OVERVIEW
The Gas 3002 boilers had served the building well over the years. But as they were nearing the end of their serviceable life, ISS, the Bank’s facilities management providers, were keen to carry out a plant upgrade.
Energy efficiency and reliability were the key requirements together with the need to maintain heating services throughout the project and minimise disruption for the office workers.
Remeha and M&E contractors Protech Heating, who had installed the original boilers, proposed trialling the newly developed Remeha Gas 320 Ace boilers at Jubilee House. Two Gas 320 Ace 6-section boilers were selected to satisfy the building’s heating demands. With high gross efficiencies and low NOx emissions, the new boilers met all of the Bank’s requirements for improved system efficiency, emissions and cost savings.
Gas 320 Ace - Gas Boiler
BIRMINGHAM CITY FOOTBALL CLUB
Riverside Primary School
Zoning in on heat networks
Domestic hot water generation in older hotel buildings and the importance of preparing for net zero