Tree Root Protection, Woodland Access, Abweb TRP, Center Parcs, Woburn, UK

OVERVIEW

Part of the planning consent for Centerparcs included a roundabout and the creation of cycle bridleways. The aim to complete the work using a method sympathetic to the environment whilst avoiding damage to the tree roots. ABG Abweb TRP has a three dimensional cellular structure which when filled mitigates the vertical load pressure on the sub soils. The Abweb TRP cells act as a permanent form work to the road surface.In this no dig solution water and nutrients can flow into underlying soil allowing trees to flourish.

No featured products in this case study

Contact ABG by clicking the button below to find out which products were used in this case study.

More case studies from ABG

View all case studies (25)
Vegetated Retaining Wall, Cutting Stabilisation, Webwall, Saundersfoot, UK

Vegetated Retaining Wall, Cutting Stabilisation, Webwall, Saundersfoot, UK

Suds Permeable Paving - Sudspave, Quarry Bank Mill, Style, Cheshire, UK

Suds Permeable Paving - Sudspave, Quarry Bank Mill, Style, Cheshire, UK

Erosion Control, Flood Embankment, Erosamat, Greatham, Hartlepool

Erosion Control, Flood Embankment, Erosamat, Greatham, Hartlepool

Stabilisation - Abweb and Abgrid, Quarry Bank Mill, Styal, Cheshire, UK

Stabilisation - Abweb and Abgrid, Quarry Bank Mill, Styal, Cheshire, UK