You are viewing content for United Kingdom.
Choose a country to see content for your location. Changing region will navigate you to the homepage.
OVERVIEW
Aluline was selected to provide a full FOG management upgrade across a major financial institution in Saudi Arabia. The project required a robust, long-life solution suitable for large catering operations within multiple buildings.
Aluline supplied 27 stainless-steel Bio-Hydro grease management systems, supported by site-specific surveys, installation guidance, and WINTAC digital service tracking.
The systems were customised to the architectural and MEP layout of the bank’s internal kitchens and service areas, ensuring reliable compliance, reduced maintenance, and long-term sustainability performance.
This large-scale installation demonstrates Aluline’s capability to deliver engineered, high-volume, international solutions with full lifecycle support and data visibility.
Contact Aluline Ltd by clicking the button below to find out which products were used in this case study.
Connolly Hospital, Dublin – Custom Underground Grease Management System
Skysports DXV Vertiports, Dubai – Stainless-Steel Sand & Oil Interceptor System
Yas Island, Abu Dhabi – Stainless-Steel Grease & Drainage Systems for Landmark Leisure Destinations