OVERVIEW
The Wave is a new inland-surfing lake, powered by 100% renewable electricity that provides the opportunity to surf all year round regardless of weather conditions or tides. The site’s entrance and car park suffered from boggy ground conditions following spells of wet weather and with approximately 2,750m2 of impermeable surfacing, there was limited potential for infiltration. The shuttle bus route between the main facilities and the car park is now surfaced with Truckcell 80 Permeable Paving blocks, filled with free draining angular gravel to allow rainwater to percolate down to the existing sub-soil.
Contact ABG by clicking the button below to find out which products were used in this case study.