REQUIREMENT: Two temporary laboratories were scheduled to be installed on the hospital car park.


A ramp with a wide metal walkway was required to safely support the diverse range of hourly traffic accessing the cabins. Traffic would include patient-moving equipment, trollies, staff, and public footfall.


A fully compliant ramp was designed and installed with an extra wide metal walkway. This product has a safe loading capacity of over one tonne!


FEATURES INCLUDED:

  • Yellow Tread - this is a safety feature designed to help those with impaired vision identify the nose of the ramp or step. Additionally, it helps users distinguish any level changes.
  • Infill Handrail - if the ramp height exceeds 380mm, Infill handrail is a requirement to prevent users from climbing or falling through gaps.
  • 1100mm High Rail - 1100mm handrails are attached to any level sections.
  • Mesh Platform – a self-draining mesh platform allows water to pass through rather than puddle on the surface and potentially freeze. Minimum width: 1500mm.
  • Rest Platform - a rest platform at 5 metres is required to allow the user to pause.
  • Trombone Ends - these are added to the ends of a Rapid Ramp to prevent clothes catching.
  • Standard Continuous Handrail - this handrail system ensures the users always have support to hold onto.


EXTRA FEATURE INCLUDED:

  • Yellow 900mm High Handrail To Ramped Sections – designed to be gripped by children and wheelchair users. A bright colour such as yellow is generally the easiest to see because of the colour's ability to reflect light.


Products featured in this case study

View all products (7)
Modular Walkway Platform

Modular Walkway Platform

More case studies from Rapid Ramp Limited

View all case studies (20)
Hathersage Road Car Park, Manchester Royal Infirmary

Hathersage Road Car Park, Manchester Royal Infirmary

Carlisle Park Pavilion Cafe, Morpeth

Carlisle Park Pavilion Cafe, Morpeth

Holy Cross Preparatory School, Kingston upon Thames

Holy Cross Preparatory School, Kingston upon Thames

Euston Station, London

Euston Station, London

More case studies from Working platform and walkway systems

View all case studies (7)
Retail Store - Staines Upon Thames

Retail Store - Staines Upon Thames

Retail Store, Sheffield.

Retail Store, Sheffield.

New Facebook Data Centre. Ireland

New Facebook Data Centre. Ireland

Palmarsh Primary School, Hythe

Palmarsh Primary School, Hythe