NBS Source
I'm a manufacturer

"iae impact protection"

3,224 results found

Sort by:

Showing 613-648 of 795

Sponsored
Historic Restoration - Bok Tower, Florida (USA)

Historic Restoration - Bok Tower, Florida (USA)

C-Probe Systems

Bok Tower is a transitional steel frame construction built between 1927 and 1929 and houses a 60-bell carillon (set oftuned bells). The tower is 205 feet tall, has eleven floors with the belltowerfrom levels 8 through 11. The Gothic revival architecture has three forms of masonry that adorn the exterior: coquina brick, intricate marble detailing and sculptures clad the steel columns and decorative tile panels. It was facing structural corrosion which C-Probe Systems effectively managed using an ICCP system.
Sponsored
BioClad Complete Plastic Cladding Works on Asiri Hospital, Sri Lanka

BioClad Complete Plastic Cladding Works on Asiri Hospital, Sri Lanka

BioClad

BioClad Satin White and Pastel Mint antimicrobial systems, of which are impregnated by BioCote silver ion technology were specified by the client for internal wall linings.
Sponsored
Eastcheap, City of London – iDecking

Eastcheap, City of London – iDecking

Wallbarn Ltd

Project involved decking a 350m2 the rooftop of a commercial block in the heart of the city. The owners wanted to create a roof terrace for staff. The customer chose the iDecking complete solution for it's superior look. Installation was carried out on an inverted roof. The contractor laid down a double layer of our aluminium frame onto Wallbarn MegaPad pedestals which provide a stable footing for the framework. The composite Moor Oak boards were stamped into position. Installers were able to achieve a great finish by accurately cutting the boards to fit neatly to edges and corners.
Sponsored
Green roof on Starbucks cafe

Green roof on Starbucks cafe

Wallbarn Ltd

This project involved a brand new Starbucks drive-thru being built in West London where the customer wanted the overlooked rooftop to be green. The customer was able to give the basic dimensions to our team and describe how they wanted the roof laid out. We then calculated the exact quantity of units needed with our inhouse software and gave delivery and installation guidance to the contractor and end client. Wallbarn also supplied the materials for the semi-extensive border including geotextile fleece, drainage board and our specially-developed substrate for a comprehensive green roof solution,
Sponsored
iDecking Project - Finchampstead, Berkshire

iDecking Project - Finchampstead, Berkshire

Wallbarn Ltd

This 115m² project was a large luxury new-build. The decking required two distinct build-up methods around the house. One section was on a waterproofing membrane, the other on a steel framed walkway. Adjustable support pedestals were loose-laid onto the membrane. iDecking aluminium rail system was set onto the pedestals and EasyClick boards were clicked into place. Pedestals lifted the decking structure off the membrane allowing free drainage and creating a level surface on the falling roof. Aluminium rails were mechanically fixed to the steel structure and the whole terrace was set to one, seamless level wrapping around the house.
Sponsored
Rooftop Apartments, Gisburn Rd, Tottenham, Passive Purple

Rooftop Apartments, Gisburn Rd, Tottenham, Passive Purple

Intelligent Membranes

We all know warm roofs and joist zones are huge areas for air leakage and extremely hard to solve this problem. This warm roof structure for luxury apartments retrofit fit onto an already existing block of apartments in Tottenham was typically the icing on the cake for detail and performance. With the hand cut roof providing the client with multiple skylights, dormers and 360-degree turrets, this was going to be no easy task of getting the airtightness and vapour control secure and correct in a traditional method. Step forward Passive Purple! Rather than just covering the issues, once the hand cut roof was finished, the 220mm roof rafters were filled with a layer of spray insulation supplied by Lapolla UK. The dormers, skylights and turrets were then given some attention to detail with Passive Purple BRUSH before the final application of Passive Purple (spray applied) This gives this roof a complete airtight vapour control with performance like no other and getting around all of them circular details and angle’s galore this was just another simpler, easier way to get the job done right and guaranteed! Passive Purple liquid application saves the client and user so much time and so much less strenuous labour.
Sponsored
Morgan Stanley Building, Great Ormond Street Hospital - London

Morgan Stanley Building, Great Ormond Street Hospital - London

Johnstone's Trade Paints - a brand of PPG Industries

The Morgan Stanley Building at London’s Great Ormond Street Hospital benefitted from the high performance and durability qualities of leading paint manufacturer Johnstone’s Acrylic Durable Matt paint. The building’s hallways, stairwells, staff rooms and main cafe was painted to provide the perfect solution for combating the high levels of traffic that a hospital has to contend with. The reception area, parent sitting room and play areas, were given a splash of colour in the form of bright blues and greens, while calming colours such as soft yellows and muted duck eggs were used in the quiet zones.
Sponsored
PROMAT ULTIMA® VIP offers smarter route to ultra-thin, lightweight thermal insulation

PROMAT ULTIMA® VIP offers smarter route to ultra-thin, lightweight thermal insulation

Promat UK

The PROMAT ULTIMA® VIP range of ultra-thin vacuum insulated panels from Promat UK utilise next generation materials technology to deliver the highest levels of thermal insulation, without the bulkiness associated with traditional insulating products. With standard thicknesses of between just 10mm and 50mm, PROMAT ULTIMA® VIP panels are ideal for applications where space constraints pose a challenge to delivering on thermal goals. It is an effective insulation for a wide range of applications including structures, flat roofs and facades with the benefit of being manufactured by Promat in ISO 9001: 2015 and ISO 14001:2015 factories for consistent quality assurance and traceability.
Sponsored
The Loft Holiday Home

The Loft Holiday Home

BPD Building Product Design Ltd

With 50 years’ experience in the modular build industry, the challenge for Tingdene Homes was to deliver a cutting edge solution for a new two-storey holiday home construction which was to be built entirely offsite in a controlled factory environment, with the objective of delivering speedier construction, factory engineered quality and cost-effective design.
Sponsored
Promat SYSTEMGLAS® provides slim fire rated glazing solution for pioneering new development

Promat SYSTEMGLAS® provides slim fire rated glazing solution for pioneering new development

Promat UK

An innovative new residential property built on Passivhous principles, located on the site of a former walled garden within a classic Georgian country house estate, utilises Promat SYSTEMGLAS® Celare fire resistant glazing system from fire, thermal and acoustic solutions specialist Promat UK. With the aim of maximising natural daylight, the design incorporates a number of full height modern slim floor to ceiling windows using the SYSTEMGLAS® Celare glazing system. By choosing SYSTEMGLAS®, the architect and builder have been able to benefit from Promat UK’s ‘360 degree wheel of assurance’ for fire rated glazing systems.
Sponsored
TBA FIREFLY™ System Sub-Divides Supermarket Roofspace

TBA FIREFLY™ System Sub-Divides Supermarket Roofspace

FIREFLY™ TBA

TBA FIREFLY™ System Sub-Divides Supermarket RoofspaceDuring the recent pandemic supermarket chains have had to continue with property maintenance and improvement programmes to ensure the safety of their premises, including a store in Staffordshire where the APOLLO Lite™ 30:30 barrier, manufactured by TBA FIREFLY™, was installed within the roof-space as part of a major refurbishment project.The work at the store was carried out by sector specialist, The B Team. All of the APOLLO Lite™ 30:30, together with the heavy duty stainless steel staples and other ancillary Firefly products, have been supplied by distributor, CCF.Commenting on the success of the work, The B Team Site Manager Adi, said ”as the architects specified vertical fire barriers in the strategy according to the Approved Document B from the Building regulations, we decided to use APOLLO Lite™ 30:30 from TBA, as we have used it and other FIREFLY™ products on other project in the past: in supermarkets and other types of building. It is easy to cut and install, fixing it vertically to the metal profiles with stainless steel screws to create 20 metre by 20 metre compartments and we used the stainless steel staples to secure the joins in the material, all in line with the manufacturer’s installations manuals.”All of The B Team’s work had to be carried out while minimising any disruption to the store’s long hours of business, with the new APOLLO Lite™ fire barriers being concealed above the building’s reinstated suspended ceilings.The APOLLO Lite™ 30:30 has been developed for use in vertical separation or compartmentation situations, offering 30 minutes integrity and insulation thereby exceeding the minimum requirements of the Building Regulations.It is widely specified to form fire barriers within roof voids and floor voids in many different property types, including tower blocks and other HMOs.The flexible woven and non woven glass fibre material is easy to cut and fix and is treated with a proprietary coating to improve its fire performance properties and therefore prevent temperatures rising in adjoining areas. The system has been fully tested to BS 476 Parts 20 & 22 and is third party certified by IFCC. The six metre long rolls of APOLLO Lite™ 30:30 have a minimum thickness of 6mm and are installed using specialist staples as well as heat resistant adhesive.
Sponsored
Manchester Airport Case Study - PROMAT DURASTEEL to create 60-minute fire-rated ceiling

Manchester Airport Case Study - PROMAT DURASTEEL to create 60-minute fire-rated ceiling

Promat UK

Manchester Airport is an international airport at Ringway, Manchester, England, 7.5 nautical miles south-west of Manchester city centre. In 2019, it was the third busiest airport in the United Kingdom in terms of passenger numbers and the busiest of those not serving London. Working alongside architects Pascall+Watson and subcontractor The Invicta Group, Promat has played a key role in the £1bn Manchester Airport Transformation Programme (MAN-TP), which will see the airport significantly grow and modernise throughout the early 2020s.
Sponsored
Westfield, Stratford

Westfield, Stratford

Berry Systems

Vehicle and pedestrian safety barriers for edge protection on perimeters, ramps and other areas in three multi-storey car parking at a new shopping mall adjacent to the London Olympic Park.Berry Systems installed one of our largest ever car park safety barriers projects at Westfield Stratford City with over 7 kilometres of Berry Beam barrier, all mounted on our impact absorbing spring steel buffers.The £1.5bn Westfield Stratford City complex covers an area of 1.9 square miles and houses 300 retail outlets, 70 food outlets, 3 hotels, multiplex cinema, bowling alley and casino. It also has 5, 000 parking spaces across 1 adjacent and 2 integral multi-storey car parks. The safety barriers were very carefully specified by architects: Buchan Group International. The car park structures are metal framed with concrete decks with an exterior expanded metal mesh surround and cladding. All floors have our Berry safety beams mounted on RB1X and GH spring steel buffers to provide full perimeter protection meeting BS EN 1991-1-1 and BS 6180 standards.All the ramps in the two overground car parks have curved Berry Beam barriers to match the varying radius of the ramps. On tighter bends and at ramp exits, chevron signs have been mounted directly to the barriers. All ramp returns and split level areas are protected by our barriers, again mounted on RB1X buffers with handrail extensions and anti-climb mesh.
Sponsored
Derriford Hospital Multi Storey Car Park

Derriford Hospital Multi Storey Car Park

Berry Systems

Vehicle/Pedestrian safety barriers for the new 627 space, 6 storey car park at the Derriford Hospital in Plymouth.Like many hospitals, Derriford in Plymouth has to match ever-increasing numbers of patients, visitors and staff with limited parking availability. The new 627 space multi-storey car park on the North West Quadrant will go a long way towards easing the situation for the daily 8,000 footfall to the hospital. Part of a 6.6 hectare site being developed by Wharfside Regeneration for Plymouth Hospitals Trust, the new car park was designed by international architects S333 and built by Sir Robert McAlpine Limited.The eco-friendly design features green walls with climbing plants on the two lowest levels, steel latticework on the next two and timber latticework on levels 5 and 6. We recommended our RB1X Spring Steel Buffers that ‘give’ in a collision to absorb impact forces and minimise damage to the barrier, the vehicle and the car park deck that the barrier is mounted on. After an impact, the barrier returns to its original position to provide ongoing protection. Berry Beam rails were used to give a more refined  appearance than the traditional Armco ‘W’ section.A BS 6180 compliant pedestrian handrail was mounted above the barrier on post extensions of 1,100mm high and the space in between filled with anti-climb mesh to stop pedestrians from falling through, or even climbing over the barrier.
Sponsored
Radisson Hotel, County Sligo

Radisson Hotel, County Sligo

Pilkington United Kingdom Limited

County Sligo has been blessed with a brand-new luxury hotel, the internationally renowned Radisson SAS Hotel, where the comfort of guests and staff is of paramount importance. Every precaution has also been taken to ensure the safety of residents including the installation of high quality, clear view fire-resistant glass products, Pilkington Pyrostop® and Pilkington Pyrodur®, which have been fitted extensively throughout the entire hotel.Pilkington Pyrodur® is a laminated glass with a special interlayer, developed for the optimum combination of minimum thickness, integrity fire resistance and impact performance. In a fire, the glass forms an opaque barrier to exclude flames and hot gases as well as blocking the sight of the fire, hence reducing panic. In addition to its integrity performance Pilkington Pyrodur® reduces the transfer of radiant heat significantly.Jackie Corcorran of main contractor, J J Rhatigan & Co. Galway was closely involved in the specification of the specialised glass alongside White Bros. Joinery Sligo & Jim Walsh of Greaney Glass Galway. 160 m2 of 10 mm Pilkington Pyrodur® with a 30-minute integrity rating was installed within the corridors of the building. In other areas where there is a slightly greater risk of fire, such as the kitchen area, internal doors and function room screens, were fitted with 21 mm Pilkington Pyrostop®, which provides 60 minutes fire integrity and insulation.Specialist glass & glazing contractors, Greaney Glass, were responsible for installing the fire-resistant glass and Ivan Greaney, Managing Director, comments: “For such a prestigious project it was imperative we used a fire-resistant glass we could trust. There could be hundreds of people within the hotel at any one time so we needed to use materials that would provide maximum protection under the most extreme circumstances. As Pilkington Pyrostop® and Pilkington Pyrodur® are backed by a full suite of impact and fire performance tests, we had no doubts that this was the ideal glass for this project.”Pilkington Pyrostop® and Pilkington Pyrodur® provide excellent levels of protection and have been tested and assessed to BS and EN standards. Not only do they offer excellent fire-resistance they also fully comply with impact safety tests and permit safe breakage in the manner of a laminated glass. In addition, they provide acoustic improvement over standard fire-resistant glass, an important consideration in the hotel that offers a peaceful and relaxing retreat for guests.
Sponsored
BioClad Specified Jananam Indo Lanka Fertility Centre in Colombo, Sri Lanka

BioClad Specified Jananam Indo Lanka Fertility Centre in Colombo, Sri Lanka

BioClad

Jananam is the 1st Hospital in Sri Lanka to utilise the ‘antimicrobial bubble’ effect by having BioClad for walls & ceilings installed with BioFloor for all clinical areas of the clinic.
Sponsored
A Microbiological Analysis of BioClad PVC Wall Cladding Installed in a Food Preparation Environment.

A Microbiological Analysis of BioClad PVC Wall Cladding Installed in a Food Preparation Environment.

BioClad

This study aimed to compare levels of bacterial contamination isolated from surfaces in a busy kitchen situated in a UK care home. The study’s main objective was to compare bacterial contamination on the antimicrobial wall cladding with other surfaces in the kitchen. The care home kitchen had been fitted with BioClad PVC wall cladding at the time of construction in 2011. All walls in the rectangular-shaped room were fitted with BioClad from ceiling to floor. The antimicrobial performance of the wall cladding was to be appraised according to the findings of the study.
Sponsored
iDecking Project - Dunalastair, Perthshire, Scotland

iDecking Project - Dunalastair, Perthshire, Scotland

Wallbarn Ltd

EasyClick installation onto the Dunalastair Hotel’s large guest courtyard. Refurbishment of an old hotel in Perthshire recently carried out by London Developer Henley Homes who wanted to make better use of the ample outside courtyard spaces around the building, for functions and alfresco dining. Wallbarn pedestals were used in this project; they were secured to the concrete slab, beneath the deck, in order to give the deck strength and also to provide sufficient drainage capabilities, in the most extreme of weather. iDecking was then laid onto the pedestals using our exclusive “EasyClick”, decking solution.
Sponsored
Ceramic tile rail substructure system

Ceramic tile rail substructure system

Wallbarn Ltd

Laying ceramic tiles on flat roofs, terraces and podium decks has been made easier with the development of the Rail System, an integrated substructure system to increase stability of suspended tiles. The Rail System incorporates an adjustable height pedestal with a special clip head fitting, a specially profiled aluminium rail which clicks onto the headpiece without the need for mechanical fixings and a top headpiece which slides along the rail to hold and position the tile. By tying the pedestals together via the rail, there is far less risk of an individual pedestal moving or changing height, leading to far less risk of a tile rocking over time. This assures the integrity of the upper surface and gives a health and safety improvement to the area.The rail gives added structural stability as the weight is distributed laterally along the rails and not driven directly downwards onto the pedestal beneath. The top headpiece can be slid along the rail to fit to the corners of the tile above. This means the edge of the tile does not necessarily have to be directly above the pedestal, giving much greater flexibility for positioning.Consider the possibility of a drainage outlet or other awkward detail being directly beneath the edge of a surface tile. Instead of having to cut the tile back, simply move the pedestals away for the outlet and let the rail circumvent the hazard. Position the top head in the correct place to fit around the corner of the tile and the issue is addressed quickly, securely and easily. The rail system brings greater lateral stability to the tiled deck and is a faster, more efficient way to lay porcelain tiles and slabs. It is a major technical improvement to suspended tile and slab installations.
Sponsored
iDecking for high end residential project

iDecking for high end residential project

Wallbarn Ltd

The client was looking to replace an old wooden walkway. Their contractor recommended iDecking because of its low profile aluminium substructure and composite boards which require far less ongoing maintenance. The installer removed the old decking then used Wallbarn’s heavy duty MegaPad pedestals to underpin the iDecking rail system. These were screwed to the concrete lintels before the aluminium under rails were screwed into the pedestals. The laying pattern followed the architect’s original design, drawing the eye down the length of the walkway. This job took 2 weeks to complete and the client is delighted with the results.
Sponsored
Fire Rated Decking and Class A substructure

Fire Rated Decking and Class A substructure

Wallbarn Ltd

Refurbishment of terrace with Class A fire rated non-combustible decking system. Exadeck porcelain decking boards were fitted to Wallbarn aluminium rail substructure with Class A MetalPad EX adjustable height pedestals. Retro-fitting of entire terrace to comply with fire regulations Approved Doc B and BS 8579.
Sponsored
Hardwood Timber Tiles - Tunbridge Wells

Hardwood Timber Tiles - Tunbridge Wells

Wallbarn Ltd

This project involved a penthouse with a huge roof terrace. The existing deck was dilapidated and needed complete replacement. The existing decking needed to be lifted, cut up and removed. The terrace was jet-washed and sealed. Using ipe tiles on top of adjustable pedestals keeps the tiles out of standing water and creates space underneath for cables, etc. Rooftop terraces are difficult to access. 500x500mm timber tiles are much easier to manually handle and transport than long plank decking. The tiles aren’t fixed to the pedestals, making them future-proofed.
Sponsored
Secure secondary glazing helps protect returning artefacts in C18th Castle

Secure secondary glazing helps protect returning artefacts in C18th Castle

Selectaglaze Ltd

Nestling on the border of Dorset and Hampshire, sitting atop the cliffs at Highcliffe; is the Grade I Listed Highcliffe castle. It was built between 1831 and 1835 by Charles Stuart, 1st Baron Stuart de Rothesay. Selectaglaze provided the Castle with a solution to compliment the restoration of the rooms meeting acceptable museum standards. Selectaglaze installed 3 high security Series 85 2 –pane horizontal slider units, glazed with a 12mm Tecdur anti-bandit glass, which were certified to LPS 1175 SR2. Founded in 1966, Royal Warrant Holder Selectaglaze has gained a reputation as a leading secondary glazing specialist.
Sponsored
Bespoke Development - Royston, Hertfordshire

Bespoke Development - Royston, Hertfordshire

BPD Building Product Design Ltd

The design of the house specified an airtight and thermal efficient solution to meet Building Regulations. The brief for DGTS was to provide a highly insulated (U-Values for walls/0.11 and floors/0.13) envelope to the main steel frame structure and concrete beam and block floors to both ground and first floor level. The dwelling floor area was approx 700m² broken up into twelve rooms including a wet room, gym, media room and library.
Sponsored
Monoridge Project - Danbury, Essex

Monoridge Project - Danbury, Essex

BPD Building Product Design Ltd

This historic property is being converted into luxury apartments and in the grounds of the palace some twenty six new houses are being constructed to be architecturally in keeping with the historic main building. Taking cues from the complex roof layout of the original palace, the new houses have numerous hips, valleys, box gutters, monoridges and even turrets. The increased levels of thermal insulation required within the roof space meant that the risk of condensation occurring out of sight in the loft voids increased dramatically.
Sponsored
Bateman's Tower Cafe, Brightlingsea

Bateman's Tower Cafe, Brightlingsea

BPD Building Product Design Ltd

DG Timber Solutions, specialist designers and manufacturers of timber frame construction were awarded the contract to build the structure’s wall panels in the factory and install on-site, with the objective of achieving an overall wall U-value of 0.20W/m²K.
Sponsored
Full-door alarm - The Junipers PICU

Full-door alarm - The Junipers PICU

Safehinge Primera

The Junipers is the first of its kind in the south west of England; offering inpatient support that's closer to home for people with complex mental health needs. The design of the purpose-built unit included input from experts by lived experience and is truly a facility designed with people in mind. When we first discussed the plans for The Junipers PICU with Devon Partnership, we knew it was an opportunity to work together to create a new state-of-the-art ward. After reviewing their options, Devon Partnership chose to install our full doorset range. We worked closely with them before, during and after installation to ensure all of the doors and locksets were operating to help both patients and staff.
Sponsored
Full-door alarm - Sowenna CAMHS

Full-door alarm - Sowenna CAMHS

Safehinge Primera

Sowenna - the first of it's kind for Cornwall Partnership NHS FT - is a purpose-built child and adolescent mental health (CAMHS) unit, providing inpatient treatment for young people aged between 13 and 18 years. The project had huge local demand, with young people and their families previously having to travel out of county for vitally important care.Thoughtfully designed by Ryder Architecture, the unit focuses on non-institutional safety, wellbeing and recovery.
Sponsored
Electronic access control - Skelbrooke PICU

Electronic access control - Skelbrooke PICU

Safehinge Primera

The Skelbrooke Ward is a psychiatric intensive care unit (PICU) at the Doncaster Adult Mental Health Unit; providing specialised care for people experiencing acute mental ill health. In early 2020, the Skelbrooke Ward underwent a major refurbishment to modernise the environment and introduce new technology to work alongside clinical practices. Patient care and recovery were at the forefront of plans for the refurbishment of the Skelbrooke Ward. Our electronic integrated override locks allow patients to move freely between rooms where access is permitted; whilst the load release en-suite doors carefully consider privacy and dignity without compromising on safety.
Sponsored
Sandymoor District Centre - Promat plays key role in transforming vacant site into valuable community hub

Sandymoor District Centre - Promat plays key role in transforming vacant site into valuable community hub

Promat UK

Promat plays key role in transforming vacant site into valuable community hub 
Sponsored
Durable, high strength, low permeability concrete for green energy plant

Durable, high strength, low permeability concrete for green energy plant

Tarmac

The Margam Green Energy Plant is a long-term, multi-million pound investment into the Welsh economy to help meet the country’s renewable energy targets whilst also strengthening the country’s energy security. A durable concrete was required for the storage silo that housed wood chip to feed the plant.For this project Tarmac suggested their TOPROC SY be used as an overlay on the finished concrete slab as a protective high strength screed. TOPROC SY comprises a micro-silica mix with steel and macro fibres designed to give high levels of abrasive and impact resistance. This product is highly suited to heavy industrial areas such as container handling, metal recycling, waste, loading bays and any other aggressive environments. The main benefit is extended length of time the product will perform compared with traditional concrete therefore saving cost on continual replacement.
Sponsored
Kalwall Translucent Cladding - Heathrow Airport Terminal 4

Kalwall Translucent Cladding - Heathrow Airport Terminal 4

Kalwall

DAYLIGHTING TAKES OFF AT HEATHROWThe ageing glass skylights of Terminal 4 at London’s Heathrow Airport were in need of repair. The challenges for the project’s main contractor was finding a way to keep the project moving with little disruption to this busy terminal and also maintaining the airport’s security protocol.The answer was a single-source solution presented by Structura UK, the curtainwall engineers who are the exclusive distributor of Kalwall products in the United Kingdom and Ireland.18,836 square feet (1750 square meters) of Kalwall Skyroof® cladding were used above the terminal’s International Departure Lounge and check-in desks to replace the 30+ year old glass skylights. The Kalwall translucent sandwich panels are fully Aviation Security in Airport Development (ASAID) compliant with regards to blast performance and improve the solar control and insulation for the space below. In fact, Kalwall 100™ panels were specifically chosen to exceed code requirements, therefore future-proofing the project.The whole retrofit was completed externally using a custom moving scaffold and during evening hours, meaning there was no disruption to the inside of the building. And, as far as value, the lightweight translucent panels allowed for the existing substrate to be adapted and reused – a savings of nearly $9 million (£7m) in project costs and more than a year off the build timeline.“Structura UK was a new supplier to the major capital projects programme on the Airport (and) they delivered a flawless installation despite multiple challenging circumstances including adverse unseasonal weather, unexpected contaminated materials and multiple design changes,” says Ben Hooper, Senior Project Manager at Heathrow.Structura worked in conjunction with Structural Engineers Webb Yates for a scheme designed by Pascall+Watson architects. The project proved so successful that main contractor Balfour Beatty named Structura as their ‘Most Promising New Supplier 2018’. Kalwall offers complete line-of-sight protection, maintaining privacy for the security screening area and departure lounges while bathing the interior with diffused daylighting, regardless of the weather. Apart from providing the visual protection, its inherent strength and heavy-duty impact resistance make it ideal for secure locations such as this. It offers the highest protection in terms of windbornedebris and resistance to impact, abrasion and point loads. Not only is it man safe, but Kalwall achieves S:AA (BS 476 part 3) and Broof(t4) to EN 13501 part 5 for external fire performance.The exterior face is colour stable and includes a UV resistant, self-cleaning surface. This means that normal rainfall helps to keep the surface free of dust and dirt while at the same time retaining its original colour during the weathering process.
Sponsored
GP® Licensed Gas Membrane Installer Scheme

GP® Licensed Gas Membrane Installer Scheme

Juta UK Ltd

A ground-breaking initiative that certifies installers of gas membranes has been launched by JUTA UK and the British Board of Agrément working closely with specialist installer DMI and other industry partners.The new Gas Membrane Approved Installer Scheme is the culmination of three years’ work and is the first of its kind in the UK, delivering supply chain reassurance of high-quality products installed by competent, certified professionals to ensure safe outcomes.It is ‘absolutely right that competent and trained professionals should install these critical barrier applications, which play a key role in the built environment and are designed to last for the lifetime of structures into which they are installed. We talk as an industry about sustainable and resilient solutions for the built environment, and that means using the best possible products, independently certified, installed to the highest possible standards, designed to last for the lifetime of the structure.
Sponsored
Bespoke Joinery Manufacturer uses Fire Door Foam and Intumescent Sealant on Crawley Town Hall

Bespoke Joinery Manufacturer uses Fire Door Foam and Intumescent Sealant on Crawley Town Hall

Fire & Acoustic Seals Ltd

WJL Contracts have been providing high-quality, bespoke joinery solutions to some of the largest contractors in UK construction for over forty years. Known for their expertise and design flair, their fire-rated doorsets and panels have been installed in prestigious building projects spanning the education, entertainment, and commercial sectors. They also offer a full installation service which ensures that their fire-rated and acoustic products are installed competently, setting them apart from a lot of other joinery manufacturers. One of these projects was for Crawley Town Hall in West Sussex on behalf of Kier construction. They successfully delivered bespoke joinery and acoustic panelling doors, an elliptical ceiling, a feature wall, mirrors and kitchenettes. The team overcame significant challenges to hit the deadline including managing the installation of 2700 large 2.7m doors.Fire and Acoustic Seals Fire Door FoamTM and Intumescent Acrylic Sealant were used to install all fire-rated doorsets to guarantee their compliance. Joel Mayer, Buyer & Commercial Manager at WJL comments“We’ve been using Fire and Acoustic Seals’ own-label Fire Door FoamTM and Intumescent Acrylic Sealant on our large construction projects for many years. Our team particularly like the Fire Door FoamTM because they think the quality is excellent compared to others on the market, it’s quick and easy to install and it’s backed up by specific fire door test evidence.We also love the service we get from the team at Fire and Acoustic Seals which is why we’ve continued to work with them for over a decade. They’re incredibly reliable and have a fast turnaround service which ensures our onsite team are never without the products they need when they need them. This is really important to us as we are constantly working to tight deadlines.” For more details about this and other WJL projects visit https://wjlcontracts.co.uk/portfolioContact our team for more information about Fire Door FoamTM and Intumescent Acrylic Sealant.0121 521 2179 | sales@fireandacousticseals.co.uk 
Sponsored
Decking Pedestals & Green Roof System - Kensington

Decking Pedestals & Green Roof System - Kensington

Wallbarn Ltd

A good example of the before and after effects of laying a sedum roof garden and accompanying deck and paved area onto a small domestic roof terrace. All these products are designed to sit on top of the waterproof membrane (in this case single ply) there was no issue of damage to the roof. The support pads lifted the decking off the roof, eliminating the risk of the timber piercing the membrane, and drainage was maintained through the roof surface since the green roof system has a cavity beneath its own reservoir and drainage layer to allow water run-off.
Sponsored
1 metre high Megapads for jacuzzi project

1 metre high Megapads for jacuzzi project

Wallbarn Ltd

The contractor was installing a jacuzzi for a client. The jacuzzi’s filter requires regular cleaning which means lifting a slab to gain access to the area. The best solution for the slabs around the jacuzzi was to elevate them without fixings over the very high void. 915-1020mm Megapads were chosen. Megapads were positioned around the perimeter. Slabs were then laid on top, covering the area whilst allowing access to the filter and giving ventilation to the mechanics. With a weight tolerance of 1,560Kg and temperature resistant to Minus 40°C, Megapads were the perfect solution.

Showing 613-648 of 795

Feedback