Palmarsh Primary School, Hythe

OVERVIEW

PROJECT BACKGROUND: DDA improvement works were underway at the school, including widening the existing interior openings and adding new external doors with ramped access. 


REQUIREMENT: DDA compliant ramps with childproof, slip-resistant surface coverings.


END RESULT: Once the new doors were in place, we installed the DDA ramps accordingly with a 1:15 gradient.


Each system was fitted with our Safetread Rubber Surface. This is a soft, slip-resistant ramp covering that reduces the impact of falls. 

The product is made from the same materials used in soft play areas and is popular with nurseries, schools, and public facilities.


Plus, it is available in a range of colours and will continue to perform in all weather conditions.

Products featured in this case study

View all products (7)
Fully Compliant DDA Modular Ramp

Fully Compliant DDA Modular Ramp

Modular Walkway Platform

Modular Walkway Platform

More case studies from Rapid Ramp Limited

View all case studies (20)
Hathersage Road Car Park, Manchester Royal Infirmary

Hathersage Road Car Park, Manchester Royal Infirmary

Carlisle Park Pavilion Cafe, Morpeth

Carlisle Park Pavilion Cafe, Morpeth

Holy Cross Preparatory School, Kingston upon Thames

Holy Cross Preparatory School, Kingston upon Thames

Euston Station, London

Euston Station, London

More case studies from Working platform and walkway systems

View all case studies (6)
IFA2 Converter Station - GRP Products

IFA2 Converter Station - GRP Products

Noss-on-Dart Marina, UK

Noss-on-Dart Marina, UK

Kings Cross Station, London

Kings Cross Station, London

Offshore Technician Training Facility, Grimsby

Offshore Technician Training Facility, Grimsby

More case studies from Heavy steel stair or ramp systems

View all case studies (2)
Lincoln Cathedral, Lincoln

Lincoln Cathedral, Lincoln