NBS Source
I'm a manufacturer

LANSWOODPARK BUSINESS CENTRE, COLCHESTER

OVERVIEW

Over 2,000m2 of Tata Steel’s insulated roof and wall panels were used in the construction of Phase 1 and Phase 2 of the development. Around 1,000m2 of Trisomet® 120mm panels in Colorcoat HPS200 Ultra® pre-finished steel in Goosewing Grey were used on the roof and nearly 1,100m2 of Trisomet® 80mm and Trimapanel® micro-rib 90mm panels in Colorcoat Prisma® in Ephyra were used on the wall elevations. The wall elevations were finished off with Anthracite soffits.

No featured products in this case study

Contact Tata Steel by clicking the button below to find out which products were used in this case study.

More inspiration from Tata Steel

View inspiration
Foodmate Industrial buildings

Foodmate Industrial buildings

The Goldsmith Avenue

The Goldsmith Avenue

NEW ORKNEY HOSPITAL

NEW ORKNEY HOSPITAL

MAPLEFIELDS SCHOOL

MAPLEFIELDS SCHOOL