NBS Source
I'm a manufacturer

P C Henderson Hardware Specified in Four Seasons Hotel in Tianjin, China

OVERVIEW

A total of 31 Flexirol Straight Sliding systems were installed as room dividers in the Presidential Suite and as sliding doors in the hotel’s conference rooms. Soltaire 120 hardware was employed in the grand ballroom, with two sets of our Securefold 150 folding door systems fitted in the hotel’s restaurant. Phase 1 of the build also included the installation of 32 Husky 100 sliding door hardware systems, complete with soft close mechanisms, in rooms for the hotel’s branded residences. The 2nd phase of the development will see the fit out of 143 rooms within the same tower.

No featured products in this case study

Contact P C Henderson Ltd by clicking the button below to find out which products were used in this case study.

More inspiration from P C Henderson Ltd

View inspiration
Securefold by P C Henderson: A Room With a View

Securefold by P C Henderson: A Room With a View

P C Henderson and SDS London Donate Products to Help Sam Robinson Gain Independence from Motor Neurone Disease

P C Henderson and SDS London Donate Products to Help Sam Robinson Gain Independence from Motor Neurone Disease

P C Henderson's Multidirectional Door Hardware Specified for De Maria Restaurant, Madrid

P C Henderson's Multidirectional Door Hardware Specified for De Maria Restaurant, Madrid

P C Henderson Sirocco Sliding System Specified for Amphia Hospital

P C Henderson Sirocco Sliding System Specified for Amphia Hospital