The original waterproofing on the Maternity Hospital roof had exceeded its serviceable life and begun experiencing water ingress, requiring urgent remedial work. Bristol City Council wanted to optimise the roof area by installing a high quality, long lasting PV array that would contribute to its Solar City scheme that aims to provide one gigawatt of solar power to Bristol by 2020. The installation needed to cause minimal disruption to ongoing work at the hospital and insulation upgrades were necessary to ensure the roof achieved the required 0.25 U-Value.