NBS Source
I'm a manufacturer
Baldwin Boxall Communications Ltd

Baldwin Boxall Communications Ltd

Leading the way to safety

+44 (0)1892 664422 Website

Sort by:

Showing 1-3 of 3

Sponsored
22 Bishopsgate

22 Bishopsgate

Baldwin Boxall Communications Ltd

One of the newest – and very impressive – developments in the City, 22 Bishopsgate offers visitors retail, work and restaurant space over 60 floors. It is actually the tallest building in the City of London.A flexible solution was required for this project, to include life safety communication for the entire building. At the forefront of the design was the need for a plan for phased evacuation using the life safety systems. The VIGIL3 voice alarm and OmniCare emergency voice communication systems were quoted for the project due to their reliability and capability.The project required new voice alarm and EVC systems which were specified and installed by PHF Fire. The EN54 certified VIGIL3 voice alarm includes 70 space saving, wall-mounted Eclipse4s and two floor standing racks, networked around the building. The voice alarm network is accessed by the touch screen control microphone, with its user-friendly NFC card sign-in option.The EVC system solution, OmniCarePLUS, includes fire telephones, combined fire telephones with disabled refuge outstations, disabled toilet alarms, advanced disabled refuge outstations and standard disabled refuge outstations. These made up the remaining call points on the system, a lot of which were in a stainless steel finish, to match the high quality aesthetic of the building.Installed by PHF Fire, Baldwin Boxall worked together with the team to aid in the design and commissioning of the systems.Sam Faulkner, Maintenance Manager at PHF Fire commented, “Baldwin Boxall was specified alongside other companies. However, the level of support that Baldwin Boxall gives throughout the project, from start to finish, set them apart from the competition.”Chris Hartup, Sales Manager at Baldwin Boxall said, “This new build project called for a very capable, reliable and professional fire alarm contractor and with the contract being awarded to PHF Fire, they certainly got that. Due to limited floor space, the Eclipse4s were installed into riser cupboards within the building, providing further redundancy to the end user.PHF Fire had a fantastic, positive relationship, not only with their client but also their whole supply chain. We had many meetings and presentations on site with the whole 22 Bishopsgate team.It was a great experience to be involved in this project and with PHF Fire throughout.”
Sponsored
Curragh Race Course

Curragh Race Course

Baldwin Boxall Communications Ltd

ABOUT CURRAGH:Nestled in the glorious countryside of Southern Ireland sits the Curragh Race Course. Initially founded in the coffee rooms of Kildare, the Irish Turf Club was quickly established as the governing body for horse racing throughout Ireland.The first recorded race on the plain took place in 1727 and now Curragh (from the Irish name ‘Cuirreach’ meaning ‘place of the running horse’) is home to Ireland’s five classic races.ABOUT THE PROJECT:The Curragh site has recently undergone a 65 million Euro redevelopment project across its entirety. Works carried out included the stable yard (featuring 135 stables) and the building of a brand new grandstand with a spectacular sweeping roof. Covering 10,500 square metres the new grandstand can cater for up to 6,000 people within its four levels – in fact, the site as a whole, has an incredible crowd capacity of 30,000 - which is a typical number for events such as Derby Day!Visitor enjoyment and responsible ‘crowd’ control during any event at Curragh are equally important to the site owners and managers; therefore, all aspects of this were to be considered carefully during the planning stage of the redevelopment. Ensuring an event at Curragh is a pleasurable experience takes a lot thought and care. Aspects such as creating the right atmosphere for the different areas and ensuring that everyone can hear race commentaries and announcements, all form part of the overall impression of the day’s event. Taking great lengths to provide all visitors with a memorable day is likely to encourage them to return again in the future.To carry out the works required, a selection of top consultants were selected for the different aspects of communication throughout the site. Dublin based, Sound Productions Ltd was chosen to design and commission the PA/VA and EVC, as well as the TV and other audio distribution systems required for the Curragh buildings and surrounding grounds.The brief to Sound Productions was to supply a flexible multi-zone audio and voice alarm system with top quality audio. The specification was for a complex zone arrangement, with multiple audio inputs from broadcast companies, live commentary, background music and TV audio distribution. This included the requirement for a 98dB sound level trackside, with absolute intelligibility throughout all areas (including those with high reverberation) and, for this, a highquality PA/VA system was needed. It was imperative that these works were delivered on schedule, with ‘quality’ to be considered as the prevailing factor, without exception, throughout the project.The PA/VA system was to be delivered over two phases – the first one being the system rack for the Parade Ring; the second to be the New Grandstand, including two main Baldwin Boxall PA/VA VIGIL control racks delivering power to a network of EN54 loudspeakers. The specification for VIGIL to be the PA/VA system for Curragh was due to Baldwin Boxall’s renowned reputation for product quality and reliability, as well as the company’s excellent track record for the delivery of large projects.Now fully installed and operational, the PA/VA system is equipped to cater for up to 24 analogue and 32 digital audio channels all distributed to over 50 zones. Multi-zone general paging is also delivered using Baldwin Boxall’s BVRD TSM touch screen microphones along with BFM series microphones for emergency purposes.The project’s requirement for disabled refuge call points has been fulfilled by the installation of Baldwin Boxall’s Omnicare EVC system, which is controlled via a 16-way control panel situated in the Security Room.Commenting, Peadar Carley, Project Engineer, Sound Productions said “We are delighted to have been involved with such an amazing project. We have a long-standing professional relationship with Mercury Engineering (the project electrical contractors), who share our ethos of being very particular with detail and passionate about providing the best quality. To know that we were chosen due to our ability to deliver large, complex systems and for our audio knowledge, makes us very proud indeed.”When asked about Baldwin Boxall, Peadar continued, “We have been buying, installing and commissioning Baldwin Boxall products for very many years - over 30 in fact. The systems just keep on going - they really are robust! But it is not only for this reason that we return to Baldwin Boxall repeatedly, but also because of the support we can get from them. They know their stuff, are easy to deal with and I recommend them without hesitation.”
Sponsored
BP4, 25 CHURCHILL PLACE

BP4, 25 CHURCHILL PLACE

Baldwin Boxall Communications Ltd

25 Churchill Place is a 23 storey commercial office tower in Canary Wharf, London. The tower includes 20 floors of high quality (Grade A) office space and is one of the most energy efficient office buildings in the area. Environmental features include lifts that store energy that is re-used elsewhere in the building, and also a highly efficient air conditioning system.Standing at 130m tall, 25 Churchill Place has a VIGIL2 EVAS voice alarm system and an Omnicare EVC system installed.Initially the voice alarm system was installed to service the ‘shell and core’ of the building, with the system racks being designed and built to enable the fitting of ‘tenant’ functionality as and when required. This process is easily achieved due to the modular design of a VIGIL voice alarm system and is a frequently used benefit for ‘new builds’.For the disabled refuge and fire telephone system (EVC), the loop wired Omnicare system was chosen. Canary Wharf Contractors (landlord of BP4) opted for the dual coloured combined fire telephone (red)/disabled refuge (green) outstation which provides users with a choice of communication method.Both systems were designed and installed by Global Fire & Security Systems - one of our Gold Account achievers. Commenting on the installation, Stuart Beeley, Operations Director, Global Fire & Security Systems, said “We have worked closely with Canary Wharf Contractors and Baldwin Boxall on many great projects, and BP4 is another one to add to that list. We choose Baldwin Boxall systems, not only because we know them to be well built and reliable, but because of the support we receive from the company - at all levels.”

Showing 1-3 of 3