by Wallbarn Ltd
Project involved decking a 350m2 the rooftop of a commercial block in the heart of the city. The owners wanted to create a roof terrace for staff. The customer chose the iDecking complete solution for it's superior look. Installation was carried out on an inverted roof. The contractor laid down a double layer of our aluminium frame onto Wallbarn MegaPad pedestals which provide a stable footing for the framework. The composite Moor Oak boards were stamped into position. Installers were able to achieve a great finish by accurately cutting the boards to fit neatly to edges and corners.
Contact Wallbarn Ltd by clicking the button below to find out which products were used in this case study.