NBS Source
I'm a manufacturer

Chelsea Barracks - Halifax Soil BS EN 877

OVERVIEW

Over 1700 meters of pipe, 3500 couplings and thousands of fittings supplied, via PVC & Keyline, to the £3bn ongoing redevelopment of Chelsea Barracks in London.


Not the most exciting photos, we appreciate that, but the project itself very much was for us at Hargreaves. Our Kitemarked Halifax Soil cast iron system is fully compliant with BS EN 877, and offers the chance to value engineer a project without having to sacrifice on the unbeatable fire resistant and acoustic dampening properties of a cast iron system.


The Chelsea Barracks development was the most sustainable development in Europe in 2021. One of only 16 developments in the world to achieve LEED platinum certification for green building in spring 2021.

No featured products in this case study

Contact Hargreaves Foundry Drainage Ltd by clicking the button below to find out which products were used in this case study.

More inspiration from Hargreaves Foundry Drainage Ltd

View inspiration
Queensway Tunnel, Merseyside - Halifax Drain BS EN 877

Queensway Tunnel, Merseyside - Halifax Drain BS EN 877

Blackpool Multi-Storey Car Park - Coastal Finish Soil System

Blackpool Multi-Storey Car Park - Coastal Finish Soil System

Manchester Town Hall - Premier Rainwater Ornamental Pipes

Manchester Town Hall - Premier Rainwater Ornamental Pipes

NHS Queen Alexandra Hospital, Portsmouth - Halifax Soil BS EN 877

NHS Queen Alexandra Hospital, Portsmouth - Halifax Soil BS EN 877