Schlüter-Systems Ltd

Schlüter-Systems Ltd

Profile of Innovation

+44 (0)1530 813396 www.schluterspecifier.co.uk

Sort by:

Showing 1-21 of 21

Adare Manor - Minimising Build-Up in The Manor

Adare Manor - Minimising Build-Up in The Manor

Schlüter-Systems Ltd

Schlüter-Systems used its specialist technical knowledge and a number of key product solutions to minimise floor build-up and guarantee complete waterproofing provision in the refurbishment of one of Ireland’s most magnificent country houses. Set in 840 acres of grounds, Adare Manor was the subject of an 18-month-long renovation—its most extensive in 25 years. 40 new bedrooms have been added to this 19th century neo-gothic masterpiece as well as a host of new facilities; including a swimming pool, boardroom, cinema, spa and 350-capacity ballroom.
Barbican Apartment - A new language for a Barbican Type 3C tower flat interior

Barbican Apartment - A new language for a Barbican Type 3C tower flat interior

Schlüter-Systems Ltd

Quinn Architects, on behalf of the Director Laurence Quinn and his family, undertook the renovation of an eleventh-floor four bedroom Barbican tower apartment. The Barbican is a radical project and has been designated as a site of special architectural interest for its scale, its cohesion and the quality of the architecture. The complex is architecturally important as it is one of London’s best examples of concrete brutalist architecture.
Lalit Hotel London - Wetrooms Fit for a Maharaja

Lalit Hotel London - Wetrooms Fit for a Maharaja

Schlüter-Systems Ltd

We zone in on the complete wetroom solution provided for the Lalit Hotel one of Schlüter-Systems’ grandest projects of 2016/17 and finalist in the ‘Listed Building (Over £5 million)’ category of the AJ Retrofit Awards 2017. The conversion project took the historic Grade II listed building previously known as St Olave’s Grammar School, located at Bankside in London, and transformed it into a luxury 70-room boutique hotel that fuses the best of Indian and British culture. Lalit London is the 13th hotel of the Lalit Suri Hospitality Group, and the first based outside of India.
Landmark Place - Perfect Edge Finishing for a Prestigious Residential Development

Landmark Place - Perfect Edge Finishing for a Prestigious Residential Development

Schlüter-Systems Ltd

Schlüter-Systems provided a variety of trims and movement joints to ensure a damage-free finish for the tiled walls and floors of high-end residential project, Landmark Place. The 280,193sq ft Barratt Homes development has an enviable position on the north bank of the River Thames, near the iconic Tower Bridge, and boasts 165 one-bed suites, one, two and three bed apartments and penthouses across 10 storeys. It replaces Sugar Quay, a 1970s office building built for Tate and Lyle, which was purchased by CPC Group back in 2012.
Lympstone Manor - Waterproofing a West Country Vision

Lympstone Manor - Waterproofing a West Country Vision

Schlüter-Systems Ltd

In looking for a full tanking solution for the ensuite bathrooms of renowned chef Michael Caines’ dream project, stone specialists Devon Stone elected to use various forms of the multi-functional tile backerboard Schlüter-KERDI-BOARD. The project took a Grade II listed Georgian manor house and converted it into a striking contemporary country house hotel with 21 guestrooms. As well as gourmet cuisine and luxurious yet subtle interiors, Lympstone Manor has pride of place overlooking the Exe estuary, a Site of Special Scientific Interest (SSSI) due to the wildlife it supports.
Tate Britain - An Artistic Uncoupling of Tile

Tate Britain - An Artistic Uncoupling of Tile

Schlüter-Systems Ltd

1,300m2 of Schlüter-DITRA 25 uncoupling membrane ensured a crack-free finish for the tile within 2016 Turner Prize nominee Anthea Hamilton’s 2018 commission for the prestigious Duveen Galleries. One British artist a year is invited to produce a new work for the signature space, which constitutes the heart of one of the UK’s most famous art galleries. Hamilton’s response, entitled ‘The Squash’, combined performance and sculpture in an immersive experience.
The Eiffle Tower - Uncoupling an Icon

The Eiffle Tower - Uncoupling an Icon

Schlüter-Systems Ltd

There are few landmarks in the world more famous than the Eiffel Tower. When it came to the latest round of renovations for this romantic French landmark, two of Schlüter’s own iconic products proved to be key. Constructed between 1887 and 1889, the Eiffel Tower was inaugurated at the Exposition Universelle of 1889, held to commemorate the 100th anniversary of the French Revolution. It was a feat of engineering and architecture and today welcomes almost 7 million visitors a year.

Showing 1-21 of 21