NBS Source
I'm a manufacturer
Dura Composites Ltd

Dura Composites Ltd

We design, manufacture and supply innovative recyclable composite products for industry.

+44 (0)1255 423601 Website

Sort by:

Showing 1-12 of 12

Sponsored
West Ham Stadium, London

West Ham Stadium, London

Dura Composites Ltd

Non-Conductive, Anti-Slip Flooring and Walkways | Case StudyArena Events Group chose Dura Composites to supply the tiered structure stadium decking for the seating and platform areas, manufactured from our high quality and corrosion-resistant Glass Reinforced Polymer (GRP) Dura Slab 40 and 20 products which provided an anti-slip, fire-tested and load-tested alternative to the Buffalo® Board and traditional plywood used previously. Dura Composites’ ability to be able to meet a range of stringent test requirements including flare resistance tests and FEA analysis made us the ideal choice for this high profile project which not only allows for future changes to seating configurations, but also improves access to amenities on the concourse. The two types of Dura Slab used on this project are precision engineered GRP structural flooring systems that provide an incredible strength to weight ratio. High strength fibreglass composite is pultruded in one mass to produce a consistent quality flooring structure that is also non-corrosive, chemically resistant – and has an anti-slip walking surface.
Sponsored
Kings Cross Station, London

Kings Cross Station, London

Dura Composites Ltd

GRP End of Platform Steps | Case StudyContractor AmcoGiffen selected Dura Composites to design and fabricate 6 sets of GRP End of Platform Steps for Kings Cross Station in London, which were installed by Amco in a very short time frame to meet the needs of the tight project timescales. Weighing up to 80% less than steel and 30% less than aluminium, Dura Composites End of Platform Steps offer equivalent performance for considerably less weight. This results in major savings including lower installation costs due to more economical transportation, handling and on-site positioning.The client was delighted with the quality of the design and workmanship and with Dura’s ability to turn the fabrications around in such a short space of time, describing the structures as having “gone in like a dream”. As well as fully fabricated non-corrosive and non-conductive single unit GRP end of platform steps Dura Composites can also supply in component or flat pack kit form ready for quick assembly on-site.
Sponsored
Isle of Wight Platform Stations, UK

Isle of Wight Platform Stations, UK

Dura Composites Ltd

GRP Rail Station Platform - Mountbridge Install | Case StudyThe Island Line and its associated infrastructure on the Isle of Wight in the UK has recently been upgraded to offer a more frequent service and introduce a refurbished fleet of Class 484 trains. Key to the project was creating improved accessibility between the train and the station platform to allow the new trains to operate effectively. This was achieved by deploying GRP Dura Platform panels from Dura Composites in conjunction with the Mountbridge™ system from Hammond ecs ltd to raise the platform gauge by up to 400mm at 5 stations on the Island Line, including Ryde Pier Head.The patented 40mm Dura Platform solution (Patent No GB 2 523 381) has a span of 1.5m per 5kN/m2 UDL and delivers multiple benefits in terms of faster, safer and easier installation, reducing time on site, therefore reducing disruption to passengers, and providing major cost savings versus traditional materials such as concrete. The platform panels can accommodate fully integrated tactile recesses, illumination of the coper and integrated heating to remove frost & ice build up and reduce the future maintenance burden of the platforms.
Sponsored
Offshore Technician Training Facility, Grimsby

Offshore Technician Training Facility, Grimsby

Dura Composites Ltd

Bespoke Access Structure | Case StudyThis two-level access structure with staircases, cladding, edge protection handrailing and anti-slip grating flooring was designed by Dura Composites in conjunction with our client ENGIE Fabricom UK, who provide engineering and construction services to sectors including renewables, oil and gas, power, chemical and energy from waste.With the ability to supply both composite timber cladding for the containers and all the required GRP elements for the project, Orsted chose to work with Dura Composites. Although steel had previously been considered, the rising cost of steel versus GRP and its tendency to corrode in coastal environments made composite materials a far more durable and cost-effective option.The resulting access structure is safe, looks attractive and is non-conductive and non-corrosive. With a long design life and 25 year warranty, the GRP components are part of the latest d² range from Dura Composites which offer safer, stronger, faster and proven properties.
Sponsored
Shard Place Riser Install, London

Shard Place Riser Install, London

Dura Composites Ltd

Dura Grating Riser Installation | Case StudyShard Place is the third phase of the £3.5 billion redevelopment of the estate next to London Bridge station, known as Shard Quarter. Reinforced concrete frame and groundwork specialists Getjar were appointed as the formwork contractor by the principal contractor Mace and chose the Dura Composites Riser Install team to take on some of the complex install challenges of the service risers.Dura’s unrivalled expertise and full install capabilities meant they could deliver a bespoke solution for a large triangular shaped riser on all 26 storeys that required the use of galvanized steel supports and bracketing in conjunction with GRP Dura Grating to allow for cutouts to be performed whilst maintaining the integrity of the riser.
Sponsored
Noss-on-Dart Marina, UK

Noss-on-Dart Marina, UK

Dura Composites Ltd

d² Dura Grating Mini Mesh, Dura Profile & Dura Platform 40 | Case StudyDura Composites was engaged by Premier Marinas to work with their engineering company to produce a composite floor structure around their travel hoist supported by large 305mm GRP Dura Profile beams between 6-10m in length. The team chose the GRP material over steel due to its superior performance in corrosive salt-water environments. Unique in the market, Dura Profiles exceed the higher performance E23 grade requirement of the BS EN 13706 standard.Also central to the efficient operation of the washdown and hoist are Dura Grating and Dura Platform 40 flooring made from moulded and pultruded high-performance GRP panels which are unique in design to Dura. The open mesh section utilises 55mm d2 Dura Grating Mini Mesh in dark grey, which facilitates drainage whilst maintaining strength and unrivalled anti-slip properties. The solid surface sections were created using patented d2 Dura Platform 40, which are crankable to create an in-built fall to aid water runoff.
Sponsored
Robroyston Station, Glasgow

Robroyston Station, Glasgow

Dura Composites Ltd

GRP Rail Station Platform - Hybrid Install | Case StudyRobroyston station features two brand new platforms constructed using the Dura Composites recommended hybrid GRP and steel solution which is designed to meet the requirements of Network Rail standard NR/L3/CIV/030 and combines the strength of a steel foundation with a Glass Reinforced Polymer (GRP) Dura Platform surface. The platform surface has incredible durability and anti-slip properties which is shown to reduce by only 5% after a million footfalls (tested to BS 7976-2:2002+A1:2013).AmcoGiffen were responsible for delivering the design and build works for the development, with funding for the station coming from Glasgow City Council, Network Rail and the Strathclyde Partnership for Transport.In choosing the GRP/Steel system from Dura Composites, the platform installation for the project (using GRP Dura Platform and steel trestles) has been able to take place largely while the line is open, minimising the impact on customers using the line.
Sponsored
The Lock, Greenford Quay, West London

The Lock, Greenford Quay, West London

Dura Composites Ltd

Dura Deck Flip® Composite Decking | Case StudyThe Lock at Greenford Quay is a development of 194 waterfront apartments, located in the London Borough of Ealing in West London. It features a beautifully landscaped garden with innovative seating areas and a stunning rooftop terrace with panoramic views.Landscape Architects and Environmental Planners Standerwick Land Design worked with landscape services specialists Valley Provincial to bring the new areas to life. With over 45 years’ experience, Valley Provincial has won multiple awards for its high-end commercial and residential projects.The company was responsible for the installation of Dura Composites’ Class Bfl fire-rated Dura Deck Flip decking and A2 fire-rated substructure system on the terrace and within the communal garden. Wanting to create a natural look and feel that enhanced the pretty waterside setting, but which met stringent safety protocols, Valley Provincial chose Dura Deck Flip in the Weathered Cedar and Pebble Grey colour pairing.
Sponsored
Chelsea Flower Show, London

Chelsea Flower Show, London

Dura Composites Ltd

Composite Decking - Interlocking Dura Deck Tiles | Case StudyThe RHS Chelsea Flower Show is a renowned annual garden exhibition held for five days each year by the Royal Horticultural Society (RHS) in the grounds of the Royal Hospital Chelsea in Chelsea, London.Gorilla Carts and Kiosks were chosen to supply anti-slip modular flooring to enable safe access around the food courts. Using the innovative fast-fit interlocking Dura Deck Tile product designed and manufactured by Dura Composites, Gorilla Carts and Kiosks were able to quickly and easily install hundreds of square metres of outdoor flooring which provided clear demarcation of pedestrian standing and seating areas. Anti-slip, durable, and with an attractive woodgrain composite timber finish, the tiles interlock quickly and easily for set up and removal – and can be laid on virtually any existing hardstanding to create a simple decked area.
Sponsored
Composite Decking Garden Transformation, Essex

Composite Decking Garden Transformation, Essex

Dura Composites Ltd

Dura Deck Flip® Composite Decking | Case StudyOver the past six years this Georgian property has been lovingly restored by Ciara and her husband Ben, including underpinning work to the foundations and a new roof.Journalist Ciara’s passion for the unique and creative really shone through in her design for her composite decking area. With a love for creamy based neutrals to complement the earthy red brick tones the house, she chose pretty Dura Deck Flip composite decking in the colour Weathered Cedar for the main decking area. UV resistance, scratch and stain resistant and with a Class C fire rating, it was installed on rot-free Dura Deck Aluminium pedestals and bearers for a low-maintenance ‘fit-and-forget’ decking solution.
Sponsored
IFA2 Converter Station - GRP Products

IFA2 Converter Station - GRP Products

Dura Composites Ltd

Non-Conductive Fencing, Trench Covers and Access Structures | Case StudyPower and Energy Infrastructure Contractor Morgan Sindall was appointed to design, build and commission the new converter station and chose to work with Dura Composites to provide safe, non- metallic Glass Reinforced Polymer (GRP) utility fencing for the AC/DC Halls, as well as a range of non-conductive access structures, utility trench covers & handrailing across the site.The IFA2 project aims to connect the electricity systems of Great Britain and France using high voltage subsea cables and will be capable of exporting or importing 1000MW of power between the UK and France, enough to power up to 1 million homes. In this project, the client specification mandated the use of non-conductive and non-metallic materials which could be used to construct removable fencing, permanent fencing and sliding gates to enable access to specific authorised personnel, whilst preventing others from accessing high-risk areas.
Sponsored
Luxury Car Valeting Centre, Belfast

Luxury Car Valeting Centre, Belfast

Dura Composites Ltd

d² Dura Grating Mini Mesh and Solid Top Raised Flooring | Case StudyNew Glass Reinforced Polymer (GRP) Mini Mesh and Solid Top d² Dura Grating is the ideal raised flooring solution for luxury car valeting centres, car workshops and other automotive facilities thanks to its lower cost, weight saving and improved visual inspection capability versus previous generation grating.The Dura Composites raised flooring solution is a full design and supply system, incorporating both the raised pedestals, floor grating and mounting system. The unique d² Dura Grating design also allows for improved visibility of the substructure below, offering a clear view of draining liquids from the valeting process from a much wider range of angles than were previously achievable.

Showing 1-12 of 12