NBS Source
I'm a manufacturer

Geschwender at Center Parcs Resorts

OVERVIEW

Architect: Holder Mathias Architects

Installer: Bowmer and Kirkland, LSA Projects Ltd, and Geschwender


Product: Geschwender Lockers, Cubicles, and Accessories with Metra Electronic Locking Solutions

LSA Projects Ltd and Geschwender have been working with Center Parcs since 2010 to refit the changing areas at their UK sites.
In total LSA have supplied over 3,000 lockers to sites at Elvedon, Whinfell, Woburn and Sherwood in addition to hundreds of cubicle solutions and vanity stations to the changing villages. Center Parcs and Holder Mathias Architects specified brightly coloured bays of lockers to help guide guests through the areas of the changing villages.

Original installations used traditional coin and key access for their lockers but all sites have now been fitted with Metra systems for keyless lockers. The smart-wristbands issued to Center Parcs guests at check-in works as both the key to their accommodation and their tool to assign lockers at the Sub-Tropical Swimming Paradises and Spas.

Using smart locker allocation has the added bonus of allowing guests to locate their specific locker from hundreds on each site using a central display monitor and allows staff to clear locker allocations overnight for cleaning and ready for new guests in the morning.




Products featured in this case study

View all products (19)
Geschwender Lockers

Geschwender Lockers

Geschwender Cubicle Systems

Geschwender Cubicle Systems

Geschwender Duct Walling

Geschwender Duct Walling

Geschwender Vanity Units

Geschwender Vanity Units

More case studies from LSA Projects Ltd

View all case studies (47)
University of Bedford Luton Campus

University of Bedford Luton Campus

St Johns School Leatherhead

St Johns School Leatherhead

Orchard Brae School

Orchard Brae School

Wymondham Leisure Centre

Wymondham Leisure Centre

More case studies from Lockers

View all case studies (35)
Investment bank project, Lockers

Investment bank project, Lockers

Laminate Lockers & Z Lockers at 72 Welbeck Street, London

Laminate Lockers & Z Lockers at 72 Welbeck Street, London

Heated Lockers at the Innovation Hub, Production Park

Heated Lockers at the Innovation Hub, Production Park

Ipswich Town Football Club Project

Ipswich Town Football Club Project

More case studies from Duct and wall panel lining systems

View all case studies (26)
Aberavon Aqua Splash

Aberavon Aqua Splash

Ysgol Y Bynea

Ysgol Y Bynea

Ysgol Saron

Ysgol Saron

Newhaven Holiday Park

Newhaven Holiday Park

More case studies from Vanity units

View all case studies (14)
Cherry Pips Day Nursery

Cherry Pips Day Nursery

Helensburgh Leisure Centre Project

Helensburgh Leisure Centre Project

St Sidwells Point Leisure Centre Project

St Sidwells Point Leisure Centre Project

The Pyramids Centre Leisure Complex Project

The Pyramids Centre Leisure Complex Project

More case studies from Fully-framed panel cubicle systems

View all case studies (13)
Aberavon Aqua Splash

Aberavon Aqua Splash

Newhaven Holiday Park

Newhaven Holiday Park

Heathrow Primary School

Heathrow Primary School

Norwich High School for Girls

Norwich High School for Girls