OVERVIEW
Contact Promat UK by clicking the button below to find out which products were used in this case study.
Manchester Airport Case Study - PROMAT DURASTEEL to create 60-minute fire-rated ceiling
Stronelairg Wind Farm Case Study - Promat, Duratseel
The role of vacuum insulated panels (VIP) in FHS’s ‘world-leading energy efficiency’ goal
SYSTEMGLAS® Ligna provides assured fire protection for timber framed butt-jointed glazing