CV Pumping

by Anhydritec Ltd

  Favourite

A faster drying screed required over Lewis metal decking system on a first floor. Gyvlon FD, the screed is compatible with the Lewis system and gave the client the re assurance that the 6 week deadline would comfortably be achieved. Floor was dry for floor coverings after 28 days.