NBS Source
I'm a manufacturer

West London – Combination Waterproofing (2 forms) to BS 8102:2009

OVERVIEW

When specifying the most appropriate method of waterproofing for a new-build basement it is advisable to follow the recommendations within BS 8102:2009 ‘Code of Practice for Protection of Below Ground Structures Against Water from the Ground’. The standard advises on the types of waterproofing available and confirms the performance grade to be achieved. This project required Grade 3 protection – no dampness or water penetration acceptable.

Products featured in this case study

View all products (79)
Delta 800 Series Bespoke Packaged Pump Station (Foul Water) - Packaged Pump Station

Delta 800 Series Bespoke Packaged Pump Station (Foul Water) - Packaged Pump Station

Delta Dual V3 Packaged Pump Station

Delta Dual V3 Packaged Pump Station

Delta Channel System

Delta Channel System

Koster Polysil TG 500

Koster Polysil TG 500

Delta Foul V3 - Package Pump Station

Delta Foul V3 - Package Pump Station

Delta MS20 - Cavity Drainage Membrane

Delta MS20 - Cavity Drainage Membrane

Delta Dual V4 Packaged Pump Station

Delta Dual V4 Packaged Pump Station

More inspiration from Delta Membrane Systems Ltd

View inspiration
Flood Recovery – Grade II Listed Building

Flood Recovery – Grade II Listed Building

BRE Flood Reilient Test Home

BRE Flood Reilient Test Home

The Gunnery, Kent

The Gunnery, Kent

Luxury North London Residence

Luxury North London Residence

More inspiration from High-density polyethylene (PE-HD) studded sheets

View inspiration
Structural Waterproofing Mixed Commercial Development

Structural Waterproofing Mixed Commercial Development

Remedial Basement Waterproofing

Remedial Basement Waterproofing

Future Proofing Waterproofing Multi Level Commercial New Build Structure

Future Proofing Waterproofing Multi Level Commercial New Build Structure

The Schwarzman Centre

The Schwarzman Centre

More inspiration from Floor channels

View inspiration
Structural Waterproofing Mixed Commercial Development

Structural Waterproofing Mixed Commercial Development

375 Kensington High Street

375 Kensington High Street

Four Seasons Hotel, Park Lane

Four Seasons Hotel, Park Lane

Basement Pumping System, Kent

Basement Pumping System, Kent

More inspiration from Packaged pumping stations

View inspiration
Structural Waterproofing Mixed Commercial Development

Structural Waterproofing Mixed Commercial Development

Remedial Basement Waterproofing

Remedial Basement Waterproofing

Waterproofing and Flood Protection for a Period Watermill, Kent

Waterproofing and Flood Protection for a Period Watermill, Kent

Protecting Christian Dior’s Flagship London Store

Protecting Christian Dior’s Flagship London Store

More inspiration from Slip plane bituminous emulsion paint primers

View inspiration
Structural Waterproofing Mixed Commercial Development

Structural Waterproofing Mixed Commercial Development

Remedial Basement Waterproofing

Remedial Basement Waterproofing