When the Gatwick consortium began renovation on the South terminal of Gatwick Airport they needed to ensure that the new floors were protected against movement of the daily traffic that they endure. Genesis provided a solution; working with the architects and installation contractors a cost effective Stainless Steel Movement Joint was selected from the Genesis range. Renovations been part of an £850million investment to see the replacement of floors and ceilings and enhance the experience travellers receive; Genesis movement Joint meets and exceeds all standards of Movement Joints and will save the floors from cracking long into the future.