You are viewing content for United Kingdom.

Choose a country to see content for your location. Changing region will navigate you to the homepage.

NBS Source
I'm a manufacturer

Sheares Hall Newcastle

OVERVIEW

At Sheares Hall, a major new student accommodation development on St James Boulevard in Newcastle, the façade strategy needed to balance architectural quality with strict performance, fire-safety and cost-efficiency targets. The project adopted DryKlad® across the primary residential elevations, with DryKlad Datona® introduced to deliver a refined, contemporary finish on key feature zones.

A significant advantage came from the use of the A2-rated DryKlad® isolator, which enabled a 100 mm reduction in the overall cladding zone without compromising thermal or fire performance. This leaner façade build-up not only improved spatial efficiency but also unlocked a 27% material cost saving at RIBA Stage 4, achieved through reduced insulation depth, a lighter substructure requirement and optimised bracket geometry — all contributing to a more economical and sustainable envelope.

The combination of DryKlad® and DryKlad Datona® provided Sheares Hall with a high-performance, fully compliant Rainscreen system capable of meeting the demands of a dense urban site. The resulting façade is modern, durable and precisely engineered, supporting the building’s role within the wider regeneration of the Newcastle Helix district while demonstrating the tangible project-stage value of an intelligent, engineered cladding support solution.

No featured products in this case study

Contact DryKlad by clicking the button below to find out which products were used in this case study.

More inspiration from DryKlad

View inspiration
Escapade Silverstone

Escapade Silverstone

Knoll Park Youth Centre Hove

Knoll Park Youth Centre Hove

Redcliffe Quarter Bristol

Redcliffe Quarter Bristol