OVERVIEW
A multiphase regeneration project consisting of well over 1,200 new homes, community facilities, and a central park with communal facilities and a soft-play area.
The regeneration project started back in 2010, phase 2 saw run between January 2011 and April 2013, phase 3 finished at the end of 2017, phase 4 delivered new homes during the 2nd half of 2018, while the latest phases started in 2019 and complete in 2024.
Greenside Landscapes were awarded the Hard & Soft Landscaping at Heathside & Lethbridge in Lewisham, for which we supplied our TerraSmart Rail Paving System to support the rectangular concrete pavers in the communal podium space.
The system, which is fully non-combustible, it’s made up of super-strong, 100% recyclable aluminium joists, which overlap to create a lattice framework, offering the maximum possible level of support, especially suited to high trafficked areas.
The paving system featured a build-up of approximately 300mm and was perfectly integrated into the soft landscaping and soft play areas. Another example of a similar system deployment, in which we worked again with Greenside Landscapes, was the IKEA Hammersmith roof-terrace project.
Rail Paving System - TerraSmart® IGNO
Island Point Apartments, London
Case Study: M7 Roof Terrace
Wood Wharf A2/A3 Roof Terraces, Canary Wharf
Caledonian Road Apartments, London
Manchester Victoria - Residential Balconies
The Old War Office - Refurbishment
University of Liverpool
IKEA Hammersmith