Equinor Snøhvit - Chartek 7 - LNG (Liquefied Natural Gas) Plant & Export Terminal

OVERVIEW

Chartek 7 was specified for this project, as an epoxy intumescent coating with an outstanding track record of protection against hydrocarbon fires dating back to 1995.

The PFP system had to be able withstand explosion loads in excess for 4bar while maintaining its integrity, and Chartek 7 easily met these requirements.

Using Chartek also provided productivity benefits, due to its high build and simple meshing system, along with a low weight per unit area, helping to reduce transportation costs for pre-fabricated units.

Pre-fabrication played an important role in this project, due to the harsh environmental conditions and remoteness of the site. Steel components were constructed at locations across Europe, with the emphasis on minimizing installation and delivery costs.

The ability of AkzoNobel to provide standardized global products and a high level of technical support helped to streamline and add value to this process, complementing the productivity benefits of Chartek.

No featured products in this case study

Contact International®, brand of AkzoNobel by clicking the button below to find out which products were used in this case study.

More inspiration from International®, brand of AkzoNobel

View inspiration
Shanghai Tower - Interchar 1983 - Infrastructure

Shanghai Tower - Interchar 1983 - Infrastructure

Auckland Art Gallery - Interzinc 42, Intergard 251, Interthane 990, Interchar 963 - Infrastructure - Architecture

Auckland Art Gallery - Interzinc 42, Intergard 251, Interthane 990, Interchar 963 - Infrastructure - Architecture

Starfield Shopping Mall - Intercure 200, Interthane 870 - Infrastructure

Starfield Shopping Mall - Intercure 200, Interthane 870 - Infrastructure

Ichthys Venturer - Chartek 7E - Floating Production Storage & Offloading (FPSO) vessel

Ichthys Venturer - Chartek 7E - Floating Production Storage & Offloading (FPSO) vessel