OVERVIEW
The combination of a rapid drying damp proof membrane and levelling and smoothing compound, enabled contractors to tackle the damp floor confidently, and complete the entire refurbishment over the half-term holiday period.
ARDEX DPM 1 C One Coat Damp Proof Membrane