NBS Source
I'm a manufacturer

Leeds University (Houldsworth Building)

OVERVIEW

GSS designed this superb lecture theatre incorporating our Topakustik 9/2M for the ceiling and wall. The fantastic finish was installed by Titan (Horbury Group) on behalf of Galliford Try installed the Topakustik product between the plaster board sections.

No featured products in this case study

Contact Acoustic Products Ltd by clicking the button below to find out which products were used in this case study.

More case studies from Acoustic Products Ltd

View all case studies (34)
Acoustic Products launches semi-automatic electric movable wall

Acoustic Products launches semi-automatic electric movable wall

Bloomberg - The Vortex

Bloomberg - The Vortex

Kings College - Bush Hall Auditorium

Kings College - Bush Hall Auditorium

Beacon of Light - Sports Hall

Beacon of Light - Sports Hall