Stabilisation - Sudsweb, Abgrid & Terrex, Devour, Holmfirth, UK

OVERVIEW

In 2017 permission was granted for the redevelopment of an historic abandoned mill in Holmfirth into a restaurant and cookery school. It was soon clear the ground to be used for parking needed stabilisation. To completely dig out the area would have been costly and there was little time for unplanned work. ABG offered a stabilisation combination. Terrex SNW geotextile layer replaced the 50mm sand binding. Abgrid was used as a basel stiffening layer and Sudsweb tied to the grid with Abfix ties. Stone was then compacted ready for ABG permeable paving (see SuDS permeable paving Sudspave, Devour, Holmfirth)

No featured products in this case study

Contact ABG by clicking the button below to find out which products were used in this case study.

More case studies from ABG

View all case studies (31)
Suds Permeable Paving - Sudspave, Quarry Bank Mill, Style, Cheshire, UK

Suds Permeable Paving - Sudspave, Quarry Bank Mill, Style, Cheshire, UK

Erosion Control, Flood Embankment, Erosamat, Greatham, Hartlepool

Erosion Control, Flood Embankment, Erosamat, Greatham, Hartlepool

Stabilisation - Abweb and Abgrid, Quarry Bank Mill, Styal, Cheshire, UK

Stabilisation - Abweb and Abgrid, Quarry Bank Mill, Styal, Cheshire, UK

SuDS Pond - Groundwater Control, Pozidrain, Newcastle Airport, UK

SuDS Pond - Groundwater Control, Pozidrain, Newcastle Airport, UK