OVERVIEW
At Stormguard Rainwater we were asked to provide a two-part coping system to the balconies, podiums and terrace areas, a full coping system to the main roofs and flashing profiles to various areas of the building including the fascia’s to the concrete balconies. West One is a high end development of 186 flats across three blocks situated directly beside Wembley Central tube station, and with our profiles, continues our productive involvement in the regeneration of Wembley.
To assist our customer with this project Stormguard Rainwater offered on site assistance at survey stage to make sure all the areas which needed aluminium profiles were checked and measured, as well as supplying working drawings to aid the installation once the materials had arrived on site.
Contact Stormguard Rainwater Systems by clicking the button below to find out which products were used in this case study.
Harrow
Norwood
NW London - Houses