OVERVIEW
Portakabin Ltd. were working on a project for Servicecare Support Services Ltd. to install a temporary canteen and locker room facility. They required the extra building space so they could continue to operate whilst adhering to social distancing measures throughout the COVID-19 pandemic.
Alongside the temporary building, they were in need of a wall mounted canopy along the right elevation to provide weather protection above the main entrance to the building that leads to the corridor.
Able Canopies have been working with Portakabin for a number of years, adding shade and shelter structures to their temporary buildings. Although our canopies are permanent structures, we have designed above ground planter pads and special wall brackets to enable us to install the canopies and take them down when they are on longer required.
These adaptions have been designed for our Coniston Wall Mounted Canopy and have been successfully used for many years now. The staff at Portakabin therefore put the Coniston Wall Mounted Canopy forward to Servicecare Support Ltd. who were pleased with the design and specifications and were happy to go ahead with the installation.
The final design was 10m in length with a 3m projection to cover the whole span of the temporary building and provide the weather protection required above the entrance.
Contact Able Canopies Ltd by clicking the button below to find out which products were used in this case study.
Prior Weston Primary School - Bespoke Solar Canopy
Nottingham Trent University - Cycle Compounds
Stables Market - Commercial Awnings
BBC Television Centre - Commercial Awning