NBS Source
List your products

Gypsol Flowing Screed Helps recover proram for 50 bed care home

by GYPSOL - LKAB

  Favourite

The main contractor, with many years’ experience of building bespoke care homes throughout the UK has successfully used flowing screeds in their projects for over a decade. This project was to be no exception and the main contractor needed advice on before finalizing the specification. The screed was to be placed on insulation at both ground and first floor underfloor heating systems. It needed to be as thin as possible. It needed to be installed quickly because, time scales were tight. Finally it needed to offer a rapid drying time to allow completion of floor coverings.

Read more

No featured products in this case study

Contact GYPSOL - LKAB by clicking the button below to find out which products were used in this case study.

More case studies from GYPSOL - LKAB

View all case studies from GYPSOL - LKAB (9)