR NOSINGS

HOTEL & LEISURE - THE HEXAGON - STAIR NOSINGS

Quantum Flooring Solutions, a trading name of Quantum Profile Systems Ltd

Challenge The Hexagon is a well established multi purpose venue, in the heart of Reading that was built in 1977. As well as drama productions, it hosts a range of events such as Dance, Comedy, Classical Music, Rock and Pop concerts. The venue can hold up to 1600 people, with much of the capacity arranged in levels of banked arena-style seating with stepped access.
Sponsored
HOTEL AND LEISURE - THE HEXAGON - STAIR NOSINGS

HOTEL AND LEISURE - THE HEXAGON - STAIR NOSINGS

Quantum Flooring Solutions, a trading name of Quantum Profile Systems Ltd

Challenge The Hexagon is a well established multi purpose venue, in the heart of Reading that was built in 1977. As well as drama productions, it hosts a range of events such as Dance, Comedy, Classical Music, Rock and Pop concerts. The venue can hold up to 1600 people, with much of the capacity arranged in levels of banked arena-style seating with stepped access. The nature of the performances at the venue mean access up and down these stairways by patrons is often in low light levels which means there is a risk of slips and falls.
Sponsored
Terra-34 Architectural Grating used as facade for new extension at Donegal Garda Station

Terra-34 Architectural Grating used as facade for new extension at Donegal Garda Station

Lang+Fulton

The new extension for the Donegal Garda is a prominent feature utilising materials that respond to its topology and enhance the building’s civic presence in the town. The dark coloured brick plinth of the semi-basement grounds the building while the upper floors which feature a facade of open mesh grating provide an open and transparent interface with the public whilst maintaining necessary security provisions.Lang+Fulton supplied the bespoke steel mesh cladding for the glazed upper floors of the facade. The grating achieves a contemporary aesthetic and delivers the practical advantages of protection and a brise-soleil solution, while achieving a transparency that offers the public an insight into the activities of the station; the degree of transparency and solar shading creating an interesting variety, dependent on the angle of view, the time of day and light conditions.The Terra-34 grating, which features an anti-climb aperture, was also used to create walkways, soffits and a secure enclosure around the roof-top plant. The gratings were made to 19 different custom-sizes and shapes for each floor with 3038mm high panels for the facade cladding. Slotted tabs were designed for fixing to the support steelwork. The material was supplied in a hot-dip galvanized finish to withstand the coastal environment.Donegal Town Garda Station has won 4 national awards including Best Cultural/Public Building (RIAI). Adjudicators said that, “The project stands out for its laconic civic presence and its no-nonsense adaptation of the spatial culture of a thriving historic town … the building demonstrates that thoughtful architecture can quietly and carefully edify our everyday culture”.
Sponsored
Fruit & Veg Case Study

Fruit & Veg Case Study

Deceuninck Ltd

Products: • Deceuninck 2800 Series • Top Hung • Anthracite Grey 7016 on White PVC
Sponsored
School redevelopment project, Sussex

School redevelopment project, Sussex

Redlynch Leisure Installations Ltd

We were delighted to be commissioned to provide a complete playground regeneration project, for a prestigious school in Sussex. The current play facilities were starting to feel dates, and the school wanted some fresh, colourful and natural themed equipment and surfacing to reenergise the areas.3 different areas on the site catered to various age groups, and the level of challenge on the equipment reflected this. A mixture of climbing, trim trails, multiplays, a zip wire, and some tall slides will make playtimes fun for many years to come. Equally, the safety surfacing was designed to be colourful and informative, with inlaid graphics featuring windmills and electric charging points on the track helping reinforce the importance of a low carbon future.
Sponsored
St Paul's Cathedral

St Paul's Cathedral

Albion Stone plc

St Paul's Cathedral is Sir Christopher Wren's masterpiece, built in glowing Portland Stone, crowned by the magnificent dome, a famous landmark on the skyline of the City of London.This programme saw St Paul’s repaired and cleaned inside and out, with greatly improved provision for those with disabilities and an enhanced visitor experience through the provision of new exhibition and interpretation galleries.Here at Albion Stone we regularly supply Portland stone to the Masons at St Paul’s Cathedral for maintenance and repairs. We supplied Portland Jordans Basebed and Whitbed for the South Churchyard Improvements. The stone has been used to create seating areas that reinforce the other side of the medieval cloister walk.
Sponsored
Doddington Housing

Doddington Housing

Forterra Building Products

13 new dwellings situated in the small village of Doddington, Lincolnshire are providing much-needed affordable housing for people working at nearby Doddington Hall.Located on Main Street, the development enhances this area of the village, providing important infill on the site once occupied by the local school, which was demolished in the 1960s and has latterly been used as a car park and general storage area. It is bordered by a mix of farmland, mature trees and shrubs, and existing housing, and lies partially within a conservation area.The development comprises two 2-bedroomed, five 3-bedroomed and six 4-bedroomed terraced and semi-detached dwellings. One of the terraces fronts onto Main Street while the remainder have been sensitively designed to create an attractive group of dwellings centred around a newly-created ‘village green’.Perhaps the most significant element of the appearance of the scheme is the elevation of the terraces towards Main Street. In developing the specifically tailored to design for this elevation, account was taken of the nature of the surrounding buildings within the village.Although not prominent to public view, the balance of the development has been designed in a manner sympathetic to the architectural vernacular found within the village. With a common thread running-through which will serve to unify the development and reinforce the sense-of-place which is presented by the scheme.In particular, simple, uncomplicated/uncluttered designs have been developed. High quality materials have been utilised for the development, essential in reinforcing the architectural character of the development, reflecting the high-quality of other developments which have been executed within the village recently.The brick selected was Forterra’s Butterley Breckland Multi Reserve, a red brick with a tumbled texture.
Sponsored
Keswick Convention Centre, Keswick Ministries organization

Keswick Convention Centre, Keswick Ministries organization

Sto Ltd

An historic landmark in the Lake District has been given a new lease of life with the installation of StoTherm Mineral K external wall insulation and StoSilco finishing render. Built in 1937, the building in Keswick originally housed the UK’s first pencil factory, and now provides new headquarters and site for the Keswick Convention for the Keswick Ministries organization. After being used by the Cumberland Pencil Company the building had fallen into disrepair. Set at the entrance to Keswick, this important local landmark has now embarked on a £10.5m redevelopment project, split into four phases. The Sto materials have been used on the first phase which has seen the building’s front elevation fully restored, and they have also been specified for the remaining three stages of the work.The BBA-certified StoTherm Mineral K system combines impressive insulation with unrivalled fire protection characteristics. It features Sto-Mineral Fibre thermal insulation boards, which in this case were fixed to the substrate using StoLevell Duo Plus mineral bonding and reinforcing mortar.  “This allows any unevenness in the surface of the substrate to be accommodated and makes installation a fast and easy process,” comments Alan Rees of Eco Rend North East who installed the Sto system. This efficient single-leaf construction allows for excellent thermal performance without reducing the interior space, and as it requires no additional expansion joints, a smooth and unbroken exterior surface can be created.  An additional mineralic reinforcing coat was applied and the exterior surface was finished with StoSilco silicone resin render.  With high CO2 and water-vapour permeability, StoSilco render allows a weather- and water-repellant outer surface to be created in any of the 1,000+ colours available in the StoColor System.  
Sponsored
Altro Wood adhesive-free - Moline Village, Australia

Altro Wood adhesive-free - Moline Village, Australia

Altro

Altro delivers a speedy upgrade to luxury care homeIssueAmana Living is a premium care service provider based in in Australia, who pride themselves on making the welfare of their residents a priority. When the community lounge at Amana Living’s Moline Village needed an upgrade, they knew they needed a speedy solution that would cause minimal disturbance to their residents and offer a superior quality finish.ApproachThe existing vinyl floor was in need of an update, and Amana Living needed a flooring product which would allow them to complete the renovation quickly, with minimal noise, dust, and unpleasant odours but would also look great, and perform even better.SolutionAmana Living chose Altro Wood adhesive-free for their refurbishment. The adhesive-free installation meant that not only were there no adhesive smells, but that the new flooring could be laid directly over the top of the old. This saved valuable time and significantly reduced the amount of dust involved in the project. The time savings that Amana Living made by using adhesive-free flooring meant that they were able to open up the lounge to their residents more quickly than originally planned. The benefits don’t end at the installation either: in their new community lounge, both staff and residents enjoy a relaxing environment with comfort underfoot and 14dB sound reduction. And with the inclusion of Altro Easyclean Technology, the lounge is also much easier to maintain.Altro Wood adhesive-free creates maximum impact with minimum downtime. With 12 colour choices, 14dB sound reduction, a 10-year guarantee and our Altro one in a million slip-resistance reassurance, Altro Wood adhesive-free offers high levels of comfort underfoot providing a safe, durable and decorative solution for busy spaces."The installation was completed in a very timely manner with no take-up of existing flooring, and no dust or adhesive odours causing discomfort to anyone in the facility, all being completed with minimal disruptions." Amana Living"Everyone is delighted with the completed flooring which now delivers great safety underfoot, ease of cleaning and a fantastic looking renovation completed in record time." Amana Living
Sponsored
Little Corkhill Farm - F. Ball enables quick getaway

Little Corkhill Farm - F. Ball enables quick getaway

Ball, F and Co Ltd

F. Ball and Co. Ltd.’s newest high-performance water-mix smoothing underlayment, Stopgap 1500 AquaPro, and Styccobond F48 PLUS temperature tolerant fibre-reinforced adhesive have enabled a fast-track LVT installation as part of barn conversions to create three holiday cottages in rural Nottinghamshire.Flooring contractors installed floorcoverings in bedrooms, open-plan living and dining areas and corridors of three previously disused farm buildings of varying size, a total area of over 200m2.Work began by sanding down the new concrete bases, which had been installed as part of the renovation of the properties, by mechanically preparing them, removing any laitance, contamination, dust and debris, to leave a solid, sound, micro textured surface to receive floor preparation products.A moisture test was undertaken by one of F. Ball’s technical representatives to ensure that the building’s subfloors were dry enough to receive floorcoverings. Surfaces were then primed using Stopgap P131 general-purpose primer to promote the application characteristics of subsequently applied subfloor preparation products.Stopgap 1500 AquaPro was applied to create a perfectly smooth base for floorcoverings. Fast-setting and fast-drying, it is walk-on hard in as little as 60 minutes after application and ready to receive floorcoverings from just four hours. The product uses the latest technology to offer a water-mix smoothing underlayment that can be applied over old adhesive residues, including bitumen, carpet tile tackifiers and ceramic tile adhesives. As it is moisture resistant, it can be applied to damp subfloors prior to the application of a waterproof surface membrane.Flooring contractors then used Styccobond F48 PLUS to adhere 7-inch wood-effect vinyl planks in each of the three cottages. The temperature tolerant adhesive holds floorcoverings in place when subject to high temperatures, which may be an issue as a result of solar gain caused by large patio doors. This can cause tenting and gapping at the edges of vinyl floorcoverings as a result of repeated expansion and contraction over time. Fibres in the adhesive also provide high initial grab, a benefit when installing LVTs.Commenting on the project, Anthony Holmewood, fitter at Forester Flooring, said: “Using Stopgap 1500 AquaPro meant that we could complete the work in less than a week. We opted for Styccobond F48 PLUS to install LVTs mainly because we like the adhesive, but also for the reason that floorcoverings are exposed to direct sunlight in some areas.”
Sponsored
ASF Swansea PGR, Swansea

ASF Swansea PGR, Swansea

Architectural Street Furnishings part of WB White Foundry

ASF Manufactured these stunning stainless steel pedestrian guardrails for the Princess Street area of Swansea.Posts manufactured from the ASF 5008 Bollard offer a 114mm diameter upright with a solid machined top. The upright has a satin finish whilst the top is left as machine finished which gives a bright polished look.Panels are from stainless steel tube and uprights from solid stainless steel bar, making this product look great but also be low maintenance, robust and long lasting.
Sponsored
JACKOBOARD® is the “ideal” companion for underfloor heating

JACKOBOARD® is the “ideal” companion for underfloor heating

BEWI UK Construction

The JACKOBOARD range from BEWI is “ideal” for use as a tile backerboard on projects where increasingly popular underfloor heating systems are being installed, the company says.Made from extruded polystyrene foam (XPS), the construction boards are said to be inherently waterproof because the structure of the board does not allow water to penetrate. They are designed to be easy to work with and cut, as well as truly lightweight.They are finished on both sides with a special coating and reinforced fibreglass mesh, ready to be tiled, rendered or plastered. The boards are said to possess excellent thermal insulation properties, which give them enormous advantages over plasterboard or cement board. They are especially suitable for interior construction, the company says, especially in rooms subject to high moisture levels.According to BEWI, JACKOBOARD goes “beyond bathrooms” and can be used in any room of the house and as a backerboard for virtually any tiling project.The boards are suitable for quickly and effectively levelling uneven walls and floors, for partition walls, compensating for cracks in substrates and for creating substrates for laying tiles on non-adhesive surfaces.JACKOBOARD is also said to provide the best waterproof, insulated, tiling substrate for underfloor heating projects. Whether electric mats or hot water systems are being installed, BEWI says, JACKOBOARD – laid underneath the heating elements or pipework – will help to decrease warm-up times of the system by pushing the heat directly up to the tile layer. In this way, the heat generated by the system is used in the most efficient way, not just during the initial heat-up stage, but in general usage with the continued thermostat-controlled use of the heating system.As builders are forced to reduce the carbon footprint of their projects, the materials they choose to build with can provide a key to unlocking the thermal performance of a building. The XPS foam used on JACKOBOARD products reportedly achieves excellent insulation properties. It’s designed to help maximise the energy efficiency of walls and floors, improving the overall thermal performance of any property.www.bewi.com
Sponsored
Fulham Jetty

Fulham Jetty

Bauder Ltd

Fulham JettyBauder Bakor 790-11 hot melt structural system with Bauderflex waterproofing system and BauderGREEN sedum systemSynopsisFulham Wharf is a landmark regeneration scheme that began in 2013 and included the ecological enhancement of an abandoned jetty on the River Thames. This redevelopment was designed to provide the local community with an ecological education centre and bio-diverse wildlife reserve.Bauder Building BoardProject:Fulham JettyLocation:LondonRoof Area:1,000m²Specifier:FabrikApproved Contractor:Accurate RoofingProject challenges One of the major challenges for this roof was installing the central sloped section, which required exceptional levels of technical input and workmanship. This roofing area was waterproofed with the same bituminous green roof system as the upper roof; however a special timber design for retaining the substrate and sedum blanket was also needed. Since its official opening in October 2013, the lower wildflower roof has become a haven for a variety of different birds and insects.The resultThe building’s new roof swoops down to become a continuum with the jetty deck and is covered with a green habitat providing three distinct environments for wildlife; one on the flat roof, one on the slope and the third on the jetty deck. The education centre roof was waterproofed with Bauder’s root resistant bitumen membrane before then having a sedum blanket fitted. On the lower roof, 650m² of Bauder’s hot melt structural waterproofing was installed along with a wildflower blanket, providing an instant carpet of vegetation. Systems installedBauderflex bituminous waterproofing system1 BauderPLANT E 42A torch applied, SBS elastomeric bitumen capping sheet. The product features chemically treated bitumen to deliver superior root resistance which has been tested and approved by the FLL. The membrane is reinforced with 250g/m² spunbond polyester fleece to allow the finished product to cope with structural movement without fracture.2 BauderTEC SPRINT DUOSelf-adhesive bitumen underlayer with “DUO” lap technology to ensure thorough sealing of lap joints, even in lower temperatures. The product features a glass fleece reinforcement for strength and stability. The product benefits from cleaner, safer, and faster installation than traditional torch-applied membranes.3 BauderPIR FA-TELightweight, PIR flatboard insulation board with aluminium foil facing on both sides. This product has zero ozone depletion potential.4 BauderTEC KSD FBSSelf-adhesive air and vapour control layer with a mica finished upper surface to allow easy bonding of insulation using the specified Bauder Insulation AdhesiveBauder Bakor 790-11 hot melt waterproofing system1 BauderPLANT E 42Torch-on root-resistant, green capping sheet. Reinforced with spunbond polyester fleece to allow the finished product to cope with structural movement without fracture.2 790-11 with reinforcement layerHot melt rubberised bitumen asphalt with a percentage of post-consumer recycled materials that infills and fully bonds to all minor deviations in the deck.3 DeckPrimed concrete.Bauder XF 301 Sedum system1 BauderGREEN XF 301Sedum vegetation blanket instantly providing at least 90% coverage on an extensive green roof. Integrated water retention and filter layer.2 BauderGREEN AL 4040mm high perforated edge/drainage trim frames and retains the Bauder XF 301 sedum system.3 BauderGREEN SDFMulti-functional drainage and filtration layer which prevents the roots of sedum plants from becoming waterlogged.4 BauderPLANT ETorch-on root-resistant capping sheet green
Sponsored
City of London Academy, The Britannia Project, Shoreditch Park

City of London Academy, The Britannia Project, Shoreditch Park

Junckers Ltd

City of London Academy Shoreditch Park by Feilden Clegg Bradley Studios forms a part of The Britannia Project, regenerating a thriving London community with new facilities and amenities including new housing, a new school and community leisure facilities. Built to cater for the anticipated expanding population, the new development forms a harmonious addition to the existing neighbourhood with new, high-quality public spaces. The new secondary school for 900 local students plus a 200 student sixth form school had complex underground constraints to take into consideration in the design process, a challenge which informed every part of the building, including the choice of flooring and its installation in the school sports hall. Proposed Crossrail tunnels beneath the building meant the sports floor had to be able to cope with a much larger amount of structural movement than what would be considered normal for a building of this kind. Junckers’ technical department worked closely with the architect exploring a number of options to finally help them arrive at a solution which could accommodate an unusually large amount of structural movement and at the same time retain the sprung quality of the floor for sports and other activities. Junckers Approved Contractor V.A. Hutchison fitted Junckers 22mm solid Ash Champion over New Era battens with 125mm insulation between battens. Line markings for four badminton courts as well as basketball, netball and handball courts ensure the sports hall will serve the school and the wider community as a hub for multiple events and activities. The floor is area elastic and fully complies with EN 14904 class A4, a high-performance sprung floor which will serve the school and community for decades to come. A 22mm Junckers sports floor can be sanded and refinished up to ten times without losing performance, and with regular sandings in 12-year intervals, a lifespan of 60+ years as set out by the RIBA 2030 Climate Challenge can easily be achieved. Funding for schools issued by the Department for Education is now dependent on fulfilling strict sustainability criteria. Junckers has independently verified certification to show its flooring fulfils these criteria, In addition to the sports hall, Junckers flooring was specified for the school’s main hall, which is used for drama and other activities. The original specification was for a vinyl floor, but as a more sustainable solution, Junckers’ 22mm Nordic Oak in the Classic grade was selected. V. A. Hutchison Flooring installed the oak floor on New Era battens with 125mm insulation, including an area of 91 m2 of extra battens for support in the main hall. Jo Gimenenz, Architect at FCBStudios added: “We have worked with Junckers for many of our projects, CoLASP being one of the most recent and they always provide an excellent technical service. Particularly so on this project where we had to overcome a complex structural movement joint detail in our ground floor Main Hall, due to proposed Crossrail tunnels beneath the building. A Junckers flooring system was also installed in our Sports Hall. For this space we opted again for a solid timber flooring in lieu of a vinyl topped raised floor as it was a more sustainable solution.” 
Sponsored
Kameha Grand Hotel

Kameha Grand Hotel

Schöck Ltd

Winner of the MIPM 2010 award for Hotels and Tourism, which is presented for outstanding real state projects worldwide, the Kameha Grand was designed by architect Karl-Heinz Schommer Bonner. The unique elliptical section design did however make serious demands on the requirement for protection against thermal bridging. The architect discussed the issue with Schöck, the European specialists in thermal bridging solutions and it was agreed that a combination of three product variants would meet the requirement.The outer concrete arches on the roof and facade of the building cantilever 1.30 m on each side and this, combined with the subtle design of the facade, meant that it was not possible to use a standard thermal break solution. To minimise any thermal bridging problems along the two outer arcs an inventive solution had to be found by the Schöck design team. This was achieved by dividing the projecting element of the framework into a number of sections and using the appropriate Isokorb® T for the required forces. At the ground floor Isokorb® T type Q is used, with T type D being installed higher up the structure, followed by T type K on the top floor. Because of the arch profile, the Isokorb® T type D was cut and installed at 90 degrees and run under the curved edge of the roof emergency exits, providing F90 fire protection.
Sponsored
Hospital Workstation Given New Lease of Life with Yeoman Shield

Hospital Workstation Given New Lease of Life with Yeoman Shield

Yeoman Shield, trading name of Harrison Thompson & Co Ltd

Ward Firth 9 at The Northern General Hospital underwent a complete refurbishment as part of an essential maintenance project recently which included redecoration and new flooring as well as the installation of Yeoman Shield Wall Protection Panels and Guardian Handrail.After the work was completed the ward lookedsmart and refreshed which left the originalNurses Station lack lustre, as pictured to the left.Yeoman Shield were able to offer a solution to theworn work-unit with the application, to the sidesof the desk, of 2.0mm thick FalmouthEx protectionpanels in light grey to match the surrounding décor.The tops of the work stations were covered withYeoman Shield Satin Pastel Smooth panels in thecolour Clay.Not only did the covering of the nurse’s stationwith Yeoman Shield products reflect the newsmart décor of the wards but also gave them anextra lease of life with a durable impact resistantand easy to clean hygienic finish.
Sponsored
Shard Place Riser Install, London

Shard Place Riser Install, London

Dura Composites Ltd

Dura Grating Riser Installation | Case StudyShard Place is the third phase of the £3.5 billion redevelopment of the estate next to London Bridge station, known as Shard Quarter. Reinforced concrete frame and groundwork specialists Getjar were appointed as the formwork contractor by the principal contractor Mace and chose the Dura Composites Riser Install team to take on some of the complex install challenges of the service risers.Dura’s unrivalled expertise and full install capabilities meant they could deliver a bespoke solution for a large triangular shaped riser on all 26 storeys that required the use of galvanized steel supports and bracketing in conjunction with GRP Dura Grating to allow for cutouts to be performed whilst maintaining the integrity of the riser.
Sponsored
Blackhorse Lane

Blackhorse Lane

Langley Waterproofing Systems Ltd

The purpose:Taylor Wimpey’s Eclipse development was the final phase of the large-scale modernisation and renewal strategy for the London Borough of Walthamstow Forest, known as The Blackhorse Lane Action Plan. Eclipse would offer affordable social and private housing via 500 homes in two six-storey apartment blocks.To help satisfy one of the Plan’s objectives- “to ensure new developments incorporate the highest levels of sustainable design and their impact on climate change is minimised”- we installed green roofs on both blocks. As it was the final development phase, space was limited; time was also an influencing factor in facilitating the tight build programme,avoiding delays, and enabling the client to deliver much-needed new homes.Our solutionTo enable fulfilment of the brief, we recommended our HM-40 Paratech Hot Melt Roofing System as the inverted waterproofing base for the green roof. A fully-bonded system, HM-40 is a robust, durable, and highly flexible monolithic, self-healing hot-melt waterproofing system for protected roofs, green roofs, terraces, and podium decks with a 40-year durability statement. In addition, it is firerated for unrestricted use when covered with a green or ballast roof.Unlike other hot melt systems that use fleeces, the Paratech system incorporates a reinforcement mesh: this allows the system to be rolled out, making waterproofing installation faster, thereby enabling the contractor to lay the top roofing layer of artificial grass and landscaped green roofs. Unfortunately, an on-site compound to store the roofing components was unavailable. We worked closely with T&T Roofing and Taylor Wimpey to ensure deliveries arrived in build sequence for immediate use, but without adversely impacting residents who had already moved into their newhomes.“The features of the flat roof system provided a seamless, issue-free roof installation, with rapid installation time causing minimal disruption. Langley’s technical team was always on hand to provide assistance when necessary, working collaboratively to guarantee a consistent and highquality installation.”
Sponsored
Maldron Hotel Swimming Pool Renovation Tiles and Tanking | Precision Building Services

Maldron Hotel Swimming Pool Renovation Tiles and Tanking | Precision Building Services

SMET Building Products Ltd

Job: Maldron Hotel Swimming Pool Renovation, Portlaoise, Co. Laois.Smet Supported Partner:Precision Building Services – Mark PembertonProducts: Sopro Rapidur® B5 Rapid Drying Screed BinderMerlin Barrier CoatSopro RAM 3 (454) Renovation and Levelling MortarSopro GD 749 Universal Floor and Wall PrimerSopro DSF® 523 Tanking MembraneSopro PUK 503 PU AdhesiveSopro VF HF 420 – VarioFlex® High Strength Flexible Tile AdhesiveSopro’s No. 1 Flexible Tile AdhesiveSopro FKM® XL 444 – Extra Light Weight Tile AdhesiveSopro Sanitary SiliconeSopro DE 014/015 Sealing CornersSopro FEP 508Sopro DBF-638Racofix 818Description:SMET supplied Smet Supported Partner, Precision Building Services (Mark Pemberton), for the renovation of the Maldron Hotel Swimming Pool, Portlaoise, Co. Laois. A total area of Floor screed @ 140m² | Wall tiling @125m² | Floor tiling @ 140 m² was completed.New floor installation with fast-track – rapid drying floor screed solution, using Sopro Rapidur® B5 Rapid Drying Screed Binder, a fast-setting screed which was laid to falls prior to waterproofing and tiling providing an early completion. German-made Rapidur® B5 Rapid Drying Screed Binder is a special polymer-modified binder for particularly economical ­production of high-strength, rapid-set cement screed – based on DIN 18560.Rapidur® B5 is suitable for use on heated screeds, bonded screeds, unbonded screeds and floating screeds. This flooring solution is particularly useful for fast-track or tightly scheduled screed laying. The newly laid Rapidur® B5 screed floor is ready to receive floor covering after approx. 3 days – after achievement of moisture content ≤ 1.8 % CM. Sopro Rapidur® B5 is supplied in 25kg bags, with 40 bags per pallet.Sopro Rapidur® B5 was installed directly on top of Merlin Barrier Coat wet on wet. The screed was ready for waterproofing/tiling after 3 days. This system was also used to repair the Jacuzzi’s surrounding walls prior to waterproofing, tiling, and grouting.Sopro RAM 3 levelled the deck area (3-60mm) between the drainage channel edge and pool perimeter movement joint. Sopro RAM 3 was bonded with Sopro GD 749.
Sponsored
RUGBY MILL AND RAM MILL, MANCHESTER

RUGBY MILL AND RAM MILL, MANCHESTER

Tata Steel

Rugby Mill is a 60,181 sq ft new build warehouse. The external building envelope for this facility includes a two-storey office and dock levellers at the rear. Built using 9,000m2 of and insulated panels manufactured using and the front elevation features decorative cornice detail to the top right and top left hand corners of the building, in an agreed contrasting combination of blue colours (Solent Blue, Atlantis, Aquarius, Zeus and Sirius and Goosewing Grey).Adjacent to Rugby Mill, Ram Mill can accommodate up to 100,000 sq ft of occupiable space and has been pre-let. Built to the same design and using our and insulated panels, the front façade for this unit features our insulated panels in a different colour combination and features a decorative cornice detail that wraps around the top corners of the front elevation either side, in a green combination to reflect Pin Property’s distinctive brand (Heritage, Jade, Juniper, Sirius, Zeus and Goosewing Grey).
Sponsored
Butlins Bognor Regis Pool Complex

Butlins Bognor Regis Pool Complex

Ardex UK Ltd – High Performance Flooring, Tiling, Screeding and Building Products

Butlins has been a firm family favourite for holidaymakers since opening its first resort in 1936. At the heart of their facilities are the swimming pools, which have always been one of the biggest draws for parents and children alike. However, at over 30 years old their Bognor Regis site needed modernisation.
Sponsored
King's Cross Railway Station - London

King's Cross Railway Station - London

Ardex UK Ltd – High Performance Flooring, Tiling, Screeding and Building Products

4,300m2 of screeding, tiling and grouting was installed in the new state-of-the-art ticket hall.
Sponsored
Royal College of Surgeons Ireland (RCSI)

Royal College of Surgeons Ireland (RCSI)

Ardex UK Ltd – High Performance Flooring, Tiling, Screeding and Building Products

For over 200 years, the Royal College of Surgeons Ireland (RCSI), has played a major role in medical education and training in Ireland. Founded in 1784 to train surgeons, today the College provides extensive education and training in the healthcare professions at undergraduate and postgraduate level.
Sponsored
Piccadilly Circus Underground Station - London

Piccadilly Circus Underground Station - London

Ardex UK Ltd – High Performance Flooring, Tiling, Screeding and Building Products

Over 30 years on and still no cracking or de-bonding evident on the original tiles.
Sponsored
McDonald's Tiling Refit for UK Restaurants

McDonald's Tiling Refit for UK Restaurants

Ardex UK Ltd – High Performance Flooring, Tiling, Screeding and Building Products

A huge tiling re-fit of all UK restaurants over a 5 year program. The successful partnership approach produced the ideal  tile fixing recommendation, which is now being rolled out to McDonald’s branches around the world.
Sponsored
Gleneagles Hotel, Spa and Golf Resort

Gleneagles Hotel, Spa and Golf Resort

Ardex UK Ltd – High Performance Flooring, Tiling, Screeding and Building Products

“ARDEX helped us through each stage, from specification writing of the project to on-site visits. The support was second to none.” Paul Lovell, MD of Leisure Design Ltd

Showing 865-900 of 955

Feedback