OVERVIEW
Based on a proven formulation that has been used in more than 60% of the world’s offshore oil and gas facilities, Chartek 7E was the natural PFP choice to secure the specified lifetime of this vessel.
This tried-and-tested formulation is the result of AkzoNobel’s decades of technology leadership and continuous innovation, powered by unrivalled testing capabilities that allow coatings to be exposed to a wide array of extreme conditions in order to measure resistance. Combined with the expertise gathered from protecting more than 6 million square meters of steelwork over the last 25 years with Chartek 7 alone, AkzoNobel is highly equipped to provide PFP solutions to the oil and gas industry worldwide.
Chartek 7 is one of the core products of the Chartek range, with a track record of over 20 years providing exceptional protection against pool and jet fires, with proven long-term resistance against fire damage and corrosion. Chartek 7E applies the same technology with a self-reinforced formula that is mesh-free, helping to achieve weight reduction through a safety-first approach.
Contact International®, brand of AkzoNobel by clicking the button below to find out which products were used in this case study.
Shanghai Tower - Interchar 1983 - Infrastructure
Auckland Art Gallery - Interzinc 42, Intergard 251, Interthane 990, Interchar 963 - Infrastructure - Architecture
Starfield Shopping Mall - Intercure 200, Interthane 870 - Infrastructure
Valhall Oilfield BP - Interzone 1000, Chartek 7, Interzinc 52 - Fire Protection