This £8.3m building is used by London’s Royal Opera House to build scenery for its elaborate ballet and operatic performances. Located at the £60m High House Production Park, in Purfleet, which opened at the end of 2010, the workshop boasts outstanding green credentials.
No featured products in this case study
Contact Bauder Ltd by clicking the button below to find out which
products were used in this case study.