The client was looking to replace an old wooden walkway. Their contractor recommended iDecking because of its low profile aluminium substructure and composite boards which require far less ongoing maintenance. The installer removed the old decking then used Wallbarn’s heavy duty MegaPad pedestals to underpin the iDecking rail system. These were screwed to the concrete lintels before the aluminium under rails were screwed into the pedestals. The laying pattern followed the architect’s original design, drawing the eye down the length of the walkway. This job took 2 weeks to complete and the client is delighted with the results.