OVERVIEW
The refurbishment of Theatre 2 formed part of Milton Keynes University Hospital’s investment in upgrading surgical environments with advanced medical systems. The works required specialist doorsets capable of supporting high infection-control standards, radiation protection, and accessibility features, while maintaining a clean, modern aesthetic.
Dfendoor and Shieldoor were supplied due to their enhanced durability and infection control features. whilst remaining fully compliant with NHS theatre standards.
The Milton Keynes University Hospital Theatre 2 refurbishment highlights SDS’s ability to deliver specialist, compliant, and durable door solutions for surgical settings. Through tailored specifications, including lead shielding, contrasting finishes and infection-control detailing, SDS played a key role in supporting the hospital’s drive to provide world-class surgical care.
Contact Specialist Door Solutions by clicking the button below to find out which products were used in this case study.
Sancta Maria, Swansea
John Radcliffe Hospital
North Hampshire Endoscopy
Newham University Hospital