NBS Source
I'm a manufacturer

Virgin Money

OVERVIEW

The Gas 3002 boilers had served the building well over the years. But as they were nearing the end of their serviceable life, ISS, the Bank’s facilities management providers, were keen to carry out a plant upgrade.

Energy efficiency and reliability were the key requirements together with the need to maintain heating services throughout the project and minimise disruption for the office workers.

Remeha and M&E contractors Protech Heating, who had installed the original boilers, proposed trialling the newly developed Remeha Gas 320 Ace boilers at Jubilee House. Two Gas 320 Ace 6-section boilers were selected to satisfy the building’s heating demands. With high gross efficiencies and low NOx emissions, the new boilers met all of the Bank’s requirements for improved system efficiency, emissions and cost savings.

Products featured in this case study

View all products (24)
Gas 320 Ace - Gas Boiler

Gas 320 Ace - Gas Boiler

More inspiration from BAXI HEATING UK LIMITED

View inspiration
BIRMINGHAM CITY FOOTBALL CLUB

BIRMINGHAM CITY FOOTBALL CLUB

Riverside Primary School

Riverside Primary School

Zoning in on heat networks

Zoning in on heat networks

Domestic hot water generation in older hotel buildings and the importance of preparing for net zero

Domestic hot water generation in older hotel buildings and the importance of preparing for net zero