NBS Source
I'm a manufacturer

Manchester Airport Case Study - PROMAT DURASTEEL to create 60-minute fire-rated ceiling

OVERVIEW

Manchester Airport is an international airport at Ringway, Manchester, England, 7.5 nautical miles south-west of Manchester city centre. In 2019, it was the third busiest airport in the United Kingdom in terms of passenger numbers and the busiest of those not serving London. Working alongside architects Pascall+Watson and subcontractor The Invicta Group, Promat has played a key role in the £1bn Manchester Airport Transformation Programme (MAN-TP), which will see the airport significantly grow and modernise throughout the early 2020s.

No featured products in this case study

Contact Promat UK by clicking the button below to find out which products were used in this case study.

More inspiration from Promat UK

View inspiration
Stronelairg Wind Farm Case Study - Promat, Duratseel

Stronelairg Wind Farm Case Study - Promat, Duratseel

First Way Campus Student Accommodation, Wembley Park Case Study - Promat

First Way Campus Student Accommodation, Wembley Park Case Study - Promat

The role of vacuum insulated panels (VIP) in FHS’s ‘world-leading energy efficiency’ goal

The role of vacuum insulated panels (VIP) in FHS’s ‘world-leading energy efficiency’ goal

SYSTEMGLAS® Ligna provides assured fire protection for timber framed butt-jointed glazing

SYSTEMGLAS® Ligna provides assured fire protection for timber framed butt-jointed glazing