OVERVIEW
Non-Conductive Fencing, Trench Covers and Access Structures | Case Study
Power and Energy Infrastructure Contractor Morgan Sindall was appointed to design, build and commission the new converter station and chose to work with Dura Composites to provide safe, non- metallic Glass Reinforced Polymer (GRP) utility fencing for the AC/DC Halls, as well as a range of non-conductive access structures, utility trench covers & handrailing across the site.
The IFA2 project aims to connect the electricity systems of Great Britain and France using high voltage subsea cables and will be capable of exporting or importing 1000MW of power between the UK and France, enough to power up to 1 million homes. In this project, the client specification mandated the use of non-conductive and non-metallic materials which could be used to construct removable fencing, permanent fencing and sliding gates to enable access to specific authorised personnel, whilst preventing others from accessing high-risk areas.
Dura Slab Type 100
Dura Key Clamp Handrailing
d² Dura Access Structures
d² Dura Grating Standard Mesh
Luxury Car Valeting Centre, Belfast
Noss-on-Dart Marina, UK
Kings Cross Station, London
West Ham Stadium, London
Luxury Car Valeting Centre, Belfast
Noss-on-Dart Marina, UK
Kings Cross Station, London
West Ham Stadium, London
Noss-on-Dart Marina, UK
Kings Cross Station, London
Offshore Technician Training Facility, Grimsby
Palmarsh Primary School, Hythe
Luxury Car Valeting Centre, Belfast
Noss-on-Dart Marina, UK
Shard Place Riser Install, London
Offshore Technician Training Facility, Grimsby
Hilton Garden Inn, Terminal 2, Heathrow Airport