NBS Source
I'm a manufacturer
Wedi Systems (UK) Ltd

Wedi Systems (UK) Ltd

Innovative, modular system solutions for wet areas inspiring creative and functional design

+44 (0)161 864 2336 Website

Sort by:

Showing 1-11 of 11

Sponsored
Apex Hotel London

Apex Hotel London

Wedi Systems (UK) Ltd

wedi Primo completes luxury in central London Hotel.The Apex Temple Court Hotel is a luxury 4 star hotel, just off Fleet Street central London. Full architectural and interior design was by Ian Springford Architects, Edinburgh.A key factor in the selection of the wedi shower units for each of the 184 bedrooms was the requirement to achieve a high performance quality waterproof bespoke solution capable of adapting to the on site conditions. Ian Springford Architects has specified wedi shower units since 2004 and Apex Temple Court is the fourth Apex hotel where they have been successfully installed. Bespoke pre-fabricated shower units - Fast installation. The key benefits of using wedi were that the Fundo shower design provided simple, fast adaption to the individual shower configurations on site, as well as the detail of enabling the units to extend under the shower door to promote drainage back into the shower area from water falling off the door when in use.Complete prefabricated shower units allow fast dry and accurate construction in ONE integrated product system rather than a combination of different individual manufacturer’s products creating the risk of potential failures between the different systems during assembly and installation. The finished result was a fast track installation of a factory prepared shower system capable of on-site adjustment, delivering a completely waterproof system backed by warranty.
Sponsored
Bathroom refurbishment - residential steam room

Bathroom refurbishment - residential steam room

Wedi Systems (UK) Ltd

Project typeRefurbishmentContractorWilliam Bowley Projects LtdBrief descriptionRecently retired, the clients were looking to move from London to the bustling seaside town of Poole. They found a chalet bungalow at a desirable location right by Poole Park and only a short distance from Poole Harbour & Sandbanks beaches. However, due to it being previously rented out long term, it was in need of a lot of modernisation.The client’s desire was to create a large steam shower area in the master en-suite with plenty of space for them to relax, listen to music and unwind after a busy day.Due to the size and layout of the existing en-suite, and especially its low angled ceilings, careful planningwas required to provide the client with the desired, spacious steam shower without compromising too much on the floor space.RequirementsSteam shower area with sound & lightingThe clients wanted to create an area for absolute relaxation, a private wellness oasis, accessible only from their bedroom.Required components• watertight and steam-proof components with longevity• spacious seating area• practical storage• sound technology• lightingProducts usedBase products• wedi Vapor 85 building boards with pre-installed vapour barrier membrane (SD value of 92)• wedi Sanoasa Bellina seat element• wedi Sanoasa Bellina carrier element• wedi 610 adhesive & sealant• wedi Tools joint reinforcement tape, self adhesive• wedi 620 sealant• wedi Tools waterproof sealing tape• wedi Tools waterproof sealing corners• wedi Tools washers, stainless steelProducts usedIndividual products• 1600 x 950 x 50mm wedi Fundo Riolito shower element(1100mm channel on the long side and DN50 horizontal drainage)wedi solutionsDesigned & built by the installer• a practical and easy to maintain niche for storage(using the trimmings of Vapor 85 building boards)The required technology was integrated into the wedi elements by the installer, providing the clients with the perfect atmosphere to promote well-being.‘Compared with cement board/aqua panel, wedi is truly a superb system; easy to use and fit, lightweight and perfect for tiling over. I will definitely be using wedi for future bathroom installs’Nick Turner, Director at William Bowley Projects Ltd.
Sponsored
Family bathroom with wedi Riofino

Family bathroom with wedi Riofino

Wedi Systems (UK) Ltd

This particular project was a private residential bathroom in the architects own house. The client wanted a linear channel, but the joist layout prevented the use of a traditional single gradient tray with the drainage at one end, so instead we opted for the wedi "Riofino" shower tray with a central channel with a tileable insert as you can see above.The build also includes the use of our pre-formed wedi "niche" and wedi building boards on all the walls and floor coupled with our 360 and 610 adhesives for the complete system solution and warranty.
Sponsored
Intercontinental Hotel, Park Lane London

Intercontinental Hotel, Park Lane London

Wedi Systems (UK) Ltd

HLM, the architectural practice had a very high-end, designer lead project at Park Lane London, which required bespoke components mixed together with standard products forming a warrantied bathroom solution for the client. 15 types of different bespoke XPS shower trays were created for this project and used across the 460 rooms spread over 3 phases.240 bespoke XPS niches were installed and in 210 cases substructure sets were used to reach the required 100mm installation height thus allow for a straightforward replacement of old baths with showers without having to modify the existing pipework.In all bathrooms, wedi XPS building boards were used in 12.5mm thickness for walls and 10mm thickness for floors.RESULT: Thanks to the sub-contractor Milk Leisure, an Approved Partner of a leading manufacturer of XPS shower/bathroom systems, the client received a 100% waterproof bathroom with a 15 year manufacturer’s warranty on the whole installation. 
Sponsored
JD Gyms

JD Gyms

Wedi Systems (UK) Ltd

JD Gyms are a reputable company within the leisure industry. When they started to experience serious leakage problems across their estate (especially on mezzanine floors), they quickly realised that their existing shower construction does not live up to the standard of their service – and would need a reliable, guaranteed system solution.In order to allow for a straightforward and safe replacement of existing showers without the need to change the existing pipework, a grid platform constructed of 80mm XPS building boards was proposed . The showers then were fitted with XPS linear shower trays featuring dry-fit drain technology, 12.5mm XPS building boards on the walls and surrounding floor areas were sealed by proprietary sealing and decoupling membrane, all ready to tile after 24 hours. Up till now, 18 different sites have been completed and the shower system solution comes with one manufacturer’s guarantee on the whole installation. 
Sponsored
Kingston Gas Works, Berkeley Group

Kingston Gas Works, Berkeley Group

Wedi Systems (UK) Ltd

A recent project of the Berkeley Group, the Kingston Gas Works with 240 apartments called for a special solution due to the maximum construction height available for the shower being only 100mm including tray and drainage. All showers were constructed with XPS integrated shower elements (wedi Fundo Integro), which are only 90mm thick including the integrated DN50 drainage. Despite the low construction height, the specified solution offers no compromise on the flow rate of the drainage. Complete waterproof bathrooms - walk-in shower with a niche, building boards on walls & floors with sound insulation. Products:wedi Fundo Integro shower element with integrated drainage (1800x900x90mm) wedi building boards 10mm & 12.5mm - for walls and floorswedi prefabricated niche wall element wedi Non-step sound insulation composite panel (reduction by 16db)
Sponsored
Luxury Hotel Bathrooms - Hyatt Blackfriars

Luxury Hotel Bathrooms - Hyatt Blackfriars

Wedi Systems (UK) Ltd

Grade II listed hotel in the heart of the City of LondonHyatt Regency London Blackfriars is located in the historic Square Mile, directly outside Blackfriars station, and is a short stroll from St. Paul’s Cathedral, the Tate Modern and Shakespeare’s Globe Theatre. The Grade II-listed five-star hotel is steeped in regal history, residing on the former grounds of King Henry VIII's Bridewell Palace.195 rooms had wedi XPS shower tray formers (the wedi Fundo Riolito neo) featuring a linear drainage channel with continuous slope right to the channel and more flexible adjustment for tiling. Providing a complete abP-approved, CE marked and BBA accredited waterproof system, removing the need for labour intensive tanking because no further sealing is required.
Sponsored
Schwimmbad Berlin

Schwimmbad Berlin

Wedi Systems (UK) Ltd

Projects Information: Type: Public Swimming Pool Room: Shower area for women/men, shower Location: Berlin Kaulsdorf Construction company: Heidrich Fliesen, Zernitz-Lohm Project Description: 50m pool Non-swimmer pool with slide 2 sauna cubicles 95°C, steam bath, samarium 4 water wheelchairs, no lift, but flat, rounded Disabled parking spaces Products/Systems used: wedi Building Boards in different thicknesses wedi 610 Adhesive and Sealing Material wedi Tools Reinforcement Tape Special production (8 units each) with Fundo Requirements: Very short assembly times on site Support from AD + AWT in setup/instruction Very short drying times Water-tight material Quick processing
Sponsored
Small WC wetroom with wedi Top

Small WC wetroom with wedi Top

Wedi Systems (UK) Ltd

The client here had a small space that they wanted to use to create a wetroom, wedi liaised directly with the designer and tiler to assist with the products used in the final installation. This includes a wedi "Slim Kit" and wedi "Top" material on the floor as the finished surface. wedi Top was utilised to keep the whole build-up as slim as possible as it offers anti-slip and mould resistance in a mere 6mm thickness without the need for grout lines and cleaning that you would have with a traditional tile.
Sponsored
wedi brings wellness to Hilton Heathrow T5

wedi brings wellness to Hilton Heathrow T5

Wedi Systems (UK) Ltd

The impressive wellness & luxury spa centre at Hilton Hotel London Heathrow T5 created by specialists Milk Leisure, specified wedi to construct & supply a series of bespoke steam rooms & wellness elements. Aroma rooms, salt & rasul treatment plus wellness benches with heated elements & an ice-fountain were all produced using wedi’s customised solutions service. All produced to the highest standards & pre-assembled in the wedi factory to ensure accuracy before delivering to site. The wedi system brings true wellness & peace-of-mind delivering a high quality fully waterproof installation ahead of schedule & supported by a system warranty
Sponsored
Wood Wharf London

Wood Wharf London

Wedi Systems (UK) Ltd

Residential New Build apartment and spa area, consisting of 141 apartments.21 loft apartments required a design lead shower solution for which waterproof XPS round shaped floor shower elements, bathboards for tileable cladding of baths and XPS building boards were supplied in 12.5mm thickness for walls and 10mm thickness for floors.120 Apartments had XPS floor level shower elements featuring a drainage channel right next to the wall, a completely continuous slope right to the channel and more flexible adjustment for the channel. 12.5 & 10mm XPS building boards were used on walls and floors.This was the first installation that we know of in the UK where the boards in the shower area were fixed to the studwork solely by a versatile single component adhesive sealant (wedi 610), ensuring no penetrations through the boards. The special formulation is especially suited to waterproof butt joints of building boards, and has outstanding resistance to the elements; and to chemicals; and is also free of solvents, silicon and PCP.As an abP-approved system, the use of the adhesive sealant and XPS building boards reduces installation time by up to 50% because no further sealing is required, even in areas of high humidity.

Showing 1-11 of 11