NBS Source
I'm a manufacturer

Metal Technology exemplifies best practice at Leeds College of Building

OVERVIEW

Metal Technology has contributed to achieving the desired aesthetic for the flagship Leeds College of Building Campus designed by Fuse (Leeds). The scheme utilised Metal Technology’s System 17 High Rise capped curtain walling and incorporated manual and automatic 4-20Hi+ casement opening vents. System 5-20D Hi+ doors completed the range of products used. These systems combined to deliver complete design flexibility, achieving not only a very high level of thermal performance, but also exceptional structural, security and acoustic performance. All Metal Technology systems comply with the latest British Standards and are Secured by Design certified.

No featured products in this case study

Contact Metal Technology Ltd by clicking the button below to find out which products were used in this case study.

More case studies from Metal Technology Ltd

View all case studies (14)
Clifton House, Glasgow

Clifton House, Glasgow

Merit House, Edgeware Road, London

Merit House, Edgeware Road, London

Metal Technology systems used in landmark £41m Health Innovation Campus at Lancaster University

Metal Technology systems used in landmark £41m Health Innovation Campus at Lancaster University

Northern Ireland’s First Passivhaus Plus College recognised by UN

Northern Ireland’s First Passivhaus Plus College recognised by UN