The client was looking to replace an old 67 metre long wooden walkway surrounding a pool. Their contractor recommended the Decking system due to the low profile aluminium substructure and moisture-proof composite boards which require far less ongoing maintenance. The installer removed the old decking to reveal the sub base, then used Wallbarn’s heavy duty MegaPad pedestals to underpin the iDecking rail system. Our proposed laying pattern complemented the architect’s original design, drawing the eye down the length of the walkway. The entire job took two weeks to complete. The client is delighted with the results.