This site uses cookies to store information on your computer. Learn more about these cookies, and how to opt out of them. Find out more

NBS Source

Mearns Castle High School - Glasgow

OVERVIEW

The combination of a rapid drying damp proof membrane and levelling and smoothing compound, enabled contractors to tackle the damp floor confidently, and complete the entire refurbishment over the half-term holiday period.

Products featured in this case study

View all products (88)
ARDEX DPM 1 C One Coat Damp Proof Membrane

ARDEX DPM 1 C One Coat Damp Proof Membrane

More case studies from Ardex Ltd – Flooring, Tiling & Screeding products

View all case studies (50)
ARDEX Completes Another ‘Historic’ Project

ARDEX Completes Another ‘Historic’ Project

DAVID LLOYD LEISURE CLUB

DAVID LLOYD LEISURE CLUB

St George's Chapel - Westminster Cathedral London

St George's Chapel - Westminster Cathedral London

Scottish Parliament

Scottish Parliament

More case studies from Concrete sealers

View all case studies (10)
Schneider Electronics Factory - Koster Flooring Systems

Schneider Electronics Factory - Koster Flooring Systems

Koster Flooring Systems, 96 Middlesex St. London

Koster Flooring Systems, 96 Middlesex St. London

Koster Floor coatings to a domestic garage.

Koster Floor coatings to a domestic garage.

Aintree Racecourse - Koster Flooring Systems to Grandstand

Aintree Racecourse - Koster Flooring Systems to Grandstand