OVERVIEW
Wakefield has had a sporting boost with the construction of its new Minsthorpe Leisure Centre which was opened February 2018, after the 14-month project was completed on schedule. Facilities at the centre include a 25m, six-lane swimming pool, a 60-station health and fitness club and a group exercise studio.
The project cladding design underwent a value engineering programme and the originally specified product was changed to include our Trimapanel® smooth faced insulated panels for the external building envelope.