by Wallbarn Ltd
This 115m² project was a large luxury new-build. The decking required two distinct build-up methods around the house. One section was on a waterproofing membrane, the other on a steel framed walkway. Adjustable support pedestals were loose-laid onto the membrane. iDecking aluminium rail system was set onto the pedestals and EasyClick boards were clicked into place. Pedestals lifted the decking structure off the membrane allowing free drainage and creating a level surface on the falling roof. Aluminium rails were mechanically fixed to the steel structure and the whole terrace was set to one, seamless level wrapping around the house.
Contact Wallbarn Ltd by clicking the button below to find out which products were used in this case study.