Jaguar planned a £500m investment for their first in-house engine manufacturing facility. Opened by Her Majesty, it currently produces 400,000 Ingenium petrol and diesel engines a year. Norwood worked with Interserve to deliver this ground-breaking project to the highest standards. The overall project won the Regeneration award at the RICS Awards Grand Final.


OUR SCOPE OF WORK


The main challenge was to provide a 120Min fire-rated demountable compartment wall at 11 meters high. Norwood teamed up with Interserve, developing our 200mm Mediline system, which was subjected to excessive laboratory testing to achieve the 120Min Fire Rated certification. In addition to solid partitions, Norwood supplied a 90Min fire-rated 9-meter high glazed partition wall which provided a viewing gallery from the grand reception onto the manufacturing floor.


In addition to the fire-rated compartment walls, Norwood provided a self-supporting machine and QC enclosures. The enclosures had to give a clean environment to a GMP standard; therefore, they had their own mechanical equipment, which was all supported by the Norwood enclosure. This was delivered by designing and installing a bespoke PodSolve system which consisted of a hidden ceiling joist system that provided the structural support for the mechanical equipment.


Norwood often returns to Jaguar Land Rover providing modifications without business interruption to the build as their product cycle changes.

Products featured in this case study

View all products (15)
Mediline Partitions 100 mm Glazed Non Fire Rated

Mediline Partitions 100 mm Glazed Non Fire Rated

Mediline Partition 200 mm Fire Rated

Mediline Partition 200 mm Fire Rated

Mediline Partition 200 mm Glazed Fire Rated

Mediline Partition 200 mm Glazed Fire Rated

More case studies from Norwood Group Limited

View all case studies (11)
cGMP Advanced Manufacturing Area for Orthoplastics

cGMP Advanced Manufacturing Area for Orthoplastics

Compound Semiconductor Innovation Centre for CSA Catapult

Compound Semiconductor Innovation Centre for CSA Catapult

The Compound Semiconductor Facility for IQE

The Compound Semiconductor Facility for IQE

cGMP Global Packing Centre for AstraZeneca

cGMP Global Packing Centre for AstraZeneca

More case studies from Partition panels

View all case studies (58)
cGMP Advanced Manufacturing Area for Orthoplastics

cGMP Advanced Manufacturing Area for Orthoplastics

Compound Semiconductor Innovation Centre for CSA Catapult

Compound Semiconductor Innovation Centre for CSA Catapult

The Compound Semiconductor Facility for IQE

The Compound Semiconductor Facility for IQE

cGMP Global Packing Centre for AstraZeneca

cGMP Global Packing Centre for AstraZeneca